Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

CT20260020 rev 2

Building  Published 05/18/2026. 33 classifications. Covers 1 county: Fairfield

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS)48.8133.6582.46
BRICKLAYER45.5637.9783.53
CEMENT MASON/CONCRETE FINISHER45.5637.9783.53
FLOOR LAYER: CARPET ONLY42.0329.1971.22
FLOOR LAYER: HARDWOOD FLOORS ONLY42.0329.1971.22
CARPENTER (SCAFFOLD BUILDER)42.0329.1971.22
CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION)42.0329.1971.22
SOFT FLOOR LAYER42.0329.1971.22
FLOOR LAYER: VINYL FLOORING ONLY42.0329.1971.22
MILLWRIGHT45.1430.2475.38
ELECTRICIAN (INCLUDES LOW VOLTAGE AND INSTALLATION OF ALARMS AND SOUND AND COMMUNICATION SYSTEMS)45.0036.6381.63
ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION)47.4036.7484.14
ELEVATOR MECHANIC FOOTNOTE: A.VACATION 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY66.7238.44105.16
SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY51.9229.8081.72
POWER EQUIPMENT OPERATOR, BULLDOZER: ROUGH GRADE DOZER PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY50.2229.8080.02
POWER EQUIPMENT OPERATOR, BULLDOZER: FINEGRADE (SLOPES, SHAPING, LASER OR GPS, ETC.) PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY51.9229.8081.72
POWER EQUIPMENT OPERATOR: CRANE UNDER 100 TON RATED CAPACITY) PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY56.7929.8086.59
POWER EQUIPMENT OPERATOR: LOADER - 7 CUBIC YARDS OR OVER PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY53.3329.8083.13
IRONWORKER: REINFORCING, STRUCTURAL, ORNAMENTAL45.2543.6288.87
LABORER:MASON TENDER-CEMENT/CONCRETE35.7028.8564.55
GLAZIER43.1326.7569.88
PAINTER: BRUSH AND ROLLER39.5726.7566.32
DRYWALL FINISHER/TAPER40.3226.7567.07
PLUMBER50.5835.8586.43
PIPEFITTER50.5835.8586.43
PIPEFITTER (HVAC PIPE INSTALLATION ONLY)50.5835.8586.43
ROOFER: SLATE AND TILE45.6523.5369.18
ROOFER: COMPOSITION45.1523.5368.68
SHEET METAL WORKER (METAL FLASHING AND HVAC DUCT INSTALLATION ONLY)50.6045.6196.21
SHEET METAL WORKER (INCLUDING HVAC UNIT INSTALLATION)44.7044.5089.20
SHEET METAL WORKER (METAL ROOFS INSTALLATION)44.7044.5089.20
TRUCK DRIVER: DUMP TRUCK36.3932.6869.07
LABORER: COMMON OR GENERAL33.8125.1858.99
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.