| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 39.18 | 26.07 | 65.25 |
| BOILERMAKER | 55.00 | 35.48 | 90.48 |
| MASON - STONE | 32.66 | 21.58 | 54.24 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING) | 32.66 | 21.58 | 54.24 |
| TILE FINISHER | 27.63 | 13.94 | 41.57 |
| TILE SETTER | 32.85 | 17.56 | 50.41 |
| CARPENTER (ACOUSTICAL CEILING INSTALLER ONLY) | 36.84 | 20.19 | 57.03 |
| CARPENTER (INCLUDING DRYWALL HANGING, METAL STUD INSTALLATION, FORM WORK AND SCAFFOLD BUILDING) | 36.84 | 20.19 | 57.03 |
| MILLWRIGHT | 43.00 | 23.44 | 66.44 |
| ELECTRICIAN (ALARM INSTALLATION, HVAC/TEMPERATURE CONTROLS INSTALLATION AND LOW VOLTAGE WIRING ONLY) | 41.00 | 31.06 | 72.06 |
| ELEVATOR MECHANIC FOOTNOTES: A. VACATION CREDIT: EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE AS VACATION PAY CREDIT, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE B. EIGHT PAID HOLIDAYS (PROVIDED EMPLOYEE HAS WORKED 5 CONSECUTIVE DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | 61.41 | 38.44 | 99.85 |
| POWER EQUIPMENT OPERATOR (PUMP) | 28.36 | 18.10 | 46.46 |
| POWER EQUIPMENT OPERATOR (6) OILER | 39.42 | 29.30 | 68.72 |
| POWER EQUIPMENT OPERATOR (4) PUMP | 40.74 | 29.70 | 70.44 |
| POWER EQUIPMENT OPERATOR (3) HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT) | 41.88 | 30.03 | 71.91 |
| POWER EQUIPMENT OPERATOR (2) BOBCAT/ SKID/ STEER/ SKID LOADER, BULLDOZER, HOIST (WITH TWO TOWERS), MECHANIC, LOADER, FORKLIFT (20 FT. AND OVER) | 44.61 | 30.83 | 75.44 |
| POWER EQUIPMENT OPERATOR (1A) CRANE | 47.14 | 31.58 | 78.72 |
| IRONWORKER (ORNAMENTAL, STRUCTURAL, & REINFORCING) | 37.26 | 32.63 | 69.89 |
| LABORER: COMMON OR GENERAL | 21.02 | 16.88 | 37.90 |
| LABORER (MASON TENDER- BRICK) | 23.41 | 11.19 | 34.60 |
| LABORER (FORKLIFT (MASONRY WORK ONLY)) | 24.91 | 11.19 | 36.10 |
| LABORER (CONCRETE WORKER; CONCRETE SAW (WALK BEHIND/HAND HELD)) | 20.07 | 11.19 | 31.26 |
| PAINTER (BRUSH, ROLLER, SPRAY, AND DRYWALL FINISHING/TAPING) | 27.95 | 16.12 | 44.07 |
| PLUMBER | 41.36 | 29.45 | 70.81 |
| PIPEFITTER (INCLUDES HVAC PIPE AND HVAC UNIT INSTALLATION) | 41.36 | 29.45 | 70.81 |
| ROOFER (EXCLUDES WATERPROOFING) | 40.33 | 32.62 | 72.95 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 49.75 | 28.96 | 78.71 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND SIDING INSTALLATION - METAL/ALUMINUM/VINYL) | 36.13 | 30.32 | 66.45 |
| TRUCK DRIVER: DUMP TRUCK | 23.36 | 7.60 | 30.96 |
| ROOFER: WATERPROOFING ONLY | 28.60 | 18.02 | 46.62 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 33.01 | 18.37 | 51.38 |
| OPERATOR: GRADER/BLADE | 32.51 | 17.98 | 50.49 |
| OPERATOR: GRADALL | 32.70 | 18.43 | 51.13 |
| OPERATOR: DRILL | 28.55 | 15.78 | 44.33 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 30.73 | 15.10 | 45.83 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 27.89 | 19.81 | 47.70 |
| CEMENT MASON/CONCRETE FINISHER | 32.66 | 21.32 | 53.98 |