Building Published 05/18/2026. 30 classifications. Covers 1 county: Adams
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION AND DRYWALL HANGING; EXCLUDES METAL STUD INSTALLATION) | 35.09 | 13.84 | 48.93 |
| MILLWRIGHT | 42.10 | 19.02 | 61.12 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | 46.80 | 19.53 | 66.33 |
| ELEVATOR MECHANIC FOOTNOTE: A.VACATION 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | 56.57 | 38.44 | 95.01 |
| POWER EQUIPMENT OPERATOR: CRANE (91 TO 140 TONS) | 37.34 | 15.20 | 52.54 |
| POWER EQUIPMENT OPERATOR: CRANE (51 TO 90 TONS) | 36.09 | 15.20 | 51.29 |
| IRONWORKER: ORNAMENTAL | 39.21 | 12.50 | 51.71 |
| IRONWORKER, STRUCTURAL | 39.21 | 12.50 | 51.71 |
| PAINTER: BRUSH, ROLLER AND SPRAY (EXCLUDES DRYWALL FINISHING/TAPING) | 27.41 | 11.56 | 38.97 |
| SOFT FLOOR LAYER (VINYL AND CARPET) | 18.25 | 14.33 | 32.58 |
| GLAZIER | 37.26 | 13.15 | 50.41 |
| PLUMBER (EXCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION) | 47.23 | 21.68 | 68.91 |
| PIPEFITTER (INCLUDES HVAC PIPE AND UNIT INSTALLATION; EXCLUDES HVAC DUCT INSTALLATION) | 45.40 | 22.11 | 67.51 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 48.60 | 27.57 | 76.17 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION; EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | 43.05 | 22.65 | 65.70 |
| WATERPROOFER | 16.94 | — | 16.94 |
| TRUCK DRIVER: DUMP TRUCK | 17.34 | — | 17.34 |
| ROOFER | 16.96 | — | 16.96 |
| OPERATOR: GRADER/BLADE | 21.50 | — | 21.50 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 19.10 | 3.89 | 22.99 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 20.78 | 5.78 | 26.56 |
| LABORER: PIPELAYER | 16.96 | 3.68 | 20.64 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 16.00 | — | 16.00 |
| LABORER: MASON TENDER - BRICK | 15.99 | — | 15.99 |
| LABORER: COMMON OR GENERAL | 14.93 | 4.24 | 19.17 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 21.49 | 5.20 | 26.69 |
| DRYWALL FINISHER/TAPER | 18.77 | 6.37 | 25.14 |
| CEMENT MASON/CONCRETE FINISHER | 20.33 | 6.76 | 27.09 |
| CARPENTER (METAL STUD INSTALLATION ONLY) | 17.68 | — | 17.68 |
| BRICKLAYER | 21.96 | — | 21.96 |