Highway Published 05/18/2026. 40 classifications. Covers 1 county: Wheeler
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: SEMI/TRAILER TRUCK | 16.99 | — | 16.99 |
| TRUCK DRIVER: WATER TRUCK | 11.25 | — | 11.25 |
| TRUCK DRIVER: PICKUP TRUCK | 14.41 | — | 14.41 |
| TRUCK DRIVER: LOWBOY TRUCK | 17.31 | — | 17.31 |
| TRUCK DRIVER: HYDROSEEDER TRUCK | 11.23 | — | 11.23 |
| TRUCK DRIVER: FLATBED TRUCK | 15.42 | 2.02 | 17.44 |
| TRUCK DRIVER: DUMP TRUCK | 12.99 | 1.80 | 14.79 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 12.00 | — | 12.00 |
| TRAFFIC CONTROL: FLAGGER | 13.68 | — | 13.68 |
| OPERATOR: SHUTTLE BUGGY | 12.00 | — | 12.00 |
| OPERATOR: SCREED | 12.16 | — | 12.16 |
| OPERATOR: SCRAPER | 13.16 | — | 13.16 |
| OPERATOR: ROLLER | 12.25 | — | 12.25 |
| OPERATOR: PILEDRIVER | 20.34 | 2.86 | 23.20 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 14.19 | — | 14.19 |
| OPERATOR: MILLING MACHINE GROUNDSMAN | 13.00 | — | 13.00 |
| OPERATOR: MILLING MACHINE | 14.03 | — | 14.03 |
| OPERATOR: MECHANIC | 21.42 | — | 21.42 |
| OPERATOR: LOADER | 13.85 | — | 13.85 |
| OPERATOR: HYDROSEEDER | 15.64 | — | 15.64 |
| OPERATOR: GRADER/BLADE | 19.17 | 2.84 | 22.01 |
| OPERATOR: DISTRIBUTOR | 14.82 | — | 14.82 |
| OPERATOR: CRANE | 20.07 | — | 20.07 |
| OPERATOR: CONCRETE SAW | 15.50 | 0.71 | 16.21 |
| OPERATOR: COMPACTOR | 13.36 | 2.36 | 15.72 |
| OPERATOR: BULLDOZER | 15.29 | — | 15.29 |
| OPERATOR: BROOM/SWEEPER | 13.71 | — | 13.71 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 15.67 | 1.80 | 17.47 |
| LABORER: COMMON OR GENERAL, INCLUDES EROSION CONTROL | 10.40 | — | 10.40 |
| LABORER: ASPHALT (INCLUDES DISTRIBUTOR, RAKER, SCREED, SHOVELER, AND SPREADER) | 12.82 | — | 12.82 |
| LABORER: PIPELAYER | 13.20 | 2.49 | 15.69 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 11.96 | — | 11.96 |
| LABORER: GRADE CHECKER | 12.76 | — | 12.76 |
| IRONWORKER, STRUCTURAL | 17.10 | — | 17.10 |
| IRONWORKER, REINFORCING | 15.38 | — | 15.38 |
| INSTALLER - GUARDRAIL | 15.29 | — | 15.29 |
| HIGHWAY/PARKING LOT STRIPING: OPERATOR (STRIPING MACHINE) | 12.40 | 1.94 | 14.34 |
| FORM WORKER | 12.50 | — | 12.50 |
| CEMENT MASON/CONCRETE FINISHER | 15.21 | — | 15.21 |
| CARPENTER, EXCLUDES FORM WORK | 15.37 | — | 15.37 |