Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

Davis-Bacon rates — Juab County, Utah

Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.

Pick the construction type that matches your contract, not the highest rate. Building, Residential, Highway and Heavy are separate determinations with different rates, and using the wrong one is a common reason a certified payroll comes back rejected. Where your trade appears under several classifications the choice between them is a judgement call — the plainest match is usually right, and the contracting officer can confirm it.
Building
UT20260084 rev 1 · 05/18/2026 · 26 classifications
ClassificationBase rateFringeTotal
CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY)31.6613.9745.63
ELECTRICIAN41.2317.6658.89
ELEVATOR MECHANIC FOOTNOTE: A: VACATION PAY: 8% WITH 5 OR MORE YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED, 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY55.4338.4493.87
PAINTER (SPRAY ONLY)26.008.7834.78
PLUMBER/PIPEFITTER46.1015.8361.93
SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION)46.7914.8961.68
TRUCK DRIVER: DUMP TRUCK16.49—16.49
TILE SETTER23.00—23.00
TILE FINISHER13.54—13.54
SPRINKLER FITTER (FIRE SPRINKLERS)24.767.8332.59
ROOFER15.62—15.62
PAINTER (BRUSH AND ROLLER, EXCLUDING DRYWALLING/TAPING)12.00—12.00
OPERATOR: LOADER19.34—19.34
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE16.92—16.92
LABORER: PIPELAYER13.57—13.57
LABORER: MASON TENDER - CEMENT/CONCRETE14.79—14.79
LABORER: MASON TENDER - BRICK16.381.0017.38
LABORER: IRRIGATION9.50—9.50
LABORER: COMMON OR GENERAL14.48—14.48
IRONWORKER, STRUCTURAL20.213.2223.43
INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)15.281.6516.93
DRYWALL FINISHER/TAPER19.234.8524.08
CEMENT MASON/CONCRETE FINISHER19.57—19.57
CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION)19.515.1824.69
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)21.291.9523.24
BRICKLAYER22.131.6723.80
Residential
UT20260032 rev 1 · 05/18/2026 · 48 classifications
ClassificationBase rateFringeTotal
OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION)21.5015.6537.15
OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.)23.3715.6539.02
OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR24.3715.6540.02
OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER (OVER 5 CU. YDS. )25.3715.6541.02
OPERATOR: POWER EQUIPMENT: (2A) BLADE/GRADER25.8915.6541.54
OPERATOR: POWER EQUIPMENT: (1) MECHANIC27.5515.6543.20
OPERATOR: POWER EQUIPMENT (6) SCREED22.4115.6538.06
LABORER: COMMON OR GENERAL, CHAIN/CONCRETE SAW, JACKHAMMER AND VIBRATOR18.286.3524.63
PLUMBER30.6010.8541.45
SHEET METAL WORKER16.00—16.00
ROOFER17.14—17.14
PAINTER: BRUSH, ROLLER AND SPRAY15.05—15.05
OPERATOR: TRACKHOE16.14—16.14
LABORER: MASON TENDER (BRICK AND HOD)12.00—12.00
LABORER: MASON TENDER - CEMENT/CONCRETE12.87—12.87
LABORER: LANDSCAPE10.000.1910.19
LABORER: ASPHALT SHOVELER12.95—12.95
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING FOR PHONE SYSTEMS15.651.9817.63
CEMENT MASON/CONCRETE FINISHER16.02—16.02
CARPENTER15.010.9415.95
BRICKLAYER17.41—17.41
TRUCK DRIVER: WATER, FUEL & OIL TANK (LESS THAN 1,200 GAL.)29.3714.6544.02
TRUCK DRIVER: WATER, FUEL & OIL TANK (6,000 GAL. TO LESS THAN 10,000 GAL)28.6014.6543.25
TRUCK DRIVER: WATER, FUEL & OIL TANK (4,000 GAL. TO LESS THAN 6,000 GAL)28.3314.6542.98
TRUCK DRIVER: WATER, FUEL & OIL TANK (25,000 GAL AND OVER)31.2014.6545.85
TRUCK DRIVER: WATER, FUEL & OIL TANK (20,000 GAL TO LESS THAN 25,000 GAL)31.0414.6545.69
TRUCK DRIVER: WATER, FUEL & OIL TANK (2,500 GAL. TO LESS THAN 4,000 GAL)29.5314.6544.18
TRUCK DRIVER: WATER, FUEL & OIL TANK (15,000 GAL TO LESS THAN 20,000 GAL)30.6614.6545.31
TRUCK DRIVER: WATER, FUEL & OIL TANK (10,000 GAL TO LESS THAN 15,000 GAL)30.5914.6545.24
TRUCK DRIVER: WATER, FUEL & OIL TANK (1,200 GAL. TO LESS THAN 2,500 GAL)27.8514.6542.50
