Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | 75.37 | 18.82 | 94.19 |
| TILE SETTER | 49.70 | 18.62 | 68.32 |
| TILE FINISHER | 40.98 | 18.17 | 59.15 |
| BRICKLAYER | 55.34 | 20.05 | 75.39 |
| TERRAZZO WORKER/SETTER | 51.70 | 18.62 | 70.32 |
| TERRAZZO FINISHER | 40.98 | 18.17 | 59.15 |
| MASON - STONE | 55.34 | 20.05 | 75.39 |
| MARBLE SETTER | 49.70 | 18.62 | 68.32 |
| MARBLE FINISHER | 40.98 | 18.17 | 59.15 |
| MILLWRIGHT | 55.39 | 22.38 | 77.77 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING MECHANIC, DRYWALL HANGER & FORM WORK) | 63.98 | 19.13 | 83.11 |
| ELECTRICIAN | 55.01 | 29.20 | 84.21 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 61.93 | 27.57 | 89.50 |
| OPERATOR: GRADER/BLADE | 61.93 | 27.57 | 89.50 |
| OPERATOR: BULLDOZER (D9 & UNDER) | 60.46 | 27.57 | 88.03 |
| OPERATOR: BLADE FINISH | 61.14 | 27.57 | 88.71 |
| OPERATOR: SCREED | 61.14 | 27.57 | 88.71 |
| OPERATOR: ROLLER (PLANT MIX OR MULTI-LIFT MATERIALS) | 60.46 | 27.57 | 88.03 |
| OPERATOR: ROLLER (OTHER THAN PLANT MIX) | 56.63 | 27.57 | 84.20 |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | 60.46 | 27.57 | 88.03 |
| OPERATOR: OILER (DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT; TRUCK CRANE OILER/DRIVER: UNDER 100 TONS) | 61.14 | 27.57 | 88.71 |
| OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS) | 61.14 | 27.57 | 88.71 |
| OPERATOR: LOADER (OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS) | 61.93 | 27.57 | 89.50 |
| OPERATOR: CONCRETE PUMP (TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M) | 61.93 | 27.57 | 89.50 |
| IRONWORKER | 57.94 | 34.52 | 92.46 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | 50.38 | 16.96 | 67.34 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 52.31 | 17.01 | 69.32 |
| LABORER: FORM STRIPPING | 50.38 | 16.96 | 67.34 |
| LABORER: GRADE CHECKER | 52.31 | 17.01 | 69.32 |
| LABORER: JACKHAMMER | 51.52 | 16.99 | 68.51 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 50.38 | 16.96 | 67.34 |
| LABORER: NOZZLE PERSON | 52.31 | 17.01 | 69.32 |
| SCAFFOLD BUILDER | 50.38 | 16.96 | 67.34 |
| TRAFFIC CONTROL: FLAGGER | 40.88 | 16.72 | 57.60 |
| LABORER, MASON TENDER BRICK | 50.38 | 16.96 | 67.34 |
| LABORER: CONCRETE SAW CHAIN | 51.52 | 16.99 | 68.51 |
| LABORER: FIRE WATCH | 40.56 | 15.60 | 56.16 |
| GLAZIER | 61.14 | 23.76 | 84.90 |
| PAINTER | 41.24 | 14.70 | 55.94 |
| DRYWALL FINISHER/TAPER | 53.59 | 23.65 | 77.24 |
| FLOOR LAYER: SOFT FLOORS | 42.01 | 20.20 | 62.21 |
| CEMENT MASON/CONCRETE FINISHER | 54.16 | 21.27 | 75.43 |
| PLASTERER | 52.50 | 20.67 | 73.17 |
| PIPEFITTER | 60.72 | 34.15 | 94.87 |
| PLUMBER | 75.21 | 33.88 | 109.09 |
| ROOFER | 48.01 | 16.44 | 64.45 |
