| ASBESTOS WORKER/HEAT & FROST INSULATOR | 38.17 | 18.82 | 56.99 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | 52.81 | 38.44 | 91.25 |
| IRONWORKER: ORNAMENTAL | 35.32 | 17.07 | 52.39 |
| IRONWORKER, STRUCTURAL | 35.32 | 17.07 | 52.39 |
| IRONWORKER, REINFORCING | 35.32 | 17.07 | 52.39 |
| PLUMBER | 46.02 | 19.63 | 65.65 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | 34.95 | 16.66 | 51.61 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 35.37 | 15.99 | 51.36 |
| TRUCK DRIVER: DUMP TRUCK | 15.28 | — | 15.28 |
| TILE SETTER | 19.65 | — | 19.65 |
| TILE FINISHER | 14.00 | — | 14.00 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 20.87 | 9.81 | 30.68 |
| ROOFER | 17.00 | — | 17.00 |
| PIPEFITTER | 29.54 | 12.41 | 41.95 |
| PAINTER (BRUSH AND ROLLER) | 14.30 | — | 14.30 |
| OPERATOR: ROLLER | 14.35 | — | 14.35 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 14.70 | — | 14.70 |
| OPERATOR: FORKLIFT | 15.00 | — | 15.00 |
| OPERATOR: DRILL | 26.50 | 4.09 | 30.59 |
| OPERATOR: CRANE | 26.50 | 2.81 | 29.31 |
| OPERATOR: BULLDOZER | 28.19 | 9.65 | 37.84 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 16.84 | — | 16.84 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 24.50 | — | 24.50 |
| LABORER: PIPELAYER | 14.99 | 2.41 | 17.40 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 15.97 | — | 15.97 |
| LABORER: MASON TENDER - BRICK | 13.54 | — | 13.54 |
| LABORER: COMMON OR GENERAL | 12.49 | — | 12.49 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 16.12 | — | 16.12 |
| LABORER GRADE CHECKER | 13.01 | — | 13.01 |
| LABORER DEMOLITION | 16.74 | — | 16.74 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY) | 18.00 | 0.79 | 18.79 |
| GLAZIER | 16.00 | 1.11 | 17.11 |
| ELECTRICIAN | 22.53 | 8.00 | 30.53 |
| CEMENT MASON/CONCRETE FINISHER | 22.79 | — | 22.79 |
| CARPENTER, EXCLUDES DRYWALL HANGING | 19.68 | 0.38 | 20.06 |
| CARPENTER (DRYWALL HANGING ONLY) | 18.32 | — | 18.32 |
| BRICKLAYER | 20.00 | — | 20.00 |