TRUCK DRIVER: TRANSIT MIX (OVER 8 CU. YDS. TO 14 CU. YDS)29.7214.6544.37
TRUCK DRIVER: TRANSIT MIX (0 CU. YDS. TO 8 CU. YDS).$ 29.62 14.65 TRUCK DRIVER: TIREMEN AND GREASER30.1914.6544.84
TRUCK DRIVER: OIL SPREADER32.6814.6547.33
TRUCK DRIVER: LOWBOY32.6914.6547.34
TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (PICKUP TRUCK).$ 29.18 14.65 TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (LESS THAN 10 TONS)29.2614.6543.91
TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (20 TONS AND OVER)29.6914.6544.34
TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (15 TONS TO LESS THAN 20 TONS)29.5314.6544.18
TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (10 TONS TO LESS THAN 15 TONS)29.4214.6544.07
TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (LESS THAN 8 CU. YDS.)29.3714.6544.02
TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (95 CU. YDS. TO LESS THAN 105 CU. YDS.)30.5614.6545.21
TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (8 CU YDS. TO LESS THAN 14 CU. YDS.)29.5314.6544.18
TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (75 CU. YDS. TO LESS THAN 95 CU. YDS.)30.3414.6544.99
TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (55 CU. YDS. TO LESS THAN 75 CU. YDS.)30.1214.6544.77
TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (35 CU. YDS. TO LESS THAN 55 CU. YDS.)29.9114.6544.56
TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (14 CU. YDS. TO LESS THAN 35 CU. YDS.)29.6714.6544.32
TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (105 CU. YDS. TO LESS THAN 130 CU. YDS.)30.6914.6545.34
TRUCK DRIVER: CONCRETE PUMPING29.6214.6544.27
TRUCK DRIVER: ARTICULATED32.1414.6546.79
Highway
UT20260107 rev 1 · 05/18/2026 · 35 classifications
ClassificationBase rateFringeTotal
CARPENTER (EXCLUDES FORM WORK)32.1717.5049.67
POWER EQUIPMENT OPERATOR (OILER)31.9917.6449.63
TRUCK DRIVER: WATER TRUCK24.3511.7336.08
TRUCK DRIVER: VACTOR23.40—23.40
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK25.6811.2536.93
TRUCK DRIVER: DUMP TRUCK24.0913.0437.13
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER20.598.6529.24
TRAFFIC CONTROL: FLAGGER13.141.7514.89
OPERATOR: PAVEMENT MARKING GRINDER27.957.0535.00
OPERATOR: SCREED23.9512.1736.12
OPERATOR: ROLLER23.1612.3135.47
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)24.3715.6540.02
OPERATOR: MILLING MACHINE26.7815.6542.43
OPERATOR: MECHANIC26.9213.2340.15
OPERATOR: LOADER24.8612.9137.77
OPERATOR: GRADER/BLADE27.3315.4242.75
OPERATOR: DRILL27.4415.6543.09
OPERATOR: CRANE30.6610.6141.27
OPERATOR: CONCRETE FINISHING MACHINE20.036.5526.58
OPERATOR: BROOM/SWEEPER14.527.8322.35
OPERATOR: BOBCAT/SKID STEER/SKID LOADER23.9710.0634.03
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE22.285.6427.92
LABORER: PIPELAYER17.232.7920.02
LABORER: MASON TENDER - CEMENT/CONCRETE13.462.6416.10
LABORER: LANDSCAPE15.402.5317.93
LABORER: COMMON OR GENERAL22.8312.2535.08
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR23.835.9229.75
IRONWORKER, REINFORCING26.6113.7640.37
INSTALLER - SIGN15.002.5317.53
INSTALLER - GUARDRAIL14.802.6617.46
HIGHWAY/PARKING LOT STRIPING: PAINTER17.602.5320.13
FENCE ERECTOR15.162.5317.69
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING27.452.3029.75
CEMENT MASON/CONCRETE FINISHER20.592.4123.00
CARPENTER (FORM WORK ONLY)22.595.4128.00
Heavy
UT20260092 rev 1 · 05/18/2026 · 10 classifications
ClassificationBase rateFringeTotal
ELECTRICIAN41.2317.6658.89
POWER EQUIPMENT OPERATOR (MECHANIC)33.0416.0949.13
TRAFFIC CONTROL (FLAGGER)23.719.7833.49
TRUCK DRIVER: DUMP TRUCK21.8011.4133.21
OPERATOR: LOADER26.8113.0339.84
OPERATOR: BOBCAT/SKID STEER/SKID LOADER25.29—25.29
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE22.4410.0432.48
LABORER: PIPELAYER17.76—17.76
LABORER: COMMON OR GENERAL17.658.5926.24
CEMENT MASON/CONCRETE FINISHER19.691.1720.86
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.