Building Published 05/18/2026. 32 classifications. Covers 1 county: Miami-Dade
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 39.76 | 19.02 | 58.78 |
| CARPENTER: PILEDRIVERMAN | 25.20 | 10.36 | 35.56 |
| ELEVATOR MECHANIC FOOTNOTE: A: EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OR 6% BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT; B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; PLUS THE FRIDAY AFTER THANKSGIVING; AND CHRISTMAS DAY | 55.85 | 38.44 | 94.29 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 27.00 | 14.90 | 41.90 |
| OPERATOR: CONCRETE PUMP | 32.75 | 14.90 | 47.65 |
| OPERATOR: CRANE (CRANES 76 TON TO 129 TON) | 37.57 | 14.90 | 52.47 |
| OPERATOR: CRANE (CRANES 130-300 TON) | 39.38 | 14.90 | 54.28 |
| OPERATOR: CRANE (ALL CRANES OVER 300 TON, ELECTRIC TOWER, LUFFING BOOM CRANES) | 40.40 | 14.90 | 55.30 |
| OPERATOR: CRANE (ALL CRANES 75 TONS AND BELOW) | 37.07 | 14.90 | 51.97 |
| OPERATOR: OILER | 27.53 | 14.90 | 42.43 |
| OPERATOR: MECHANIC | 37.07 | 14.90 | 51.97 |
| OPERATOR: FORKLIFT | 26.75 | 14.90 | 41.65 |
| IRONWORKER, STRUCTURAL | 28.84 | 15.72 | 44.56 |
| IRONWORKER: ORNAMENTAL | 28.90 | 15.66 | 44.56 |
| PLUMBER | 32.98 | 14.49 | 47.47 |
| PIPEFITTER (INCLUDES HVAC PIPE, UNIT AND TEMPERATURE CONTROLS INSTALLATIONS) | 43.38 | 16.70 | 60.08 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 35.03 | 24.00 | 59.03 |
| TRUCK DRIVER: LOWBOY TRUCK | 14.24 | — | 14.24 |
| TRUCK DRIVER: DUMP TRUCK | 13.22 | 2.12 | 15.34 |
| TILE SETTER | 18.01 | — | 18.01 |
| ROOFER | 19.98 | 4.77 | 24.75 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 16.00 | 3.48 | 19.48 |
| OPERATOR: ROLLER | 14.43 | 4.78 | 19.21 |
| OPERATOR: LOADER | 16.00 | 2.82 | 18.82 |
| OPERATOR: GRADER/BLADE | 18.97 | — | 18.97 |
| OPERATOR: BULLDOZER | 15.40 | 1.90 | 17.30 |
| LABORER: PIPELAYER | 13.56 | 1.34 | 14.90 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | 11.79 | 0.70 | 12.49 |
| IRONWORKER, REINFORCING | 17.72 | — | 17.72 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | 29.60 | 9.38 | 38.98 |
| CEMENT MASON/CONCRETE FINISHER | 13.06 | 0.70 | 13.76 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION | 18.04 | 3.24 | 21.28 |