Residential Published 05/18/2026. 30 classifications. Covers 1 county: Pinal
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER ZONE PAY: (RADIUS MILES FROM THE INTERSECTION OF CENTRAL AVE. AND WASHINGTON ST., PHOENIX, AZ) ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER HOUR ZONE D: 101-200 MILES- BASE RATE PLUS $3.50 PER HOUR ZONE E: OVER 200 MILES- BASE RATE PLUS $6.50 PER HOUR | 32.29 | 9.97 | 42.26 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | 34.49 | 12.57 | 47.06 |
| IRONWORKER, STRUCTURAL | 33.00 | 19.91 | 52.91 |
| CEMENT MASON/CONCRETE FINISHER | 28.78 | 9.17 | 37.95 |
| TRUCK DRIVER: WATER TRUCK | 14.50 | — | 14.50 |
| TRUCK DRIVER: DUMP TRUCK | 17.02 | — | 17.02 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 17.73 | — | 17.73 |
| ROOFER | 13.67 | — | 13.67 |
| PLUMBER | 20.14 | 4.08 | 24.22 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | 12.89 | — | 12.89 |
| OPERATOR: TRACTOR | 22.63 | — | 22.63 |
| OPERATOR: SCRAPER | 19.20 | 1.52 | 20.72 |
| OPERATOR: ROLLER | 16.24 | 1.42 | 17.66 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 20.75 | — | 20.75 |
| OPERATOR: LOADER (FRONT END) | 15.00 | — | 15.00 |
| OPERATOR: FORKLIFT | 16.17 | — | 16.17 |
| OPERATOR: EXCAVATOR | 24.67 | — | 24.67 |
| OPERATOR: BACKHOE | 18.29 | — | 18.29 |
| LABORER: PIPELAYER | 13.00 | — | 13.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE/STONE | 11.00 | — | 11.00 |
| LABORER: MASON TENDER - BRICK | 12.77 | — | 12.77 |
| LABORER: GRADE CHECKER | 16.83 | 0.45 | 17.28 |
| LABORER: COMMON OR GENERAL | 10.18 | — | 10.18 |
| HVAC MECHANIC (INSTALLATION OF HVAC DUCT) | 14.13 | — | 14.13 |
| GLAZIER | 13.45 | — | 13.45 |
| FORM WORKER | 14.37 | — | 14.37 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS | 15.45 | 0.01 | 15.46 |
| DRYWALL HANGER | 15.00 | 0.58 | 15.58 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | 18.16 | — | 18.16 |
| ALARM INSTALLER, INCLUDES WIRING AND INSTALLATION | 13.91 | — | 13.91 |