Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 44.37 | 26.87 | 71.24 |
| ELECTRICIAN (EXCLUDING LOW VOLTAGE WIRING) | 41.23 | 17.66 | 58.89 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 42.17 | 26.63 | 68.80 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 46.79 | 14.89 | 61.68 |
| TILE SETTER | 19.40 | — | 19.40 |
| TILE FINISHER | 17.00 | — | 17.00 |
| PLUMBER | 24.00 | 4.62 | 28.62 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 16.41 | 0.79 | 17.20 |
| LABORER: MASON TENDER - BRICK | 16.54 | — | 16.54 |
| LABORER: COMMON OR GENERAL | 10.03 | — | 10.03 |
| IRONWORKER, STRUCTURAL | 17.41 | 6.13 | 23.54 |
| IRONWORKER, REINFORCING | 15.00 | — | 15.00 |
| INSULATOR - BATT | 13.77 | — | 13.77 |
| INSTALLER - SIDING (METAL/ALUMINUM/VINYL) | 14.75 | — | 14.75 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | 23.36 | 6.06 | 29.42 |
| CEMENT MASON/CONCRETE FINISHER | 21.11 | — | 21.11 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION.$ 19.51 4.71 CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | 20.64 | 0.80 | 21.44 |
| BRICKLAYER | 23.88 | — | 23.88 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ROOFER | 8.00 | — | 8.00 |
| POWER EQUIPMENT OPERATOR - BACKHOE | 7.25 | — | 7.25 |
| PLUMBER | 9.00 | — | 9.00 |
| PAINTER | 7.25 | — | 7.25 |
| LABORERS: UNSKILLED | 7.25 | — | 7.25 |
| LABORERS: HOD CARRIER | 7.25 | — | 7.25 |
| ELECTRICIAN | 7.25 | — | 7.25 |
| CARPENTER | 7.25 | — | 7.25 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | 20.31 | 4.06 | 24.37 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 17.14 | 2.79 | 19.93 |
| TRAFFIC CONTROL: FLAGGER | 12.47 | 2.53 | 15.00 |
| OPERATOR: SCREED | 19.89 | 5.45 | 25.34 |
| OPERATOR: ROLLER | 20.23 | 5.61 | 25.84 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 23.43 | 8.13 | 31.56 |
| OPERATOR: OILER | 19.00 | 5.44 | 24.44 |
| OPERATOR: MILLING MACHINE | 26.53 | 6.00 | 32.53 |
| OPERATOR: MECHANIC | 25.24 | 10.96 | 36.20 |
| OPERATOR: LOADER | 22.53 | 6.92 | 29.45 |
| OPERATOR: GRADER/BLADE | 23.69 | 5.95 | 29.64 |
| OPERATOR: CONCRETE FINISHING MACHINE | 22.57 | 6.55 | 29.12 |
| OPERATOR: BULLDOZER | 21.77 | 4.40 | 26.17 |
| OPERATOR: BROOM/SWEEPER | 18.29 | 5.65 | 23.94 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 20.05 | 3.31 | 23.36 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 22.10 | 5.97 | 28.07 |
| LABORER: PIPELAYER | 15.52 | 2.79 | 18.31 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 17.03 | 0.36 | 17.39 |
| LABORER: LANDSCAPE | 14.45 | 2.79 | 17.24 |
| LABORER: COMMON OR GENERAL | 18.18 | — | 18.18 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 19.88 | 5.71 | 25.59 |
| INSTALLER - SIGN | 18.22 | 2.79 | 21.01 |
| INSTALLER - GUARDRAIL | 17.79 | — | 17.79 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | 16.76 | 1.62 | 18.38 |
| ELECTRICIAN | 26.83 | — | 26.83 |
| CEMENT MASON/CONCRETE FINISHER | 17.36 | 2.04 | 19.40 |
| CARPENTER, INCLUDES FORM WORK | 22.07 | 6.88 | 28.95 |
| TRUCK DRIVER: WATER TRUCK | 29.53 | 14.65 | 44.18 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | 22.03 | 11.88 | 33.91 |
| OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | 35.68 | 17.57 | 53.25 |
| LABORER SANDBLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | 20.85 | 8.65 | 29.50 |
| LABORER POWDERMAN: NATURAL GAS PIPELINE CONSTRUCTION ONLY | 21.65 | 8.65 | 30.30 |
| LABORER FORMWORKER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | 20.85 | 8.65 | 29.50 |
| LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | 20.59 | 8.65 | 29.24 |
| LABORER CHAIN SAW AND POWER DRILL: NATURAL GAS PIPELINE CONSTRUCTION ONLY | 20.85 | 8.65 | 29.50 |
| TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | 12.00 | — | 12.00 |
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | 10.89 | — | 10.89 |
| OPERATOR: LOADER (FRONT END) | 11.38 | — | 11.38 |
| OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION | 13.61 | — | 13.61 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | 12.67 | — | 12.67 |
| LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | 9.00 | — | 9.00 |
| LABORER: COMMON OR GENERAL (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | 10.92 | — | 10.92 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 9.00 | 0.36 | 9.36 |
| CEMENT MASON/CONCRETE FINISHER | 14.00 | 0.56 | 14.56 |
| CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) | 14.75 | 3.03 | 17.78 |
| PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE | 41.06 | 15.75 | 56.81 |
| PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE | 41.71 | 15.75 | 57.46 |
| TRUCK DRIVER: GROUP 3 AMBULANCE , BUS, DUMP TRUCK (2 AND 3 AXLE), FLATBED TRUCK (2 AND 3 AXLE), GREASE TRUCK, HOT PASS TRUCK (3 AXLE), JEEP, PICK-UP, SINGLE AXLE FLOAT (3 AXLE), SKID TRUCK (2 AND 3 AXLE), STATION WAGON, STRINGER BEAD & HOT PASS (2 AXLE), SWAMP BUGGY/ MARSH BUGGY, OR SIMILAR TYPE EQUIPMENT, TEAM DRIVER, WATER TRUCK (2 AND 3 AXLE) NATURAL GAS PIPELINE CONSTRUCTION ONLY PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS GROUP 1: LOW BOY AND TRUCK MECHANIC GROUP 2: STRINGER TRUCK | 40.66 | 15.75 | 56.41 |