Highway Published 08/13/2026. 26 classifications. Covers 1 county: Putnam
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER | 14.98 | — | 14.98 |
| CEMENT MASON/CONCRETE FINISHER | 20.00 | 0.82 | 20.82 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 15.96 | — | 15.96 |
| LABORER: COMMON OR GENERAL | 14.63 | — | 14.63 |
| LABORER: PIPELAYER | 17.00 | 0.70 | 17.70 |
| LABORER: GRADE CHECKER | 14.67 | — | 14.67 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 18.00 | 0.74 | 18.74 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 18.10 | — | 18.10 |
| OPERATOR: BROOM/SWEEPER | 14.96 | — | 14.96 |
| OPERATOR: BULLDOZER | 16.63 | — | 16.63 |
| OPERATOR: CRANE | 33.33 | — | 33.33 |
| OPERATOR: GRADER/BLADE | 17.17 | — | 17.17 |
| OPERATOR: LOADER | 16.00 | — | 16.00 |
| OPERATOR: MECHANIC | 16.10 | 0.68 | 16.78 |
| OPERATOR: MILLING MACHINE | 18.31 | 2.22 | 20.53 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 17.69 | — | 17.69 |
| OPERATOR: ROLLER | 15.00 | — | 15.00 |
| OPERATOR: SCREED | 17.54 | — | 17.54 |
| TRAFFIC CONTROL: FLAGGER | 12.89 | — | 12.89 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 15.00 | — | 15.00 |
| TRAFFIC SIGNAL INSTALLATION/HIGHWAY LIGHTING | 21.13 | 3.30 | 24.43 |
| TRUCK DRIVER: DUMP TRUCK | 17.13 | — | 17.13 |
| TRUCK DRIVER: LOWBOY TRUCK | 23.00 | 0.94 | 23.94 |
| TRUCK DRIVER: WATER TRUCK | 17.87 | — | 17.87 |
| TRUCK DRIVER: DISTRIBUTOR TRUCK | 19.84 | — | 19.84 |
| TRUCK DRIVER: PILOT CAR | 14.75 | — | 14.75 |