| ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | 29.50 | 8.79 | 38.29 |
| BOILERMAKER | 33.17 | 24.92 | 58.09 |
| ELECTRICIAN (COMMUNICATION TECHNICIAN ONLY) | 37.45 | 12.19 | 49.64 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | 37.45 | 12.19 | 49.64 |
| ELEVATOR MECHANIC: FOOTNOTES: A. 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING DAY; CHRISTMAS DAY; AND VETERANS DAY | 53.40 | 38.98 | 92.38 |
| POWER EQUIPMENT OPERATOR (CRANES) | 39.47 | 10.39 | 49.86 |
| IRONWORKER, STRUCTURAL | 27.95 | 8.03 | 35.98 |
| IRONWORKER: ORNAMENTAL | 28.26 | 8.13 | 36.39 |
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | 38.97 | 11.48 | 50.45 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | 38.97 | 11.48 | 50.45 |
| HVAC MECHANIC (ELECTRICAL TEMPERATURE CONTROL INSTALLATION & UNIT INSTALLATION ONLY) | 38.97 | 11.48 | 50.45 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 38.57 | 24.47 | 63.04 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 34.10 | 16.10 | 50.20 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | 34.10 | 16.10 | 50.20 |
| TRUCK DRIVER: WATER TRUCK | 12.00 | 4.11 | 16.11 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | 12.50 | — | 12.50 |
| TRUCK DRIVER: FLATBED TRUCK | 19.65 | 8.57 | 28.22 |
| TRUCK DRIVER: DUMP TRUCK | 12.39 | 1.18 | 13.57 |
| TILE SETTER | 14.94 | — | 14.94 |
| TILE FINISHER | 11.32 | — | 11.32 |
| ROOFER | 12.00 | — | 12.00 |
| PAINTER (BRUSH, ROLLER AND SPRAY), EXCLUDES DRYWALL FINISHING/TAPING | 13.07 | — | 13.07 |
| OPERATOR: ROLLER | 12.00 | — | 12.00 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 16.03 | — | 16.03 |
| OPERATOR: MECHANIC | 18.75 | 5.12 | 23.87 |
| OPERATOR: LOADER | 12.79 | — | 12.79 |
| OPERATOR: GRADER/BLADE | 23.00 | 5.07 | 28.07 |
| OPERATOR: FORKLIFT | 12.50 | — | 12.50 |
| OPERATOR: DRILL | 14.50 | — | 14.50 |
| OPERATOR: BULLDOZER | 14.00 | — | 14.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 14.00 | — | 14.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 15.98 | — | 15.98 |
| LABORER: LANDSCAPE AND IRRIGATION | 8.00 | — | 8.00 |
| LABORER: ROOF TEAROFF | 11.28 | — | 11.28 |
| LABORER: PIPELAYER | 11.00 | — | 11.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 12.00 | — | 12.00 |
| LABORER: MASON TENDER - BRICK | 11.88 | — | 11.88 |
| LABORER: COMMON OR GENERAL | 10.75 | — | 10.75 |
| IRONWORKER, REINFORCING | 12.27 | — | 12.27 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | 20.39 | 3.04 | 23.43 |
| DRYWALL HANGER AND METAL STUD INSTALLER | 15.18 | — | 15.18 |
| DRYWALL FINISHER/TAPER | 13.81 | — | 13.81 |
| CEMENT MASON/CONCRETE FINISHER | 22.27 | 5.30 | 27.57 |
| CAULKER | 15.00 | — | 15.00 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | 16.86 | 4.17 | 21.03 |
| CARPENTER (FORM WORK ONLY) | 13.63 | — | 13.63 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | 17.83 | — | 17.83 |
| BRICKLAYER | 22.15 | — | 22.15 |