| SPRINKLER FITTER | 68.89 | 33.80 | 102.69 |
| SHEET METAL WORKER | 69.86 | 33.39 | 103.25 |
| TRUCK DRIVER: DUMP TRUCK | 35.46 | 13.00 | 48.46 |
| OPERATOR: MECHANIC | 42.85 | 19.20 | 62.05 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 40.53 | 9.56 | 50.09 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 45.65 | — | 45.65 |
| LABORER: PIPELAYER | 35.83 | 10.89 | 46.72 |
| LABORER: LANDSCAPE | 18.22 | 5.60 | 23.82 |
| LABORER: COMMON OR GENERAL | 36.71 | 9.91 | 46.62 |
| TRUCK DRIVER: CONCRETE TRUCK | 55.43 | 27.52 | 82.95 |
| TRUCK DRIVER: PICKUP TRUCK | 51.78 | 27.52 | 79.30 |
| OPERATOR: DRILL | 56.42 | 21.15 | 77.57 |
| LABORER: HOD CARRIER | 47.95 | 14.40 | 62.35 |
| OPERATOR: CRANE | 56.10 | 25.57 | 81.67 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | 55.34 | 20.05 | 75.39 |
| BRICK POINTER/CAULKER/CLEANER | 55.34 | 20.05 | 75.39 |
| ELEVATOR MECHANIC. FOOTNOTE: A. PAID VACATION EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | 67.61 | 38.44 | 106.05 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 38.05 | 16.75 | 54.80 |
| LABORER: MASON TENDER - BRICK | 50.38 | 16.96 | 67.34 |
| GLAZIER | 40.28 | 16.06 | 56.34 |
| CEMENT MASON/CONCRETE FINISHER | 54.16 | 21.27 | 75.43 |
| SPRINKLER FITTER | 46.18 | 26.40 | 72.58 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | 52.40 | 32.72 | 85.12 |
| ROOFER | 23.12 | 2.90 | 26.02 |
| PLUMBER | 30.53 | 7.84 | 38.37 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY | 34.36 | 14.34 | 48.70 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | 23.24 | 7.20 | 30.44 |
| OPERATOR: CONCRETE PUMP | 33.57 | 15.15 | 48.72 |
| OPERATOR: BULLDOZER | 29.63 | — | 29.63 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 17.53 | — | 17.53 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 32.74 | 15.15 | 47.89 |
| LABORER: COMMON OR GENERAL | 19.07 | 3.27 | 22.34 |
| ELECTRICIAN | 33.54 | 11.71 | 45.25 |
| DRYWALL HANGER AND METAL STUD INSTALLER | 24.59 | — | 24.59 |
| CARPENTER | 24.45 | 4.71 | 29.16 |
| WORKING IN AS FOLLOWS: LEVEL C-D: - $.50 PER HOUR - THIS LEVEL MAY USE AN AIR PURIFYING RESPIRATOR OR ADDITIONAL PROTECTIVE CLOTHING LEVEL A-B: - $1.00 PER HOUR - USES SUPPLIED AIR IN CONJUNCTION WITH A CHEMICAL SPLASH SUIT OR FULLY ENCAPSULATED SUIT WITH A SELF-CONTAINED BREATHING APPARATUS. EMPLOYEES SHALL BE PAID HAZMAT PAY IN INCREMENTS OF FOUR(4) AND EIGHT(8) HOURS | 37.88 | 20.93 | 58.81 |
| FOOTNOTE A - ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERFIFICATION IS REQUIRED, SHALL BE COMPENSATED AS A PREMIUM, IN ADDITION TO THE CLASSIFICATION WORKING IN AS FOLLOWS: LEVEL C-D: - $.50 PER HOUR - THIS LEVEL MAY USE AN AIR PURIFYING RESPIRATOR OR ADDITIONAL PROTECTIVE CLOTHING. LEVEL A-B: - $1.00 PER HOUR - USES SUPPLIED AIR IN CONJUNCTION WITH A CHEMICAL SPLASH SUIT OR FULLY ENCAPSULATED SUIT WITH A SELF-CONTAINED BREATHING APPARATUS. EMPLOYEES SHALL BE PAID HAZMAT PAY IN INCREMENTS OF FOUR(4) AND EIGHT(8) HOURS | 37.56 | 20.93 | 58.49 |
