Residential Published 05/18/2026. 44 classifications. Covers 1 county: Miami-Dade
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | 40.24 | 14.94 | 55.18 |
| OPERATOR: CRANE (CRANES 76 TON TO 129 TON) | 37.57 | 14.90 | 52.47 |
| OPERATOR: CRANE (CRANES 130-300 TON) | 39.38 | 14.90 | 54.28 |
| OPERATOR: CRANE (ALL CRANES OVER 300 TON, ELECTRIC TOWER, LUFFING BOOM CRANES) | 40.40 | 14.90 | 55.30 |
| OPERATOR: CRANE (ALL CRANES 75 TONS AND BELOW) | 37.07 | 14.90 | 51.97 |
| OPERATOR: OILER | 27.53 | 14.90 | 42.43 |
| OPERATOR: BACKHOE | 27.00 | 14.90 | 41.90 |
| IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL | 28.84 | 15.72 | 44.56 |
| PAINTER, INCLUDES BRUSH, ROLLER AND SPRAY (EXCLUDES DRYWALL FINISHING/TAPING) | 23.84 | 14.75 | 38.59 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 35.03 | 24.00 | 59.03 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION (EXCLUDES METAL ROOF INSTALLATION) | 29.10 | 14.68 | 43.78 |
| TRUCK DRIVER: LOWBOY TRUCK | 12.10 | — | 12.10 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | 10.22 | — | 10.22 |
| TILE SETTER | 16.00 | — | 16.00 |
| ROOFER: METAL ROOF | 16.99 | — | 16.99 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS) | 14.50 | — | 14.50 |
| PLUMBER | 25.00 | 1.17 | 26.17 |
| OPERATOR: TRACTOR | 10.20 | — | 10.20 |
| OPERATOR: TRACKHOE | 15.68 | — | 15.68 |
| OPERATOR: SCREED | 10.93 | — | 10.93 |
| OPERATOR: ROLLER | 10.62 | — | 10.62 |
| OPERATOR: LOADER | 16.48 | — | 16.48 |
| OPERATOR: GRADER/BLADE | 15.50 | — | 15.50 |
| OPERATOR: FORKLIFT | 17.50 | — | 17.50 |
| OPERATOR: EXCAVATOR | 13.50 | — | 13.50 |
| OPERATOR: DISTRIBUTOR | 11.41 | — | 11.41 |
| OPERATOR: BULLDOZER | 13.67 | — | 13.67 |
| OPERATOR: BACKHOE LOADER COMBO | 17.04 | — | 17.04 |
| OPERATOR: ASPHALT PAVER | 11.63 | — | 11.63 |
| LABORER: LANDSCAPE AND IRRIGATION | 9.15 | — | 9.15 |
| LABORER: ROOF TEAROFF | 9.00 | — | 9.00 |
| LABORER: PLASTER TENDER | 10.50 | — | 10.50 |
| LABORER: PIPELAYER | 11.79 | — | 11.79 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 10.46 | — | 10.46 |
| LABORER: MASON TENDER - BRICK | 11.51 | — | 11.51 |
| LABORER: COMMON OR GENERAL | 10.00 | — | 10.00 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | 13.75 | — | 13.75 |
| GLAZIER | 20.00 | — | 20.00 |
| FENCE ERECTOR | 17.50 | — | 17.50 |
| DRYWALL HANGER | 15.69 | — | 15.69 |
| DRYWALL FINISHER/TAPER | 19.22 | — | 19.22 |
| CEMENT MASON/CONCRETE FINISHER | 17.97 | — | 17.97 |
| CARPENTER, EXCLUDES DRYWALL HANGING | 12.51 | — | 12.51 |
| BRICKLAYER | 20.00 | — | 20.00 |