| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) (ASBESTOS ABATEMENT, REMOVAL FROM MECHANICAL SYSTEMS ONLY) | 40.00 | 29.81 | 69.81 |
| BOILERMAKER | 55.00 | 35.48 | 90.48 |
| PILEDRIVERMAN | 36.87 | 20.49 | 57.36 |
| CARPENTER (SCAFFOLD BUILDING AND FORM WORK ONLY) | 36.84 | 20.19 | 57.03 |
| MILLWRIGHT | 43.00 | 23.44 | 66.44 |
| ELECTRICIAN (INCLUDES HVAC/TEMPERATURE CONTROLS INSTALLATION, AND LOW VOLTAGE WIRING; EXCLUDES INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS AND ALARM INSTALLATION) | 40.00 | 27.42 | 67.42 |
| ELECTRICIAN (ALARM INSTALLATION ONLY) | 40.31 | 23.93 | 64.24 |
| ELECTRICIAN (INSTALLATION OF COMMUNICATION AND SOUND SYSTEMS ONLY) | 34.77 | 20.19 | 54.96 |
| ELEVATOR MECHANIC FOOTNOTES: A. EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE AS VACATION PAY CREDIT, AND 6% OF BASIC HOURLY RATE FOR LESS THAN 5 YEARS OF SERVICE B. EIGHT PAID HOLIDAYS (PROVIDED EMPLOYEE HAS WORKED 5 CONSECUTIVE DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | 58.70 | 38.44 | 97.14 |
| POWER EQUIPMENT OPERATOR (PUMP) | 32.25 | 21.32 | 53.57 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | 36.87 | 21.32 | 58.19 |
| POWER EQUIPMENT OPERATOR: CRANE | 47.14 | 31.58 | 78.72 |
| POWER EQUIPMENT OPERATOR (OILER) | 39.42 | 29.30 | 68.72 |
| POWER EQUIPMENT OPERATOR (HOIST (WITH TWO TOWERS), FORKLIFT (20 FT AND OVER, EXCLUDES MASONRY WORK)) | 44.61 | 30.83 | 75.44 |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT., EXCLUDES MASONRY WORK)) | 41.88 | 30.03 | 71.91 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | 37.26 | 32.63 | 69.89 |
| LABORER (ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, AND CEILINGS)) | 27.47 | 19.89 | 47.36 |
| LABORER (JACK HAMMER; MASON TENDER-BRICK) | 27.02 | 19.48 | 46.50 |
| LABORER (FORKLIFT (MASONRY WORK ONLY)) | 28.52 | 19.48 | 48.00 |
| LABORER (CONCRETE WORKER; CONCRETE SAW (WALK BEHIND/HAND HELD)) | 25.01 | 19.48 | 44.49 |
| PAINTER (SPRAY ONLY) | 26.98 | 15.65 | 42.63 |
| PAINTER: BRUSH AND ROLLER ONLY | 25.84 | 16.30 | 42.14 |
| PLUMBER | 41.36 | 29.45 | 70.81 |
| PIPEFITTER (INCLUDES HVAC UNIT INSTALLATION, EXCLUDES HVAC PIPE INSTALLATION) | 41.36 | 29.45 | 70.81 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 49.75 | 28.96 | 78.71 |
| SHEET METAL WORKER: EXCLUDING HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY | 43.09 | 42.52 | 85.61 |
| TRUCK DRIVER: DUMP TRUCK | 19.77 | 5.02 | 24.79 |
| TILE SETTER | 24.31 | 11.62 | 35.93 |
| TILE FINISHER | 20.65 | 8.24 | 28.89 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 29.56 | 19.21 | 48.77 |
| ROOFER: WATERPROOFING ONLY | 28.60 | 18.02 | 46.62 |
| ROOFER, EXCLUDES WATERPROOFING | 17.00 | 2.78 | 19.78 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | 47.38 | 6.89 | 54.27 |
| OPERATOR: ROLLER | 30.39 | 13.72 | 44.11 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 30.39 | 15.05 | 45.44 |
| OPERATOR: LOADER | 27.05 | 14.52 | 41.57 |
| OPERATOR: GRADER/BLADE | 32.51 | 17.98 | 50.49 |
| OPERATOR: GRADALL | 32.70 | 18.43 | 51.13 |
| OPERATOR: DRILL | 25.58 | 17.07 | 42.65 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 24.14 | 13.55 | 37.69 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 31.05 | 10.85 | 41.90 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 26.17 | 4.88 | 31.05 |
| LABORER: LANDSCAPE | 15.01 | — | 15.01 |
| LABORER: COMMON OR GENERAL | 19.70 | 7.14 | 26.84 |
| IRONWORKER, REINFORCING | 28.97 | 6.47 | 35.44 |
| GLAZIER | 20.19 | 6.92 | 27.11 |
| FLOOR LAYER: VINYL FLOORING ONLY | 19.71 | 5.94 | 25.65 |
| FLOOR LAYER: HARDWOOD FLOORS ONLY | 26.91 | 11.88 | 38.79 |
| FLOOR LAYER: CARPET ONLY | 18.78 | 5.02 | 23.80 |
| CEMENT MASON/CONCRETE FINISHER | 27.76 | 8.21 | 35.97 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND METAL STUD INSTALLATION, FORM WORK, AND SCAFFOLD BUILDING | 25.93 | 11.29 | 37.22 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | 24.18 | 12.02 | 36.20 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | 37.73 | 4.59 | 42.32 |
| BRICKLAYER, INCLUDES POINTING, CAULKING, AND CLEANING | 28.56 | 11.56 | 40.12 |
| OPERATOR: BULLDOZER | 37.85 | 22.72 | 60.57 |