Building Published 05/18/2026. 22 classifications. Covers 1 county: Richmond
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 33.90 | 18.80 | 52.70 |
| ELECTRICIAN | 32.25 | 16.95 | 49.20 |
| POWER EQUIPMENT OPERATOR: (BACKHOE/ EXCAVATOR/ TRACKHOE) | 33.00 | 17.70 | 50.70 |
| OPERATOR: CRANE | 38.53 | 16.08 | 54.61 |
| OPERATOR: FORKLIFT | 32.93 | 16.08 | 49.01 |
| IRONWORKER: ORNAMENTAL | 32.00 | 15.05 | 47.05 |
| IRONWORKER, STRUCTURAL | 32.00 | 15.05 | 47.05 |
| PIPEFITTER | 41.18 | 17.01 | 58.19 |
| SHEET METAL WORKER | 38.29 | 17.40 | 55.69 |
| PLUMBER | 28.28 | 2.41 | 30.69 |
| PAINTER: SPRAY | 16.29 | — | 16.29 |
| PAINTER (BRUSH AND ROLLER) | 16.14 | — | 16.14 |
| OPERATOR: ROLLER | 14.05 | — | 14.05 |
| OPERATOR: LOADER | 14.86 | — | 14.86 |
| OPERATOR: GRADER/BLADE | 16.80 | — | 16.80 |
| OPERATOR: BULLDOZER | 15.23 | — | 15.23 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 14.88 | — | 14.88 |
| LABORER: PIPELAYER | 12.55 | 1.90 | 14.45 |
| LABORER: COMMON OR GENERAL | 13.29 | — | 13.29 |
| CEMENT MASON/CONCRETE FINISHER | 22.92 | — | 22.92 |
| CARPENTER | 24.83 | — | 24.83 |
| IRONWORKER: REINFORCING | 31.31 | 17.68 | 48.99 |