Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

CT20260003 rev 2

Highway  Published 05/18/2026. 67 classifications. Covers 1 county: Hartford

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
BRICKLAYERS, CEMENT MASONS, CEMENT FINISHERS, PLASTERERS, STONE MASONS46.0936.2982.38
CARPENTERS: DIVERS (BERLIN, BRISTOL, BURLINGTON,CANTON, MARLBOROUGH, NEW BRITAIN, NEWINGTON, PLAINVILLE, SOUTHINGTON)50.4929.1979.68
CARPENTERS: DIVER TENDERS (BERLIN, BRISTOL, BURLINGTON,CANTON, MARLBOROUGH, NEW BRITAIN, NEWINGTON, PLAINVILLE, SOUTHINGTON)42.0329.1971.22
CARPENTERS, PILEDRIVERS (BERLIN, BRISTOL, BURLINGTON,CANTON, MARLBOROUGH, NEW BRITAIN, NEWINGTON, PLAINVILLE, SOUTHINGTON)42.0329.1971.22
CARPENTERS: DIVERS (AVON, BLOOMFIED, EAST GRANBY, EAST HARTFORD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS)50.4929.1979.68
CARPENTERS: DIVER TENDERS (AVON, BLOOMFIED, EAST GRANBY, EAST HARTFORD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS)42.0329.1971.22
CARPENTERS, PILEDRIVERS (AVON, BLOOMFIED, EAST GRANBY, EAST HARTFORD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS)42.0329.1971.22
MILLWRIGHT45.1430.2475.38
ELECTRICIANS: (ENTIRE COUNTY, EXCLUDING BERLIN, BRISTOL, HARTLAND, NEW BRITAIN, NEWINGTON, PLAINVILLE AND SOUTHINGTON)48.2536.6784.92
ELECTRICIANS: (BERLIN, BRISTOL, NEW BRITAIN, NEWINGTON, PLAINVILLE, SOUTHINGTON)46.4838.0584.53
ELECTRICIANS47.4036.7484.14
POWER EQUIPMENT OPERATORS: GROUP 21 EXCAVATOR, GRADALL, MASTER MECHANIC, HOISTING ENGINEER (ALL TYPES OF EQUIPMENT WHERE A DRUM AND CABLE ARE USED TO HOIST OR DRAG MATERIAL REGARDLESS OF MOTIVE POWER OR OPERAING), RUBBER TIRE EXCAVATOR (DROTT 1085 SIMILAR), GRADER OPERATOR, BULLDOZER FINEGRADE (SLOPES SHAPING, LASER OR GPS, ECT) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY51.9229.8081.72
SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY52.9229.8082.72
POWER EQUIPMENT OPERATORS: GROUP 19 FRONT END LOADER(7 CUBIC YARDS OR OVER); WORK BOAT 26 FT. AND OVER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY53.3329.8083.13
POWER EQUIPMENT OPERATORS: GROUP 18 MAINTENANCE ENGINEER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY42.2029.8072.00
POWER EQUIPMENT OPERATORS: GROUP 17 GENERATOR OPERATOR; COMPRESSOR OPERATOR; PUMP OPERATOR; WELDING MACHINE OPERATOR; HEATER OPERATOR. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY43.0629.8072.86
POWER EQUIPMENT OPERATORS: GROUP 16 ELEVATOR OPERATOR; TOW MOTOR OPERATOR (SOLID TIRE NO ROUGH TERRAIN). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY43.6029.8073.40
POWER EQUIPMENT OPERATORS: GROUP 15 POWER SAFETY BOAT; VACUUM TRUCK; ZIM MIXER; SWEEPER; (MINIMUM FOR ANY JOB REQUIRING A CDL LICENSE) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY44.7029.8074.50
SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY45.1229.8074.92
THE HOLIDAY47.9129.8077.71
POWER EQUIPMENT OPERATORS: GROUP 12 WELLPOINT OPERATOR. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY45.8729.8075.67
SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY45.9629.8075.76
POWER EQUIPMENT OPERATORS: GROUP 10 VIBRATORY HAMMER, ICE MACHINE, DIESEL AND AIR HAMMER, ETC A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY45.9629.8075.76
POWER EQUIPMENT OPERATORS: GROUP 9 FRONT END LOADER (UNDER 3 CUBIC YARDS); SKID STEER LOADER (REGARDLESS OF ATTACHMENTS); (BOBCAT OR SIMILAR); FORK LIFT; POWER CHIPPER; LANDSCAPE EQUIPMENT (INCLUDING HYDROSEEDER).VACUUM EXCAVATION TRUCK AND HYDROVAC EXCAVATION TRUCK (27 HG PRESSURE OR GREATER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY48.6729.8078.47
SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY49.2529.8079.05
POWER EQUIPMENT OPERATORS: GROUP 7 ASPHALT ROLLER; CONCRETE SAWS AND CUTTERS (RIDE ON TYPES); VERMEER CONCRETE CUTTER; STUMP GRINDER; SCRAPER; SNOOPER; SKIDDER; MILLING MACHINE (24"" AND UNDER MANDREL) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY49.2529.8079.05
SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY50.2229.8080.02
POWER EQUIPMENT OPERATORS: GROUP 5 SPECIALTY RAILROAD EQUIPMENT; ASPHALT SPREADER; ASPHALT RECLAIMING ACHINE; LINE GRINDER; CONCRETE PUMPS; DRILLS WITH SELF CONTAINED POWER UNITS; BORING MACHINE; POST HOLE DIGGER; AUGER; POUNDER; WELL DIGGER; MILLING MACHINE (OVER 24"" MANDRELL); SIDE BOOM; COMBINATION HOE AND LOADER; DIRECTIONAL DRILLER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY50.6329.8080.43
POWER EQUIPMENT OPERATORS: GROUP 4 TRENCHING MACHINES; LIGHTER DERRICK; CONCRETE FINISHING MACHINE, CMI MACHINE OR SIMILAR; KOEHRING LOADER SKOOPER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY51.9229.8081.72
SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY56.7929.8086.59
POWER EQUIPMENT OPERATORS: GROUP 2 CRANES (100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH 150 FT. BOOM (INCLUDING JIB): $1.50 EXTRA. CRANE WITH 200 FT BOOM (INCLUDING JIB): $2.50 EXTRA. CRANE WITH 250 FT. BOOM (INCLUDING JIB): $5.00 EXTRA. CRANE WITH 300 FT. BOOM (INCLUDING JIB): $7.00 EXTRA. CRANE WITH 400 FT. BOOM (INCLUDING JIB); $10.00 EXTRA 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY57.7829.8087.58
