Building Published 05/18/2026. 29 classifications. Covers 1 county: Seminole
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 30.12 | 13.11 | 43.23 |
| CARPENTER (INCLUDES FORM WORK) | 28.65 | 13.80 | 42.45 |
| ELEVATOR MECHANIC FOOTNOTE: A. EMPLOYER CONTRIBUTIONS 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS LESS THAN 5 YEARS. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | 53.73 | 38.44 | 92.17 |
| OPERATOR: OILER | 23.50 | 9.20 | 32.70 |
| OPERATOR: MECHANIC | 32.05 | 9.20 | 41.25 |
| OPERATOR: FORKLIFT | 23.25 | 9.20 | 32.45 |
| OPERATOR: CRANE (TOWER CRANE; CRAWLER CRANE; TRUCK CRANE; HYDRO CRANE) | 36.00 | 15.10 | 51.10 |
| OPERATOR: CRANE (GANTRY CRANE; BRIDGE CRANE) | 36.00 | 15.10 | 51.10 |
| IRONWORKER: ORNAMENTAL | 28.90 | 15.66 | 44.56 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 35.03 | 24.00 | 59.03 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | 25.75 | 16.92 | 42.67 |
| TRUCK DRIVER: LOWBOY TRUCK | 14.24 | — | 14.24 |
| TRUCK DRIVER: DUMP TRUCK | 12.95 | 2.28 | 15.23 |
| TILE SETTER | 17.25 | 1.74 | 18.99 |
| ROOFER | 17.60 | 1.39 | 18.99 |
| PLUMBER | 20.41 | 4.20 | 24.61 |
| PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION | 22.39 | 8.89 | 31.28 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 13.22 | — | 13.22 |
| OPERATOR: ROLLER | 14.43 | 4.78 | 19.21 |
| OPERATOR: LOADER | 17.83 | — | 17.83 |
| OPERATOR: GRADER/BLADE | 18.97 | — | 18.97 |
| OPERATOR: BULLDOZER | 15.40 | 1.90 | 17.30 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 19.00 | 3.43 | 22.43 |
| LABORER: PIPELAYER | 15.00 | 0.54 | 15.54 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | 12.82 | 1.61 | 14.43 |
| IRONWORKER, STRUCTURAL | 19.80 | — | 19.80 |
| IRONWORKER, REINFORCING | 22.81 | 11.58 | 34.39 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | 18.45 | 6.59 | 25.04 |
| CEMENT MASON/CONCRETE FINISHER | 19.27 | — | 19.27 |