Building Published 05/18/2026. 15 classifications. Covers 1 county: Holmes
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | 33.50 | 13.85 | 47.35 |
| OPERATOR: CRANE UNDER 100 TONS CRANES WITH 350 FEET OR MORE BOOM AND/OR 400 TON CAPACITY - ADDITIONAL $1.10 PER HOUR. CRANES WITH 500 FEET BOOM AND/OR 600 TON CAPACITY - ADDITIONAL $1.45 PER HOUR | 30.25 | 14.55 | 44.80 |
| OPERATOR: CRANE 100 TONS & OVER (CONVENTIONAL & HYDRAULIC) & TOWER CRANES CRANES WITH 350 FEET OR MORE BOOM AND/OR 400 TON CAPACITY - ADDITIONAL $1.10 PER HOUR. CRANES WITH 500 FEET BOOM AND/OR 600 TON CAPACITY - ADDITIONAL $1.45 PER HOUR | 32.75 | 14.55 | 47.30 |
| IRONWORKER: STRUCTURAL AND REINFORCING | 32.00 | 18.77 | 50.77 |
| TRUCK DRIVER, INCLUDES DUMP AND 10 YARD HAUL AWAY | 8.00 | 0.15 | 8.15 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 11.72 2.19 ROOFER: BUILT UP, COMPOSITION, HOT TAR AND SINGLE PLY | 12.00 | — | 12.00 |
| PLUMBER | 10.48 | 2.06 | 12.54 |
| PLASTERER | 15.90 | — | 15.90 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 10.10 | — | 10.10 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 9.58 | — | 9.58 |
| OPERATOR: BACKHOE/EXCAVATOR | 12.43 | — | 12.43 |
| LABORER: PIPELAYER | 11.42 | 1.95 | 13.37 |
| LABORER: COMMON OR GENERAL | 8.14 | — | 8.14 |
| CEMENT MASON/CONCRETE FINISHER | 11.50 | — | 11.50 |
| CARPENTER | 13.63 | 1.14 | 14.77 |