| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION AND INDUSTRIAL WORK (INCLUDING DUCT AND PIPE)) | 46.50 | 29.43 | 75.93 |
| BOILERMAKER | 48.28 | 33.17 | 81.45 |
| TILE FINISHER | 28.76 | 17.16 | 45.92 |
| TILE SETTER | 35.64 | 21.63 | 57.27 |
| BRICKLAYER: INCLUDING POINTING, CAULKING, CLEANING AND BRICK REFRACTORY WORK ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | 36.55 | 24.46 | 61.01 |
| MASON - STONE ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | 36.55 | 24.46 | 61.01 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-HARDWOOD, CARPET AND VINYL; FORM WORK, AND SCAFFOLD BUILDING) | 38.92 | 20.06 | 58.98 |
| PILEDRIVERMAN | 43.13 | 23.42 | 66.55 |
| MILLWRIGHT | 43.00 | 23.44 | 66.44 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEM, LOW VOLTAGE WIRING AND HVAC TEMPERATURE CONTROL INSTALLATION) | 49.11 | 36.79 | 85.90 |
| POWER EQUIPMENT OPERATOR BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, BULLDOZER, COMPACTOR, CRANE*, DRILL RIG CAISSONS, DRILL, GRADALL, GRADER/BLADE, MAN LIFT/OUTSIDE ELEVATOR, MECHANIC, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), SCRAPER, FORKLIFT (LULL) *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 | 41.69 | 24.05 | 65.74 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER, COMPRESSOR, CONCRETE PUMP, HIGHLIFT, HOIST, PUMP, ROLLER, TUGBOAT, FORKLIFT (RIDDEN OR SELF-PROPELLED) | 35.62 | 24.05 | 59.67 |
| POWER EQUIPMENT OPERATOR: LOADER | 41.69 | 24.05 | 65.74 |
| POWER EQUIPMENT OPERATOR: OILER | 32.83 | 24.05 | 56.88 |
| POWER EQUIPMENT OPERATOR: LOADER | 29.58 | 20.15 | 49.73 |
| IRONWORKER (METAL ROOF INSTALLATION, ORNAMENTAL, REINFORCING, RIGGER AND STRUCTURAL; METAL BUILDINGS: METAL SIDING/WALL PANELS INSTALLATION) | 38.89 | 34.54 | 73.43 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | 30.24 | 12.05 | 42.29 |
| LABORER (MASON TENDER- BRICK) | 22.17 | 13.65 | 35.82 |
| LABORER (ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, AND CEILINGS)) | 27.97 | 20.39 | 48.36 |
| PAINTER (BRUSH, ROLLER, AND SPRAY, EXCLUDING WORK ON INDUSTRIAL SITES) | 30.56 | 23.72 | 54.28 |
| PAINTER: DRYWALL FINISHING/TAPING | 32.39 | 23.26 | 55.65 |
| PAINTER (INDUSTRIAL: BRUSH AND ROLLER ONLY) | 36.01 | 23.72 | 59.73 |
| PAINTER (INDUSTRIAL: SPRAY AND SANDBLASTER ONLY) | 36.01 | 23.72 | 59.73 |
| GLAZIER | 35.65 | 29.73 | 65.38 |
| CEMENT MASON/CONCRETE FINISHER | 31.77 | 21.89 | 53.66 |
| PLASTERER | 30.69 | 18.99 | 49.68 |
| PIPEFITTER (INDUSTRIAL) | 47.75 | 26.55 | 74.30 |
| PLUMBER (INCLUDES HVAC PIPE INSTALLATION) | 40.02 | 26.55 | 66.57 |
| PIPEFITTER (EXCLUDES WORK ON INDUSTRIAL SITES) | 46.10 | 27.97 | 74.07 |
| ROOFER (INCLUDES WATERPROOFING, EXCLUDES METAL ROOF INSTALLATION) | 41.21 | 21.46 | 62.67 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 49.75 | 30.26 | 80.01 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | 46.75 | 35.93 | 82.68 |
| LABORER: ASPHALT RAKER | 20.92 | 9.09 | 30.01 |
| LABORER: COMMON OR GENERAL | 20.92 | 9.27 | 30.19 |
| LABORER: LANDSCAPE | 18.10 | — | 18.10 |
| LABORER: LUTEMAN | 21.13 | 8.23 | 29.36 |
| TRUCK DRIVER: DUMP TRUCK | 23.36 | 7.60 | 30.96 |