Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

AZ20260052 rev 1

Heavy  Published 05/18/2026. 18 classifications. Covers 1 county: La Paz

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
ELECTRICIAN33.0013.0446.04
ELECTRICIAN: LINEPERSON62.0822.4984.57
ELECTRICIAN: GROUNDPERSON36.0016.8852.88
ELECTRICIAN: LINE EQUIPMENT OPERATOR46.5619.1565.71
POWER EQUIPMENT OPERATOR: CRANE/DERRICK36.6418.1254.76
POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER35.5618.1253.68
TRUCK DRIVER: HYDROVAC32.2918.1250.41
LABORER: JACKHAMMER29.059.2638.31
LABORER: PIPELAYER29.919.2639.17
POWER EQUIPMENT OPERATOR: FORKLIFT30.889.2640.14
LABORER: MASON TENDER27.419.2636.67
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR29.059.2638.31
TRUCK DRIVER: CONCRETE30.889.2640.14
TRUCK DRIVER: DUMP30.889.2640.14
TRUCK DRIVER: WATER30.889.2640.14
CARPENTER: FORMWORK CONCRETE31.989.2641.24
POWER EQUIPMENT OPERATOR: BACKHOE/BACKHOE & LOADER COMBO/TRACK BACKHOE27.38—27.38
LABORER: GENERAL23.89—23.89
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.