POWER EQUIPMENT OPERATORS: GROUP 1 CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR TONE; HOISTING ENGINEER (2 DRUMS OR OVER). HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE CRANE WITH 150 FT. BOOM (INCLUDING JIB): $1.50 EXTRA. CRANE WITH 200 FT. BOOM (INCLUDING JIB) $2.50 EXTRA. CRANE WITH 250 FT. BOOM (INCLUDING JIB): $5.00 EXTRA. CRANE WITH 300 FT. BOOM (INCLUDING JIB): $7.00 EXTRA. CRANE WITH 400 FT BOOM (INCLUDING JIB); $10.00 EXTRA. 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY58.1929.8087.99
IRONWORKERS: REINFORCING, STRUCTURAL AND PRECAST CONCRETE ERECTION. PAID HOLIDAY: LABOR DAY PROVIDED EMPLOYEE HAS BEEN ON THE PAYROLL FOR THE 5 CONSECUTIVE WORK DAYS PRIOR TO LABOR DAY45.2543.6288.87
LABORERS: GROUP 9: TOXIC WASTE REMOVERS A OR B WITH PPE (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO EMPLOYEES REQUIRED TO WEAR OSHA LEVAL A OR B EVEN IF THE PPE IS NOT WORN.)38.7028.8567.55
LABORERS: GROUP 8: ACETYLENE BURNER (HOURS WORKED WITH A TORCH)36.7028.8565.55
LABORERS: GROUP 7 TRAFFIC CONTROL SIGNALMAN21.4228.8550.27
LABORERS: GROUP 6 TOXIC WASTE REMOVER37.7028.8566.55
LABORERS: GROUP 5 BLASTERS37.4528.8566.30
LABORERS: GROUP 4 ASBESTOS/LEAD REMOVAL38.7028.8567.55
LABORERS: GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER36.2028.8565.05
LABORERS: GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN35.9528.8564.80
LABORERS: GROUP 1 LABORERS (UNSKILLED), CONCRETE SPECIALIST35.7028.8564.55
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: MUCKING MACHINE OPERATOR A. PAID HOLIDAYS: ON TUNNEL WORK ONLY NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY45.0128.8573.86
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: CHANGE HOUSE ATTENDANTS, POWDER WATCHMEN, TOP ON IRON BOLT A PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY42.2428.8571.09
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BRAKEMEN, TRACKMEN, GROUTMAN, LABORERS, OUTSIDE LOCK TENDER, GAUGE TENDERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY44.2228.8573.07
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BLASTER A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY44.4228.8573.27
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: MINERS, MOTORMEN, MUCKING MACHINE OPERATORS, NOZZLEMEN, GROUT MEN, SHAFT AND TUNNEL, STEEL AND RODMEN, SHIELD AND ERECTOR, ARM OPERATOR, CABLE TENDERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY37.9328.8566.78
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: BRAKEMEN AND TRACKMEN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY36.9628.8565.81
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR MINERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY37.9328.8566.78
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR LABORERS TOPSIDE, CAGE TENDERS, BELLMAN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY36.8528.8565.70
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR BRAKEMEN, TRACKMEN, TUNNEL LABORERS, SHAFT LABORERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY36.9628.8565.81
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: FORM ERECTORS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY37.2928.8566.14
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: CONCRETE WORKERS, FORM MOVERS AND STRIPPERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY36.9628.8565.81
PAINTERS: BRUSH, ROLLER, BLASTING (SAND, WATER, ETC.) SPRAY (BRIDGE CONSTRUCTION)59.7026.9086.60
PAINTERS: TANKS, TOWERS, SWING41.5726.7568.32
PAINTERS: BRUSH AND ROLL39.5726.7566.32
PAINTERS: BLAST AND SPRAY42.5726.7569.32
TRUCK DRIVERS: SPECIALIZED (EARTH MOVING EQUIPMENT OTHER THAN CONVENTIONAL TYPE ON-THE-ROAD TRUCKS AND SEMI-TRAILERS, INCLUDING EUCLIDS) HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED36.4432.6869.12
TRUCK DRIVERS: SNORKLE TRUCK HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED36.5432.6869.22
TRUCK DRIVERS: HEAVY DUTY TRAILER UP TO 40 TONS HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED37.3932.6870.07
TRUCK DRIVERS: HEAVY DUTY TRAILER 40 TONS AND OVER HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED38.6632.6871.34
TRUCK DRIVERS: 4 AXLE READY MIX HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED37.1932.6869.87
TRUCK DRIVERS: 4 AXLE HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED36.3932.6869.07
TRUCK DRIVERS: 3 AXLE READY MIX HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED36.3332.6869.01
TRUCK DRIVERS: 3 AXLE HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED36.2732.6868.95
TRUCK DRIVERS: 2 AXLE READY MIX HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED36.2732.6868.95
TRUCK DRIVERS: 2 AXLE HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED36.1632.6868.84
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.