Highway Published 08/13/2026. 35 classifications. Covers 1 county: St Lucie
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER | 19.98 | — | 19.98 |
| CEMENT MASON/CONCRETE FINISHER | 20.11 | — | 20.11 |
| ELECTRICIAN | 33.67 | 10.06 | 43.73 |
| IRONWORKER | 24.44 | — | 24.44 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 16.74 | — | 16.74 |
| LABORER: COMMON OR GENERAL | 15.21 | — | 15.21 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 20.24 | 2.01 | 22.25 |
| LABORER: PIPELAYER | 17.14 | — | 17.14 |
| LABORER: GRADE CHECKER | 17.21 | — | 17.21 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 20.52 | 1.23 | 21.75 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 17.66 | — | 17.66 |
| OPERATOR: BOOM | 33.61 | 11.50 | 45.11 |
| OPERATOR: BROOM/SWEEPER | 16.46 | — | 16.46 |
| OPERATOR: BULLDOZER | 20.58 | — | 20.58 |
| OPERATOR: CRANE | 34.63 | — | 34.63 |
| OPERATOR: GRADER/BLADE | 19.25 | — | 19.25 |
| OPERATOR: LOADER | 17.77 | — | 17.77 |
| OPERATOR: MECHANIC | 29.69 | — | 29.69 |
| OPERATOR: MILLING MACHINE | 19.68 | — | 19.68 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 21.71 | — | 21.71 |
| OPERATOR: PILEDRIVER | 22.02 | — | 22.02 |
| OPERATOR: ROLLER | 16.98 | — | 16.98 |
| OPERATOR: SCRAPER | 15.54 | — | 15.54 |
| OPERATOR: SCREED | 19.24 | — | 19.24 |
| OPERATOR: TRACTOR | 16.91 | 0.66 | 17.57 |
| PAINTER | 21.02 | — | 21.02 |
| TRAFFIC CONTROL: FLAGGER | 18.50 | 0.85 | 19.35 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 16.51 | — | 16.51 |
| TRAFFIC SIGNAL INSTALLATION/HIGHWAY LIGHTING | 25.29 | — | 25.29 |
| TRUCK DRIVER: DUMP TRUCK | 16.77 | — | 16.77 |
| TRUCK DRIVER: FLATBED TRUCK | 19.46 | — | 19.46 |
| TRUCK DRIVER: LOWBOY TRUCK | 21.36 | 2.45 | 23.81 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | 16.55 | — | 16.55 |
| TRUCK DRIVER: WATER TRUCK | 18.27 | — | 18.27 |
| TRUCK DRIVER: DISTRIBUTOR TRUCK | 19.28 | — | 19.28 |