Building Published 05/18/2026. 28 classifications. Covers 1 county: Alachua
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 28.00 | 12.30 | 40.30 |
| ELEVATOR MECHANIC FOOTNOTE: A. EMPLOYER CONTRIBUTIONS 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS LESS THAN 5 YEARS. B.PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY, THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | 51.11 | 38.44 | 89.55 |
| OPERATOR: OILER | 23.50 | 9.20 | 32.70 |
| OPERATOR: MECHANIC | 32.05 | 9.20 | 41.25 |
| OPERATOR: FORKLIFT | 23.25 | 9.20 | 32.45 |
| OPERATOR: CRANE (ALL CRANES OVER 15 TON CAPACITY) | 32.05 | 9.20 | 41.25 |
| OPERATOR: CRANE (ALL CRANES 160 TON CAPACITY AND OVER) | 33.05 | 9.20 | 42.25 |
| IRONWORKER: ORNAMENTAL | 28.90 | 15.66 | 44.56 |
| IRONWORKER, STRUCTURAL | 29.50 | 12.98 | 42.48 |
| PLUMBER | 37.50 | 17.59 | 55.09 |
| PIPEFITTER (INCLUDES HVAC PIPE AND UNIT INSTALLATION) | 37.50 | 17.59 | 55.09 |
| TRUCK DRIVER: LOWBOY TRUCK | 14.24 | — | 14.24 |
| TRUCK DRIVER: DUMP TRUCK | 13.22 | 2.12 | 15.34 |
| TILE SETTER | 18.01 | — | 18.01 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 17.87 | 5.00 | 22.87 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 20.09 0.30 ROOFER | 16.99 | — | 16.99 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 15.62 | 2.05 | 17.67 |
| OPERATOR: ROLLER | 14.43 | 4.78 | 19.21 |
| OPERATOR: LOADER | 14.83 | 1.84 | 16.67 |
| OPERATOR: GRADER/BLADE | 18.97 | — | 18.97 |
| OPERATOR: BULLDOZER | 15.40 | 1.90 | 17.30 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 14.44 | 1.40 | 15.84 |
| LABORER: PIPELAYER | 12.49 | 1.07 | 13.56 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | 11.38 | 0.63 | 12.01 |
| IRONWORKER, REINFORCING | 22.81 | 11.58 | 34.39 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | 17.35 | 1.98 | 19.33 |
| CEMENT MASON/CONCRETE FINISHER | 14.47 | 1.74 | 16.21 |
| CARPENTER, INCLUDES FORM WORK | 15.08 | — | 15.08 |