Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (PIPE INSULATION) | 75.37 | 18.82 | 94.19 |
| BRICKLAYER | 55.34 | 20.05 | 75.39 |
| TILE SETTER | 49.70 | 18.62 | 68.32 |
| TILE FINISHER | 40.98 | 18.17 | 59.15 |
| MILLWRIGHT | 55.39 | 22.38 | 77.77 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING MECHANIC, DRYWALL HANGER & FORM WORK) | 63.98 | 19.13 | 83.11 |
| ELECTRICIAN | 75.96 | 33.48 | 109.44 |
| POWER EQUIPMENT OPERATOR: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS | 55.43 | 27.57 | 83.00 |
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; DOZERS-D-9 AND UNDER; ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS | 59.23 | 27.57 | 86.80 |
| POWER EQUIPMENT OPERATOR: GROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; LOADERS-OVERHEAD UNDER 6 YARDS; MECHANIC | 59.88 | 27.57 | 87.45 |
| POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) | 63.35 | 27.57 | 90.92 |
| POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 90 METRIC TONS | 62.47 | 27.57 | 90.04 |
| POWER EQUIPMENT OPERATOR: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC TONS TO 90 METRIC TONS | 61.56 | 27.57 | 89.13 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES OVER 30 METRIC TONS TO 50 METRIC TONS; LOADER- OVERHEAD 6 YARDS TO, BUT NOT INCLUDING 8 YARDS; DOZER D-10 | 60.67 | 27.57 | 88.24 |
| RADIUS MILES FROM THE RESPECTIVE CITY HALL | 52.31 | 17.01 | 69.32 |
| ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES) ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | 51.52 | 16.99 | 68.51 |
| ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | 50.38 | 16.96 | 67.34 |
| GLAZIER | 61.14 | 23.76 | 84.90 |
| PAINTER (BRUSH AND ROLLER, EXCLUDES SPRAY AND DRYWALL FINISHING/TAPING) | 41.24 | 14.70 | 55.94 |
| SOFT FLOOR LAYER (INCLUDING VINYL AND CARPET) | 42.01 | 20.20 | 62.21 |
| CEMENT MASON/CONCRETE FINISHER | 54.16 | 21.27 | 75.43 |
| PLUMBERS AND PIPEFITTERS | 75.21 | 33.88 | 109.09 |
| ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) | 44.50 | 16.45 | 60.95 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 44.13 | 26.40 | 70.53 |
| SHEET METAL WORKER (HVAC DUCT WORK ONLY) | 69.86 | 33.39 | 103.25 |
| TRUCK DRIVER: DUMP TRUCK | 23.50 | 6.87 | 30.37 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 24.83 0.00 PLUMBER | 35.00 | — | 35.00 |
| PAINTER: SPRAY | 17.80 | 4.18 | 21.98 |
| PAINTER: DRYWALL FINISHING/TAPING | 33.32 | — | 33.32 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 27.94 | — | 27.94 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELEVATOR MECHANIC. FOOTNOTE: A. PAID VACATION EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | 67.61 | 38.44 | 106.05 |
| LABORER (COMMON OR GENERAL) | 50.38 | 16.96 | 67.34 |
| GLAZIER | 40.28 | 16.06 | 56.34 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT AND METAL ROOF INSTALLATION) | 52.40 | 32.72 | 85.12 |
| ROOFER | 26.11 | — | 26.11 |
| PLUMBER | 26.72 | 3.30 | 30.02 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | 16.00 | — | 16.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 33.25 | — | 33.25 |
| ELECTRICIAN | 19.00 | 3.17 | 22.17 |
| CEMENT MASON/CONCRETE FINISHER | 27.83 | — | 27.83 |
| CARPENTER | 21.15 | 0.35 | 21.50 |
| TRUCK DRIVER: DUMP TRUCK | 54.68 | 27.52 | 82.20 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER | 63.98 | 19.13 | 83.11 |
| ELECTRICIAN | 75.96 | 33.48 | 109.44 |
| ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) - $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS ABERDEEN, BELLINGHAM, BREMERTON, EVERETT, KENT, MOUNT VERNON, PORT ANGELES, PORT TOWNSEND, SEATTLE, SHELTON, WENATCHEE, YAKIMA | 55.43 | 27.57 | 83.00 |
| ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES) ZONE 2 (26-45 RADIUS MILES) - $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: ABERDEEN, BELLINGHAM, BREMERTON, EVERETT, KENT, MOUNT VERNON, PORT ANGELES, PORT TOWNSEND, SEATTLE, SHELTON, WENATCHEE, YAKIMA | 59.23 | 27.57 | 86.80 |
| ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES) ZONE 2 (26-45 RADIUS MILES) - $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: ABERDEEN, BELLINGHAM, BREMERTON, EVERETT, KENT, MOUNT VERNON, PORT ANGELES, PORT TOWNSEND, SEATTLE, SHELTON, WENATCHEE, YAKIMA | 59.88 | 27.57 | 87.45 |
| ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) - $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: ABERDEEN, BELLINGHAM, BREMERTON, EVERETT, KENT, MOUNT VERNON, PORT ANGELES, PORT TOWNSEND, SEATTLE, SHELTON, WENATCHEE, YAKIMA | 63.35 | 27.57 | 90.92 |
| ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) - $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS ABERDEEN, BELLINGHAM, BREMERTON, EVERETT, KENT, MOUNT VERNON, PORT ANGELES, PORT TOWNSEND, SEATTLE, SHELTON, WENATCHEE, YAKIMA | 62.47 | 27.57 | 90.04 |
| ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) - $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: ABERDEEN, BELLINGHAM, BREMERTON, EVERETT, KENT, MOUNT VERNON, PORT ANGELES, PORT TOWNSEND, SEATTLE, SHELTON, WENATCHEE, YAKIMA | 61.56 | 27.57 | 89.13 |
| ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) - $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: ABERDEEN, BELLINGHAM, BREMERTON, EVERETT, KENT, MOUNT VERNON, PORT ANGELES, PORT TOWNSEND, SEATTLE, SHELTON, WENATCHEE, YAKIMA | 60.67 | 27.57 | 88.24 |
| IRONWORKER (REINFORCING & STRUCTURAL) | 57.94 | 34.52 | 92.46 |
| ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | 52.31 | 17.01 | 69.32 |
| ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES) ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | 51.52 | 16.99 | 68.51 |
| RADIUS MILES FROM THE RESPECTIVE CITY HALL | 50.38 | 16.96 | 67.34 |
| RADIUS MILES FROM THE RESPECTIVE CITY HALL | 40.88 | 16.72 | 57.60 |
| PAINTER (BRUSH, ROLLER AND SPRAY) | 41.24 | 14.70 | 55.94 |
| CEMENT MASON/CONCRETE FINISHER | 54.16 | 21.27 | 75.43 |
| TRUCK DRIVER: 10 YARD TRUCK | 24.61 | 8.34 | 32.95 |
| TRUCK DRIVER: WATER TRUCK | 24.36 | 8.30 | 32.66 |
| PIPEFITTER | 30.00 | 8.35 | 38.35 |
| LABORER: LANDSCAPE | 14.67 | — | 14.67 |
| WORKING IN AS FOLLOWS: LEVEL C: +$0.25 PER HOUR - THIS LEVEL USES AN AIR PURIFYING RESPIRATOR OR ADDITIONAL PROTECTIVE CLOTHING. LEVEL B: +$0.50 PER HOUR - USES SAME RESPIRATOR PROTECTION AS LEVEL A. SUPPLIED AIR LINE IS PROVIDED IN CONJUNCTION WITH A CHEMICAL ""SPLASH SUIT."" LEVEL A: +$0.75 PER HOUR - THIS LEVEL UTILIZES A FULLY- ENCAPSULATED SUIT WITH A SELF-CONTAINED BREATHING APPARATUS OR A SUPPLIED AIR LINE | 54.59 | 27.52 | 82.11 |
| WORKING IN AS FOLLOWS: LEVEL C: +$0.25 PER HOUR - THIS LEVEL USES AN AIR PURIFYING RESPIRATOR OR ADDITIONAL PROTECTIVE CLOTHING. LEVEL B: +$0.50 PER HOUR - USES SAME RESPIRATOR PROTECTION AS LEVEL A. SUPPLIED AIR LINE IS PROVIDED IN CONJUNCTION WITH A CHEMICAL ""SPLASH SUIT."" LEVEL A: +$0.75 PER HOUR - THIS LEVEL UTILIZES A FULLY- ENCAPSULATED SUIT WITH A SELF-CONTAINED BREATHING APPARATUS OR A SUPPLIED AIR LINE | 55.43 | 27.52 | 82.95 |