Residential Published 05/18/2026. 34 classifications. Covers 1 county: Marion
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE JOURNEYMAN OILER SHALL BE PAID 90% OF GROUP 3'S RATE | 37.01 | 16.85 | 53.86 |
| POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES | 38.01 | 16.85 | 54.86 |
| POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | 39.01 | 16.85 | 55.86 |
| PLUMBER | 37.50 | 17.59 | 55.09 |
| SHEET METAL WORKER, EXCLUDES METAL ROOF INSTALLATION | 25.75 | 16.92 | 42.67 |
| TRUCK DRIVER: LOWBOY TRUCK | 12.14 | — | 12.14 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | 10.62 | — | 10.62 |
| ROOFER: METAL ROOF | 16.99 | — | 16.99 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS) | 11.07 | — | 11.07 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 10.00 | — | 10.00 |
| OPERATOR: TRACTOR | 10.20 | — | 10.20 |
| OPERATOR: TRACKHOE | 15.68 | — | 15.68 |
| OPERATOR: SCREED | 10.93 | — | 10.93 |
| OPERATOR: ROLLER | 10.59 | — | 10.59 |
| OPERATOR: LOADER | 12.28 | — | 12.28 |
| OPERATOR: GRADER/BLADE | 15.50 | — | 15.50 |
| OPERATOR: FORKLIFT | 17.50 | — | 17.50 |
| OPERATOR: DISTRIBUTOR | 11.41 | — | 11.41 |
| OPERATOR: BULLDOZER | 12.40 | — | 12.40 |
| OPERATOR: BACKHOE/EXCAVATOR | 12.72 | — | 12.72 |
| OPERATOR: BACKHOE LOADER COMBO | 17.04 | — | 17.04 |
| OPERATOR: ASPHALT PAVER | 11.63 | — | 11.63 |
| LABORER: LANDSCAPE AND IRRIGATION | 8.06 | — | 8.06 |
| LABORER: ROOF TEAROFF | 9.00 | — | 9.00 |
| LABORER: PIPELAYER | 10.08 | — | 10.08 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 10.46 | — | 10.46 |
| LABORER: MASON TENDER - BRICK | 11.51 | — | 11.51 |
| LABORER: COMMON OR GENERAL | 8.65 | — | 8.65 |
| IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL | 9.00 | — | 9.00 |
| INSULATOR - BLOWN | 15.61 | — | 15.61 |
| ELECTRICIAN | 11.47 | — | 11.47 |
| CEMENT MASON/CONCRETE FINISHER | 10.11 | — | 10.11 |
| CARPENTER, INCLUDES BATT INSULATION | 12.86 | — | 12.86 |
| BRICKLAYER | 20.00 | — | 20.00 |