Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) A PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | 40.77 | 20.17 | 60.94 |
| OTHER GASES. THE APPLICATION INCLUDES ALL COMPONENTS INVOLVED IN CREATING THE RATED BARRIER AT PERIMETER SLAB EDGES AND EXTERIOR CAVITIES, THE HEAD OF GYPSUM BOARD OR CONCRETE WALLS, JOINTS BETWEEN RATED WALL OR FLOOR COMPONENTS, SEALING OF PENETRATING ITEMS AND BLANK OPENINGS. A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | 30.21 | 10.43 | 40.64 |
| BOILERMAKER | 38.97 | 27.39 | 66.36 |
| BRICKLAYER | 38.80 | 15.17 | 53.97 |
| MASON - STONE | 45.65 | 21.21 | 66.86 |
| IRONWORKER, ORNAMENTAL AND STRUCTURAL | 37.86 | 25.86 | 63.72 |
| GLAZIER | 32.41 | 14.46 | 46.87 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 29.16 | 11.86 | 41.02 |
| DRYWALL FINISHER/TAPER | 29.16 | 11.86 | 41.02 |
| PLUMBER A.PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY | 53.30 | 23.71 | 77.01 |
| PIPEFITTER: INCLUDES HVAC PIPE, UNIT AND TEMPERATURE CONTROLS INSTALLATIONS A.PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY | 55.00 | 24.46 | 79.46 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 45.22 | 26.39 | 71.61 |
| SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION A.PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY | 53.42 | 23.20 | 76.62 |
| WATERPROOFER | 21.75 | 1.57 | 23.32 |
| TRUCK DRIVER: DUMP TRUCK | 19.22 | 2.58 | 21.80 |
| TILE SETTER | 27.80 | 10.25 | 38.05 |
| TILE FINISHER | 23.40 | — | 23.40 |
| ROOFER | 15.83 | 3.06 | 18.89 |
| OPERATOR: ROLLER | 16.25 | 4.88 | 21.13 |
| OPERATOR: LOADER | 22.26 | 3.57 | 25.83 |
| OPERATOR: FORKLIFT | 21.56 | 7.57 | 29.13 |
| OPERATOR: CRANE | 31.68 | 2.64 | 34.32 |
| OPERATOR: BULLDOZER | 21.99 | 4.98 | 26.97 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 18.95 | 4.03 | 22.98 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 23.50 | 4.50 | 28.00 |
| LABORER: PIPELAYER | 16.81 | 4.26 | 21.07 |
| LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON TENDING AND CEMENT MASON TENDING | 15.03 | 2.90 | 17.93 |
| IRONWORKER, REINFORCING | 25.85 | 6.94 | 32.79 |
| FLOOR LAYER: SOFT FLOORS | 18.75 | — | 18.75 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS AND SOUND AND COMMUNICATION SYSTEMS | 32.44 | 8.88 | 41.32 |
| CEMENT MASON/CONCRETE FINISHER | 21.94 | 3.36 | 25.30 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK | 23.89 | 5.23 | 29.12 |
| BRICK POINTER/CAULKER/CLEANER | 19.68 | — | 19.68 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (CRANES UNDER 90 TONS) | 39.99 | 18.05 | 58.04 |
| POWER EQUIPMENT OPERATOR (CRANES 90 TONS & OVER CAPACITY; TOWER & CLIMBING CRANES WITH CONTROLS 100 FT. ABOVE GROUND) | 40.99 | 18.05 | 59.04 |
| WATERPROOFER | 22.50 | 1.05 | 23.55 |
| TRUCK DRIVER: DUMP TRUCK | 16.30 | — | 16.30 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 21.48 | — | 21.48 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 15.21 0.97 ROOFER | 16.22 | 0.97 | 17.19 |
| PLUMBER | 20.10 | 1.57 | 21.67 |
| PAINTER (BRUSH AND ROLLER) | 14.64 | — | 14.64 |
| OPERATOR: LOADER | 20.64 | — | 20.64 |
| OPERATOR: BULLDOZER | 15.29 | 2.27 | 17.56 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 15.26 | 0.80 | 16.06 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 19.21 | 1.77 | 20.98 |
| LABORER: PIPELAYER | 14.88 | 1.51 | 16.39 |
| LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON TENDING AND CEMENT MASON TENDING | 14.00 | 2.45 | 16.45 |
