Building Published 05/18/2026. 30 classifications. Covers 1 county: Hernando
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 30.12 | 13.11 | 43.23 |
| ELEVATOR MECHANIC FOOTNOTE: A. EMPLOYER CONTRIBUTIONS 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS LESS THAN 5 YEARS. B.PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY, THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | 51.83 | 38.44 | 90.27 |
| POWER EQUIPMENT OPERATOR: GROUP 4 FORKLIFT JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | 35.01 | 16.85 | 51.86 |
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE; MECHANICS JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | 37.01 | 16.85 | 53.86 |
| POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES | 38.01 | 16.85 | 54.86 |
| POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | 39.01 | 16.85 | 55.86 |
| IRONWORKER, STRUCTURAL | 35.25 | 17.32 | 52.57 |
| IRONWORKER, REINFORCING | 35.25 | 17.32 | 52.57 |
| IRONWORKER: ORNAMENTAL | 28.90 | 15.66 | 44.56 |
| PIPEFITTER (INCLUDES HVAC PIPE AND UNIT INSTALLATION) | 35.30 | 18.24 | 53.54 |
| PLUMBER | 35.30 | 18.24 | 53.54 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | 25.75 | 16.92 | 42.67 |
| TRUCK DRIVER: LOWBOY TRUCK | 14.24 | — | 14.24 |
| TRUCK DRIVER: DUMP TRUCK | 13.22 | 2.12 | 15.34 |
| TILE SETTER | 18.01 | — | 18.01 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 20.63 | 8.38 | 29.01 |
| ROOFER | 19.00 | 1.17 | 20.17 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 14.72 | 2.13 | 16.85 |
| OPERATOR: ROLLER | 14.43 | 4.78 | 19.21 |
| OPERATOR: LOADER | 14.00 | 1.40 | 15.40 |
| OPERATOR: GRADER/BLADE | 18.97 | — | 18.97 |
| OPERATOR: BULLDOZER | 15.40 | 1.90 | 17.30 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 22.07 | 8.80 | 30.87 |
| LABORER: COMMON OR GENERAL, INCLUDES CARPENTER TENDING AND CEMENT MASON TENDING | 11.83 | 1.59 | 13.42 |
| LABORER: PIPELAYER | 14.00 | 1.40 | 15.40 |
| HVAC MECHANIC (HVAC DUCT INSTALLATION ONLY) | 17.95 | 1.52 | 19.47 |
| FLOOR LAYER: CARPET AND VINYL | 17.64 | — | 17.64 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | 22.46 | 7.52 | 29.98 |
| CEMENT MASON/CONCRETE FINISHER | 14.72 | 1.46 | 16.18 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (EXCLUDES CARPET AND VINYL FLOOR LAYING) | 16.94 | 3.16 | 20.10 |