| C-D: - $.50 PER HOUR - THIS LEVEL MAY USE AN AIR PURIFYING RESPIRATOR OR ADDITIONAL PROTECTIVE CLOTHING. LEVEL A-B: - $1.00 PER HOUR - USES SUPPLIED AIR IN CONJUNCTION WITH A CHEMICAL SPLASH SUIT OR FULLY ENCAPSULATED SUIT WITH A SELF-CONTAINED BREATHING APPARATUS. EMPLOYEES SHALL BE PAID HAZMAT PAY IN INCREMENTS OF FOUR(4) AND EIGHT(8) HOURS | 37.22 | 20.93 | 58.15 |
| REQUIRED, SHALL BE COMPENSATED AS A PREMIUM, IN ADDITION TO THE CLASSIFICATION WORKING IN AS FOLLOWS: LEVEL C-D: - $.50 PER HOUR - THIS LEVEL MAY USE AN AIR PURIFYING RESPIRATOR OR ADDITIONAL PROTECTIVE CLOTHING. LEVEL A-B: - $1.00 PER HOUR - USES SUPPLIED AIR IN CONJUNCTION WITH A CHEMICAL SPLASH SUIT OR FULLY ENCAPSULATED SUIT WITH A SELF-CONTAINED BREATHING APPARATUS. EMPLOYEES SHALL BE PAID HAZMAT PAY IN INCREMENTS OF FOUR(4) AND EIGHT(8) HOURS | 37.02 | 20.93 | 57.95 |
| FOOTNOTE A - ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERFIFICATION IS REQUIRED, SHALL BE COMPENSATED AS A PREMIUM, IN ADDITION TO THE CLASSIFICATION WORKING IN AS FOLLOWS: LEVEL C-D - $.50 PER HOUR - THIS LEVEL MAY USE AN AIR PURIFYING RESPIRATOR OR ADDITIONAL PROTECTIVE CLOTHING. LEVEL A-B: - $1.00 PER HOUR - USES SUPPLIED AIR IN CONJUNCTION WITH A CHEMICAL SPLASH SUIT OR FULLY ENCAPSULATED SUIT WITH A SELF-CONTAINED BREATHING APPARATUS. EMPLOYEES SHALL BE PAID HAZMAT PAY IN INCREMENTS OF FOUR(4) AND EIGHT(8) HOURS | 36.91 | 20.93 | 57.84 |
| FOOTNOTE A - ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERFIFICATION IS REQUIRED, SHALL BE COMPENSATED AS A PREMIUM, IN ADDITION TO THE CLASSIFICATION WORKING IN AS FOLLOWS: LEVEL C-D: - $.50 PER HOUR - THIS LEVEL MAY USE AN AIR PURIFYING RESPIRATOR OR ADDITIONAL PROTECTIVE CLOTHING. LEVEL A-B: - $1.00 PER HOUR - USES SUPPLIED AIR IN CONJUNCTION WITH A CHEMICAL SPLASH SUIT OR FULLY ENCAPSULATED SUIT WITH A SELF-CONTAINED BREATHING APPARATUS. EMPLOYEES SHALL BE PAID HAZMAT PAY IN INCREMENTS OF FOUR(4) AND EIGHT(8) HOURS | 36.58 | 20.93 | 57.51 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | 55.34 | 20.05 | 75.39 |
| PILEDRIVER PERSON | 65.53 | 19.13 | 84.66 |
| FORM WORKER | 63.98 | 19.13 | 83.11 |
| LINE CONSTRUCTION: LINE PERSON | 64.17 | 24.54 | 88.71 |
| TREE TRIMMER: GROUND PERSON | 22.60 | 16.37 | 38.97 |
| TREE TRIMMER | 42.57 | 17.97 | 60.54 |
| LINE CONSTRUCTION: (CABLE SPLICER) | 64.17 | 24.77 | 88.94 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | 55.19 | 20.94 | 76.13 |
