Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) A PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | 40.77 | 20.17 | 60.94 |
| ELECTRICIAN | 37.95 | 18.02 | 55.97 |
| ELEVATOR MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY. B. VACATIONS EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OR 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT | 51.39 | 38.44 | 89.83 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | 38.79 | 18.05 | 56.84 |
| PIPEFITTER: INCLUDES HVAC UNIT INSTALLATION A PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY | 55.00 | 24.46 | 79.46 |
| TRUCK DRIVER: DUMP TRUCK | 11.25 | 0.57 | 11.82 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 17.73 | 6.44 | 24.17 |
| ROOFER | 15.56 | 3.06 | 18.62 |
| PLUMBER | 21.74 | 5.45 | 27.19 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 14.11 | — | 14.11 |
| LABORER: COMMON OR GENERAL | 16.00 | — | 16.00 |
| CARPENTER | 16.96 | — | 16.96 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| PLUMBER | 19.84 | 3.38 | 23.22 |
| PAINTER (BRUSH AND ROLLER) | 10.17 | — | 10.17 |
| OPERATOR: LOADER | 18.75 | — | 18.75 |
| LABORER: COMMON OR GENERAL | 9.50 | — | 9.50 |
| ELECTRICIAN | 15.75 | — | 15.75 |
| CARPENTER | 17.00 | — | 17.00 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: SINGLE & MULTI AXLE | 19.48 | — | 19.48 |
| TRUCK DRIVER: HEAVY OVER 7 CY | 17.74 | — | 17.74 |
| TRUCK DRIVER : HEAVY 7CY & UNDER | 16.69 | — | 16.69 |
| TRAFFIC CONTROL: FLAGGER | 11.99 | — | 11.99 |
| OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR | 21.53 | — | 21.53 |
| OPERATOR: ROLLER | 19.16 | — | 19.16 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 20.15 | — | 20.15 |
| OPERATOR: MILLING MACHINE | 21.13 | — | 21.13 |
| OPERATOR: MECHANIC | 19.15 | — | 19.15 |
| OPERATOR: LOADER | 17.80 | 2.78 | 20.58 |
| OPERATOR: GRADER/BLADE, INCLUDES FINISHING | 26.13 | — | 26.13 |
| OPERATOR: CRANE | 26.68 | — | 26.68 |
| OPERATOR: BULLDOZER | 17.66 | — | 17.66 |
| OPERATOR: BROOM/SWEEPER | 16.15 | 0.23 | 16.38 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 19.97 | — | 19.97 |
| LABORER: PIPELAYER | 16.75 | — | 16.75 |
| LABORER: COMMON OR GENERAL | 16.60 | — | 16.60 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 18.28 | — | 18.28 |
| IRONWORKER, REINFORCING | 20.80 | — | 20.80 |
| CEMENT MASON/CONCRETE FINISHER | 19.35 | — | 19.35 |
| CARPENTER, INCLUDES FORM WORK | 21.73 | 3.06 | 24.79 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: OFF THE ROAD TRUCK | 23.26 | — | 23.26 |
| TRUCK DRIVER: DUMP TRUCK | 14.86 | 0.75 | 15.61 |
| POWER EQUIPMENT OPERATOR: CRANE | 29.08 | 10.26 | 39.34 |
| POWER EQUIPMENT OPERATOR : LOADER | 17.86 | 1.59 | 19.45 |
| POWER EQUIPMENT OPERATOR : EXCAVATOR | 17.31 | 2.78 | 20.09 |
| POWER EQUIPMENT OPERATOR : BULLDOZER | 25.37 | — | 25.37 |
| POWER EQUIPMENT OPERATOR : BACKHOE | 18.11 | 1.72 | 19.83 |
| LABORERS PIPELAYER | 18.48 | 3.52 | 22.00 |
| LABORERS FLAGGER | 10.22 | — | 10.22 |
| LABORERS COMMON OR GENERAL | 13.60 | 1.69 | 15.29 |
| ELECTRICIAN | 25.67 | 4.38 | 30.05 |
| CEMENT MASON/CONCRETE FINISHER | 15.50 | 1.44 | 16.94 |
| CARPENTER | 16.66 | 0.82 | 17.48 |