Building Published 05/18/2026. 19 classifications. Covers 1 county: De Soto
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | 33.11 | 14.59 | 47.70 |
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE | 37.01 | 16.85 | 53.86 |
| POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES | 38.01 | 16.85 | 54.86 |
| POWER EQUIPMENT OPERATOR: GROUP 1: 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM | 39.01 | 16.85 | 55.86 |
| IRONWORKER: REINFORCING AND STRUCTURAL | 35.25 | 17.32 | 52.57 |
| PAINTER: BRUSH ONLY | 18.00 | 12.36 | 30.36 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 35.03 | 24.00 | 59.03 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 25.75 | 16.92 | 42.67 |
| TRUCK DRIVER, INCLUDES DUMP AND 10 YARD HAUL AWAY | 8.00 | 0.15 | 8.15 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 14.41 3.61 ROOFER: BUILT UP, COMPOSITION, HOT TAR AND SINGLE PLY | 14.33 | — | 14.33 |
| PLUMBER | 12.27 | 3.33 | 15.60 |
| PAINTER: ROLLER AND SPRAY | 11.21 | — | 11.21 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 9.58 | — | 9.58 |
| OPERATOR: BACKHOE/EXCAVATOR | 16.98 | — | 16.98 |
| LABORER: PIPELAYER | 10.45 | — | 10.45 |
| LABORER: COMMON OR GENERAL | 8.62 | — | 8.62 |
| FENCE ERECTOR | 9.94 | — | 9.94 |
| CEMENT MASON/CONCRETE FINISHER | 12.45 | — | 12.45 |
| CARPENTER | 15.08 | 5.07 | 20.15 |