| LINE CONSTRUCTION: (GROUND PERSON) | 37.53 | 17.74 | 55.27 |
| OPERATOR: DRILL (DRILLING MACHINE) | 62.85 | 27.57 | 90.42 |
| OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS) | 61.14 | 27.57 | 88.71 |
| OPERATOR: LOADER (OVERHEAD 8 YARDS & OVER) | 61.93 | 27.57 | 89.50 |
| OPERATOR: LOADER (OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS) | 62.85 | 27.57 | 90.42 |
| OPERATOR: SCRAPER (SELF PROPELLED UNDER 45) | 61.14 | 27.57 | 88.71 |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | 60.46 | 27.57 | 88.03 |
| OPERATOR: OILER (DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT) | 61.14 | 27.57 | 88.71 |
| OPERATOR: GRADER/BLADE | 61.93 | 27.57 | 89.50 |
| OPERATOR: CONCRETE PUMP | 61.14 | 27.57 | 88.71 |
| OPERATOR: BULLDOZER (D9 & UNDER) | 60.46 | 27.57 | 88.03 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (OVER 30 METRIC TONS AND UP TO 50 METRIC TONS) | 61.93 | 27.57 | 89.50 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (15 TO 30 METRIC TONS) | 61.14 | 27.57 | 88.71 |
| IRONWORKER | 57.94 | 34.52 | 92.46 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 50.38 | 16.96 | 67.34 |
| LABORER: NOZZLE PERSON | 52.31 | 17.01 | 69.32 |
| LABORER: PIPELAYER | 51.52 | 16.99 | 68.51 |
| LABORER: CONCRETE SAW CHAIN | 51.52 | 16.99 | 68.51 |
| PAINTER | 41.24 | 14.70 | 55.94 |
| PLUMBER | 60.72 | 34.15 | 94.87 |
| PIPEFITTER | 75.21 | 33.88 | 109.09 |
| SHEET METAL WORKER | 69.86 | 33.39 | 103.25 |
| TRUCK DRIVER: WATER TRUCK | 31.62 | 16.84 | 48.46 |
| TRAFFIC CONTROL: FLAGGER | 32.81 | 10.54 | 43.35 |
| OPERATOR: SCREED | 49.96 | 9.66 | 59.62 |
| OPERATOR: ROLLER | 43.21 | 19.20 | 62.41 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 32.35 | 13.44 | 45.79 |
| OPERATOR: MILLING MACHINE | 48.95 | 10.33 | 59.28 |
| OPERATOR: MECHANIC | 37.11 | 19.20 | 56.31 |
| OPERATOR: FORKLIFT | 49.89 | — | 49.89 |
| OPERATOR: CRANE | 43.59 | 17.94 | 61.53 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 51.50 | — | 51.50 |
| MILLWRIGHT | 51.09 | 8.85 | 59.94 |
| LABORER: FENCE ERECTOR | 29.01 | — | 29.01 |
| LABORER: LANDSCAPE | 27.40 | — | 27.40 |
| LABORER: HOD CARRIER | 38.58 | 10.89 | 49.47 |
| LABORER: COMMON OR GENERAL | 34.00 | 10.70 | 44.70 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 41.71 | 6.33 | 48.04 |
| ELECTRICIAN | 39.74 | 13.97 | 53.71 |
| CEMENT MASON/CONCRETE FINISHER | 49.31 | — | 49.31 |
| CARPENTER, EXCLUDES FORM WORK | 44.48 | 15.52 | 60.00 |
| TRUCK DRIVER: DUMP TRUCK | 55.48 | 27.52 | 83.00 |
| TRUCK DRIVER: ASPHALT MIX | 55.43 | 27.52 | 82.95 |
| GRADE CHECKER | 48.64 | 18.82 | 67.46 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 39.00 | 14.40 | 53.40 |