| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER | 22.72 | — | 22.72 |
| CEMENT MASON/CONCRETE FINISHER | 20.18 | 1.49 | 21.67 |
| ELECTRICIAN | 33.05 | 10.79 | 43.84 |
| IRONWORKER | 24.16 | — | 24.16 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 16.92 | — | 16.92 |
| LABORER: COMMON OR GENERAL | 14.99 | — | 14.99 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 21.43 | 3.75 | 25.18 |
| LABORER: PIPELAYER | 21.63 | — | 21.63 |
| LABORER: GRADE CHECKER | 17.21 | — | 17.21 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 23.27 | — | 23.27 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 21.30 | — | 21.30 |
| OPERATOR: BOOM | 33.61 | 11.50 | 45.11 |
| OPERATOR: BROOM/SWEEPER | 17.12 | — | 17.12 |
| OPERATOR: BULLDOZER | 22.37 | 3.44 | 25.81 |
| OPERATOR: CRANE | 32.18 | — | 32.18 |
| OPERATOR: GRADER/BLADE | 19.25 | — | 19.25 |
| OPERATOR: LOADER | 20.00 | 2.79 | 22.79 |
| OPERATOR: MECHANIC | 29.69 | — | 29.69 |
| OPERATOR: MILLING MACHINE | 20.86 | 1.95 | 22.81 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 19.73 | — | 19.73 |
| OPERATOR: PILEDRIVER | 25.18 | — | 25.18 |
| OPERATOR: ROLLER | 18.28 | — | 18.28 |
| OPERATOR: SCRAPER | 15.54 | — | 15.54 |
| OPERATOR: SCREED | 17.84 | — | 17.84 |
| OPERATOR: TRACTOR | 16.00 | 0.68 | 16.68 |
| PAINTER | 21.02 | — | 21.02 |
| TRAFFIC CONTROL: FLAGGER | 14.69 | 3.56 | 18.25 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 15.96 | — | 15.96 |
| TRAFFIC SIGNAL INSTALLATION/HIGHWAY LIGHTING | 23.69 | 3.40 | 27.09 |
| TRUCK DRIVER: DUMP TRUCK | 16.64 | — | 16.64 |
| TRUCK DRIVER: FLATBED TRUCK | 19.46 | — | 19.46 |
| TRUCK DRIVER: LOWBOY TRUCK | 20.76 | — | 20.76 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | 16.55 | — | 16.55 |
| TRUCK DRIVER: WATER TRUCK | 18.27 | — | 18.27 |
| TRUCK DRIVER: DISTRIBUTOR TRUCK | 21.19 | — | 21.19 |