Highway Published 05/18/2026. 37 classifications. Covers 1 county: Crittenden
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: SEMI/TRAILER TRUCK | 12.50 | — | 12.50 |
| TRUCK DRIVER: WATER TRUCK | 16.00 | — | 16.00 |
| TRUCK DRIVER: LOWBOY TRUCK | 17.67 | — | 17.67 |
| TRUCK DRIVER: FLATBED TRUCK | 21.03 | — | 21.03 |
| TRUCK DRIVER: DUMP TRUCK | 12.00 | — | 12.00 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 10.52 | — | 10.52 |
| TRAFFIC CONTROL: FLAGGER | 10.87 | — | 10.87 |
| OPERATOR: SCREED | 16.54 | — | 16.54 |
| OPERATOR: SCRAPER | 19.31 | — | 19.31 |
| OPERATOR: ROLLER | 12.50 | — | 12.50 |
| OPERATOR: POST DRIVER (GUARDRAIL/FENCES) | 16.97 | — | 16.97 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 15.62 | — | 15.62 |
| OPERATOR: OILER | 19.29 | — | 19.29 |
| OPERATOR: MILLING MACHINE | 17.52 | — | 17.52 |
| OPERATOR: MECHANIC | 19.88 | — | 19.88 |
| OPERATOR: LOADER | 16.85 | — | 16.85 |
| OPERATOR: HYDROSEEDER | 10.79 | — | 10.79 |
| OPERATOR: GRADER/BLADE | 15.00 | — | 15.00 |
| OPERATOR: DRILL | 14.85 | — | 14.85 |
| OPERATOR: CRANE | 22.84 | — | 22.84 |
| OPERATOR: BULLDOZER | 17.08 | — | 17.08 |
| OPERATOR: BROOM/SWEEPER | 12.00 | — | 12.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 16.06 | — | 16.06 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 17.08 | — | 17.08 |
| OPERATOR: ASPHALT SPREADER | 15.80 | — | 15.80 |
| LABORER: PIPELAYER | 14.56 | — | 14.56 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 12.38 | — | 12.38 |
| LABORER: LANDSCAPE | 12.65 | — | 12.65 |
| LABORER: COMMON OR GENERAL | 11.04 | — | 11.04 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 14.68 | — | 14.68 |
| IRONWORKER, STRUCTURAL | 22.00 | — | 22.00 |
| IRONWORKER, REINFORCING | 14.22 | — | 14.22 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | 21.75 | — | 21.75 |
| HIGHWAY/PARKING LOT STRIPING: OPERATOR (STRIPING MACHINE) | 13.74 | — | 13.74 |
| ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION | 20.40 | — | 20.40 |
| CEMENT MASON/CONCRETE FINISHER | 15.49 | — | 15.49 |
| CARPENTER, INCLUDES FORM WORK | 20.06 | — | 20.06 |