| BOILERMAKER | 48.28 | 33.17 | 81.45 |
| TILE FINISHER | 28.76 | 17.16 | 45.92 |
| TILE SETTER | 35.64 | 21.63 | 57.27 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING) | 34.73 | 24.14 | 58.87 |
| MASON - STONE | 34.73 | 24.14 | 58.87 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, FLOOR LAYING-CARPET AND VINYL ONLY) | 35.94 | 19.02 | 54.96 |
| PILEDRIVERMAN | 43.13 | 23.42 | 66.55 |
| MILLWRIGHT | 43.00 | 23.44 | 66.44 |
| ELECTRICIAN (INCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING) | 51.45 | 29.77 | 81.22 |
| POWER EQUIPMENT OPERATOR BACKHOE/EXCAVATOR/TRACKHOE, BULLDOZER, COMPACTOR, CRANE*, DRILL, GRADALL, GRADER/BLADE, MECHANIC, FORKLIFT( LULL) *ADD TO CRANE RATE BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 | 41.69 | 24.05 | 65.74 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKIDSTEER/SKID LOADER, DRILL RIG CAISSON, HIGHLIFT, PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 41.69 | 24.05 | 65.74 |
| POWER EQUIPMENT OPERATOR: HOIST, PUMP, FORKLIFT (RIDDEN OR SELF-PROPELLED) BACKHOE/EXCAVATOR/TRACKHOE, BULLDOZER, COMPACTOR, CRANE*, DRILL, GRADALL, GRADER/BLADE, MECHANIC, FORKLIFT( LULL), ROLLER *ADD TO CRANE RATE BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 | 35.62 | 24.05 | 59.67 |
| POWER EQUIPMENT OPERATOR: LOADER | 41.69 | 24.05 | 65.74 |
| POWER EQUIPMENT OPERATOR: OILER | 32.83 | 24.05 | 56.88 |
| IRONWORKER (METAL BUILDINGS: METAL SIDING/WALL PANELS INSTALLATION ONLY) | 33.57 | 32.23 | 65.80 |
| IRONWORKER (ORNAMENTAL, REINFORCING, RIGGER AND STRUCTURAL) | 36.26 | 28.16 | 64.42 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | 30.24 | 12.05 | 42.29 |
| LABORER: COMMON OR GENERAL | 22.73 | 18.97 | 41.70 |
| LABORER: MASON TENDER-BRICK | 22.88 | 18.97 | 41.85 |
| PAINTER: BRUSH AND ROLLER ONLY | 30.56 | 23.72 | 54.28 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY | 32.39 | 23.26 | 55.65 |
| PAINTER: SPRAY ONLY | 27.12 | 24.89 | 52.01 |
| GLAZIER | 25.40 | 25.47 | 50.87 |
| CEMENT MASON/CONCRETE FINISHER | 31.77 | 21.89 | 53.66 |
| PLUMBER | 46.98 | 25.47 | 72.45 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | 48.15 | 29.17 | 77.32 |
| ROOFER (EXCLUDES METAL ROOF INSTALLATION AND WATERPROOFING) | 36.70 | 18.09 | 54.79 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 49.75 | 30.26 | 80.01 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND METAL FLASHING INSTALLATION) | 46.75 | 35.93 | 82.68 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 30.55 | 20.04 | 50.59 |
| ROOFER: WATERPROOFING ONLY | 26.77 | 12.57 | 39.34 |
| TRUCK DRIVER: DUMP TRUCK | 23.36 | 7.60 | 30.96 |
| IRONWORKER (METAL ROOF INSTALLATION ONLY) | 36.72 | 30.38 | 67.10 |