Building Published 05/18/2026. 31 classifications. Covers 2 counties: Flagler, Volusia
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 30.12 | 13.11 | 43.23 |
| ELECTRICIAN | 31.02 | 14.43 | 45.45 |
| ELEVATOR MECHANIC FOOTNOTE: A. EMPLOYER CONTRIBUTIONS 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS LESS THAN 5 YEARS. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | 53.73 | 38.44 | 92.17 |
| OPERATOR: OILER | 23.50 | 9.20 | 32.70 |
| OPERATOR: MECHANIC | 32.05 | 9.20 | 41.25 |
| OPERATOR: FORKLIFT | 23.25 | 9.20 | 32.45 |
| OPERATOR: CRANE (TOWER CRANE; CRAWLER CRANE; TRUCK CRANE; HYDRO CRANE) | 36.00 | 15.10 | 51.10 |
| OPERATOR: CRANE (GANTRY CRANE; BRIDGE CRANE) | 36.00 | 15.10 | 51.10 |
| IRONWORKER: ORNAMENTAL | 28.90 | 15.66 | 44.56 |
| PLUMBER | 41.60 | 22.68 | 64.28 |
| HVAC MECHANIC: INCLUDES PIPE AND UNIT INSTALLATION | 33.90 | 15.15 | 49.05 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 35.03 | 24.00 | 59.03 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | 25.75 | 16.92 | 42.67 |
| TRUCK DRIVER: LOWBOY TRUCK | 14.24 | — | 14.24 |
| TRUCK DRIVER: DUMP TRUCK | 12.95 | 2.28 | 15.23 |
| TILE SETTER | 17.25 | 1.74 | 18.99 |
| ROOFER | 16.59 | — | 16.59 |
| PIPEFITTER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | 23.16 | 10.34 | 33.50 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 13.54 | — | 13.54 |
| OPERATOR: ROLLER | 14.43 | 4.78 | 19.21 |
| OPERATOR: LOADER | 16.30 | — | 16.30 |
| OPERATOR: GRADER/BLADE | 18.97 | — | 18.97 |
| OPERATOR: BULLDOZER | 15.40 | 1.90 | 17.30 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 17.80 | 2.81 | 20.61 |
| LABORER: PIPELAYER | 15.00 | 0.54 | 15.54 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 12.00 | — | 12.00 |
| LABORER: COMMON OR GENERAL | 11.61 | — | 11.61 |
| IRONWORKER, STRUCTURAL | 21.87 | — | 21.87 |
| IRONWORKER, REINFORCING | 22.81 | 11.58 | 34.39 |
| CEMENT MASON/CONCRETE FINISHER | 19.00 | — | 19.00 |
| CARPENTER | 17.92 | — | 17.92 |