| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 39.18 | 26.07 | 65.25 |
| BOILERMAKER | 48.28 | 33.17 | 81.45 |
| MASON - STONE | 32.66 | 21.58 | 54.24 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING) | 32.66 | 21.58 | 54.24 |
| TERRAZZO WORKER/SETTER | 33.83 | 20.78 | 54.61 |
| TERRAZZO WORKER/GRINDER | 33.94 | 19.03 | 52.97 |
| TERRAZZO FINISHER | 33.23 | 19.03 | 52.26 |
| TILE SETTER | 35.64 | 21.63 | 57.27 |
| TILE FINISHER | 28.76 | 17.16 | 45.92 |
| CARPENTER (INCLUDES DRYWALL HANGING, METAL STUD INSTALLATION, FORM WORK AND SCAFFOLD BUILDING; EXCLUDES ACOUSTICAL CEILING INSTALLATION) | 36.84 | 20.19 | 57.03 |
| MILLWRIGHT | 43.00 | 23.44 | 66.44 |
| ELECTRICIAN (EXCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS, AND LOW VOLTAGE WIRING) | 41.00 | 31.06 | 72.06 |
| ELECTRICIAN (ALARM INSTALLATION, INSTALLATION OF COMMUNICATION AND SOUND SYSTEMS ONLY) | 34.77 | 20.19 | 54.96 |
| ELEVATOR MECHANIC FOOTNOTES: A. VACATION CREDIT: EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE AS VACATION PAY CREDIT, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE B. EIGHT PAID HOLIDAYS (PROVIDED EMPLOYEE HAS WORKED 5 CONSECUTIVE DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | 61.41 | 38.44 | 99.85 |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE AND CONCRETE) | 36.87 | 21.32 | 58.19 |
| POWER EQUIPMENT OPERATOR: CRANE | 47.14 | 31.58 | 78.72 |
| POWER EQUIPMENT OPERATOR (FORKLIFT (UNDER 20 FT.)) | 41.88 | 30.03 | 71.91 |
| POWER EQUIPMENT OPERATOR (BULLDOZER, LOADER, BACKHOE/EXCAVATOR/TRACKHOE, FORKLIFT (20 FT. AND OVER)) | 44.61 | 30.83 | 75.44 |
| IRONWORKER (STRUCTURAL AND REINFORCING) | 37.26 | 32.63 | 69.89 |
| LABORER (VIBRATING PLATE) | 21.57 | 15.04 | 36.61 |
| LABORER (FORKLIFT (MASONRY WORK ONLY)) | 25.29 | 15.04 | 40.33 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | 27.95 | 16.12 | 44.07 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | 41.36 | 29.45 | 70.81 |
| SHEET METAL WORKER: EXCLUDING HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY | 43.09 | 42.52 | 85.61 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 36.13 | 30.32 | 66.45 |
| TRUCK DRIVER: DUMP TRUCK | 24.98 | 11.88 | 36.86 |
| ROOFER | 33.50 | 22.10 | 55.60 |
| PLUMBER, EXCLUDES HVAC UNIT INSTALLATION | 29.28 | 13.45 | 42.73 |
| PLUMBER (HVAC UNIT INSTALLATION ONLY) | 24.31 | 3.95 | 28.26 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 26.96 | 13.93 | 40.89 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 16.09 | 3.44 | 19.53 |
| LABORER: COMMON OR GENERAL | 19.84 | 9.22 | 29.06 |
| HVAC MECHANIC (HVAC TEMPERATURE CONTROLS INSTALLATION ONLY) | 17.00 | 2.35 | 19.35 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | 15.00 | 2.21 | 17.21 |
| CEMENT MASON/CONCRETE FINISHER | 19.81 | 9.03 | 28.84 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | 25.71 | 12.02 | 37.73 |
| OPERATOR: MECHANIC | 36.53 | 22.01 | 58.54 |
| IRONWORKER: ORNAMENTAL | 34.65 | 31.12 | 65.77 |
| LABORER: MASON TENDER - BRICK | 22.29 | 15.92 | 38.21 |
| OPERATOR: OILER | 37.10 | 27.62 | 64.72 |