| IRONWORKER, STRUCTURAL | 21.55 | 1.39 | 22.94 |
| IRONWORKER, ORNAMENTAL | 15.59 | — | 15.59 |
| INSULATOR - BATT | 12.36 | 0.69 | 13.05 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | 18.78 | 2.32 | 21.10 |
| DRYWALL HANGER AND METAL STUD INSTALLER | 17.20 | — | 17.20 |
| DRYWALL FINISHER/TAPER | 16.85 | — | 16.85 |
| CEMENT MASON/CONCRETE FINISHER | 20.13 | 1.00 | 21.13 |
| CARPENTER | 20.61 | 1.16 | 21.77 |
| BRICKLAYER | 20.16 | 0.50 | 20.66 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION | 36.85 | 14.13 | 50.98 |
| CEMENT MASON/CONCRETE FINISHER | 20.70 | 8.03 | 28.73 |
| TRUCK DRIVER: SINGLE & MULTI AXLE | 18.84 | — | 18.84 |
| TRUCK DRIVER: HEAVY OVER 7 CY | 18.05 | — | 18.05 |
| TRUCK DRIVER: FUEL AND LUBRICANT SERVICE | 18.25 | — | 18.25 |
| TRUCK DRIVER : HEAVY 7CY & UNDER | 15.53 | — | 15.53 |
| TRAFFIC CONTROL: FLAGGER | 13.64 | — | 13.64 |
| PAVEMENT MARKING TRUCK DRIVER | 18.78 | — | 18.78 |
| PAVEMENT MARKING OPERATOR | 22.15 | — | 22.15 |
| OPERATOR: BULLDOZER, INCLUDING UTILITY | 20.64 | — | 20.64 |
| OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR | 20.58 | 2.31 | 22.89 |
| OPERATOR: SCREED | 22.13 | 4.89 | 27.02 |
| OPERATOR: ROLLER (FINISHING) | 18.73 | 3.23 | 21.96 |
| OPERATOR: ROLLER | 18.92 | — | 18.92 |
| OPERATOR: PILEDRIVER | 21.83 | 4.08 | 25.91 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 20.33 | 2.81 | 23.14 |
| OPERATOR: PAVEMENT PLANER GROUNDSMEN | 19.75 | — | 19.75 |
| OPERATOR: PAVEMENT PLANER | 21.14 | — | 21.14 |
| OPERATOR: MILLING MACHINE | 23.19 | 2.94 | 26.13 |
| OPERATOR: MECHANIC | 22.84 | — | 22.84 |
| OPERATOR: LOADER | 18.92 | — | 18.92 |
| OPERATOR: HYDROSEEDER | 16.64 | — | 16.64 |
| OPERATOR: GRADER/BLADE | 23.21 | — | 23.21 |
| OPERATOR: GRADALL | 19.26 | — | 19.26 |
| OPERATOR: DRILL | 24.89 | — | 24.89 |
| OPERATOR: CRANE | 29.46 | — | 29.46 |
| OPERATOR: BROOM/SWEEPER | 17.40 | 2.01 | 19.41 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 19.00 | 3.49 | 22.49 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 23.93 | — | 23.93 |
| LABORER: POWER TOOL OPERATOR | 15.69 | — | 15.69 |
| LABORER: PIPELAYER | 20.48 | — | 20.48 |
| LABORER: GRADE CHECKER | 14.88 | — | 14.88 |
| LABORER: COMMON OR GENERAL | 16.66 | 3.07 | 19.73 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 19.05 | 1.75 | 20.80 |
| IRONWORKER, STRUCTURAL | 34.18 | — | 34.18 |
| IRONWORKER, REINFORCING | 34.18 | — | 34.18 |
| FENCE ERECTOR | 15.28 | — | 15.28 |
| CARPENTER, INCLUDES FORM WORK | 20.97 | — | 20.97 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| MASON - STONE | 45.65 | 21.21 | 66.86 |
| FORM WORKER | 35.89 | 14.44 | 50.33 |
| ELECTRICIAN | 59.50 | 23.06 | 82.56 |
| POWER EQUIPMENT OPERATOR: LOADER | 36.31 | 13.27 | 49.58 |
| POWER EQUIPMENT OPERATOR: CRANE | 39.99 | 18.05 | 58.04 |
| IRONWORKER | 31.00 | 18.28 | 49.28 |
| LABORER: PIPELAYER | 34.27 | 8.70 | 42.97 |
| CEMENT MASON/CONCRETE FINISHER | 30.50 | 14.23 | 44.73 |
| PIPEFITTER | 55.00 | 24.46 | 79.46 |
| TRUCK DRIVER: DUMP TRUCK | 16.44 | 2.83 | 19.27 |
| OPERATOR: BULLDOZER | 24.42 | — | 24.42 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 21.37 | 3.83 | 25.20 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 26.86 | 5.98 | 32.84 |
| LABORER: LANDSCAPE | 23.00 | 2.32 | 25.32 |
| LABORER: COMMON OR GENERAL | 18.67 | 3.95 | 22.62 |
| CARPENTER | 22.74 | 7.82 | 30.56 |