Highway Published 05/18/2026. 53 classifications. Covers 1 county: Boulder
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (6)-CRANE (91-140 TONS) | 37.34 | 15.20 | 52.54 |
| POWER EQUIPMENT OPERATOR: (5)-DRILL RIG CAISSON (WATSON 2500 SIMILAR OR LARGER), CRANE (51-90 TONS), SCRAPER (40 CU.YD AND OVER),) | 35.41 | 15.20 | 50.61 |
| POWER EQUIPMENT OPERATOR: (4)-SCRAPER (SINGLE BOWL, UNDER 40 CU. YD), CRANE (50 TONS AND UNDER) | 35.20 | 15.20 | 50.40 |
| POWER EQUIPMENT OPERATOR: (3)- DRILL RIG CAISSON (SMALLER THAN WATSON 2500 AND SIMILAR) | 35.03 | 15.20 | 50.23 |
| TRUCK DRIVER: WATER TRUCK | 20.64 | 5.27 | 25.91 |
| TRUCK DRIVER: TRUCK MOUNTED ATTENUATOR | 12.43 | 3.22 | 15.65 |
| TRUCK DRIVER: SEMI/TRAILER TRUCK | 18.39 | 4.13 | 22.52 |
| TRUCK DRIVER: PICKUP AND PILOT CAR | 13.93 | 3.68 | 17.61 |
| TRUCK DRIVER: MULTI-PURPOSE SPECIALTY & HOISTING TRUCK | 16.41 | 4.97 | 21.38 |
| TRUCK DRIVER: LOWBOY TRUCK | 17.25 | 5.27 | 22.52 |
| TRUCK DRIVER: DUMP TRUCK | 16.41 | 5.27 | 21.68 |
| TRUCK DRIVER: DISTRIBUTOR | 21.69 | 5.27 | 26.96 |
| TRAFFIC SIGNALIZATION: GROUNDSMAN | 18.52 | 3.59 | 22.11 |
| POWER EQUIPMENT OPERATOR: TRACTOR | 13.13 | 2.95 | 16.08 |
| POWER EQUIPMENT OPERATOR: SCREED | 22.67 | 8.72 | 31.39 |
| POWER EQUIPMENT OPERATOR: ROTOMILL | 16.22 | 4.41 | 20.63 |
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) | 22.32 | 8.72 | 31.04 |
| POWER EQUIPMENT OPERATOR: OILER | 22.77 | 9.22 | 31.99 |
| POWER EQUIPMENT OPERATOR: MECHANIC | 22.97 | 8.72 | 31.69 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) | 22.67 | 8.72 | 31.39 |
| POWER EQUIPMENT OPERATOR: GUARDRAIL/POST DRIVER | 16.54 | 4.10 | 20.64 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | 22.67 | 8.72 | 31.39 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | 15.91 | 4.27 | 20.18 |
| POWER EQUIPMENT OPERATOR: DRILL | 21.42 | 2.88 | 24.30 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | 26.90 | 5.59 | 32.49 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER | 22.83 | 8.72 | 31.55 |
| POWER EQUIPMENT OPERATOR: BOOM | 22.67 | 8.72 | 31.39 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | 15.37 | 4.28 | 19.65 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE | 21.70 | 5.51 | 27.21 |
| POWER EQUIPMENT OPERATOR: ASPHALT SPREADER | 22.67 | 8.72 | 31.39 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER | 23.01 | 9.22 | 32.23 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVER | 24.19 | 6.58 | 30.77 |
| POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN | 22.67 | 8.25 | 30.92 |
| PAINTER (SPRAY ONLY) | 16.99 | 2.87 | 19.86 |
| LABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALLS SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS) | 12.43 | 3.22 | 15.65 |
| LABORER: TRAFFIC CONTROL (FLAGGER) | 9.55 | 3.05 | 12.60 |
| LABORER: PIPELAYER | 16.74 | 1.89 | 18.63 |
| LABORER: MASON TENDER- CEMENT/CONCRETE | 16.29 | 4.25 | 20.54 |
| LABORER: LANDSCAPE AND IRRIGATION | 12.26 | 3.16 | 15.42 |
| LABORER: CONCRETE SAW (HAND HELD) | 16.29 | 6.14 | 22.43 |
| LABORER: COMMON OR GENERAL | 16.29 | 4.25 | 20.54 |
| LABORER: ASPHALT SPREADER | 18.58 | 4.65 | 23.23 |
| LABORER: ASPHALT SHOVELER | 21.21 | 4.25 | 25.46 |
| LABORER: ASPHALT RAKER | 16.29 | 4.25 | 20.54 |
| IRONWORKER: STRUCTURAL (EXCLUDES GUARDRAIL INSTALLATION) | 18.22 | 6.01 | 24.23 |
| IRONWORKER: REINFORCING (EXCLUDES GUARDRAIL INSTALLATION) | 16.69 | 5.45 | 22.14 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | 12.62 | 3.21 | 15.83 |
| GUARDRAIL INSTALLER | 16.21 | 3.63 | 19.84 |
| FENCE ERECTOR | 15.96 | 3.46 | 19.42 |
| ELECTRICIAN | 33.39 | 7.64 | 41.03 |
| CEMENT MASON/CONCRETE FINISHER | 17.39 | 3.00 | 20.39 |
| CARPENTER (FORM WORK ONLY) | 17.06 | 3.90 | 20.96 |
| CARPENTER (EXCLUDES FORM WORK) | 16.61 | 3.88 | 20.49 |