| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 40.00 | 29.81 | 69.81 |
| BOILERMAKER | 55.00 | 35.48 | 90.48 |
| MASON - STONE | 33.24 | 17.78 | 51.02 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING) | 33.24 | 17.78 | 51.02 |
| TILE SETTER | 31.12 | 21.11 | 52.23 |
| TILE FINISHER | 30.20 | 16.41 | 46.61 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, METAL STUD INSTALLATION, FIRESTOPPING, FORM WORK, METAL FLASHING INSTALLATION, METAL ROOF INSTALLATION, SCAFFOLD BUILDING (EXCLUDING MASONRY/BRICK), SIDING INSTALLATION- METAL, ALUMINUM AND VINYL; EXCLUDING FLOOR LAYING- HARDWOOD, CARPET AND VINYL) | 39.74 | 28.09 | 67.83 |
| MILLWRIGHT | 51.22 | 36.72 | 87.94 |
| CARPENTER (FLOOR LAYING- HARDWOOD, CARPET AND VINYL ONLY) | 41.23 | 29.79 | 71.02 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS, LOW VOLTAGE WIRING, AND SOLAR PANEL WIRING AND INSTALLATION) | 50.00 | 25.93 | 75.93 |
| ELEVATOR MECHANIC FOOTNOTES: A. VACATION CREDIT: EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE AS VACATION PAY CREDIT, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE B. EIGHT PAID HOLIDAYS (PROVIDED EMPLOYEE HAS WORKED 5 CONSECUTIVE DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | 61.41 | 38.44 | 99.85 |
| POWER EQUIPMENT OPERATOR (PUMP) | 28.36 | 18.10 | 46.46 |
| POWER EQUIPMENT OPERATOR: ROLLER | 31.09 | 22.35 | 53.44 |
| POWER EQUIPMENT OPERATOR: CRANE | 37.49 | 24.23 | 61.72 |
| POWER EQUIPMENT OPERATOR (OILER) | 29.77 | 21.95 | 51.72 |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT, EXCLUDES MASONRY WORK)) | 32.23 | 22.68 | 54.91 |
| POWER EQUIPMENT OPERATOR (COMPRESSOR) | 31.09 | 22.35 | 53.44 |
| POWER EQUIPMENT OPERATOR (BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID/STEER/SKID LOADER,BOOM, BULLDOZER, CONCRETE PUMP, HOIST (WITH TWO TOWERS), MECHANIC, ROLLER (HIGH GRADE FINISHING), DRILL RIG CAISSONS, HEAT PLANER, LOADER, FORKLIFT (20 FT. AND OVER, EXCLUDES MASONRY WORK)) | 34.96 | 23.48 | 58.44 |
| IRONWORKER: ORNAMENTAL | 37.26 | 32.63 | 69.89 |
| LABORER (PLASTER TENDER) | 26.74 | 17.34 | 44.08 |
| LABORER (FORKLIFT (MASONRY WORK ONLY); SCAFFOLD BUILDER (BRICK AND MASONRY); MASON TENDER-BRICK) | 26.74 | 17.34 | 44.08 |
| LABORER (CONCRETE WORKER; TAMPER (HAND HELD)) | 25.39 | 17.34 | 42.73 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | 26.45 | 16.30 | 42.75 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | 27.01 | 16.30 | 43.31 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | 59.65 | 42.78 | 102.43 |
| PLUMBER (HVAC MECHANIC- HVAC TEMPERATURE CONTROLS INSTALLATION ONLY) | 59.65 | 42.78 | 102.43 |
| PLUMBER | 56.28 | 35.51 | 91.79 |
| ROOFER (EXCLUDES METAL ROOF INSTALLATION AND WATERPROOFING) | 40.33 | 32.62 | 72.95 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 49.75 | 30.26 | 80.01 |
| SHEET METAL WORKER: EXCLUDING HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY | 43.09 | 42.52 | 85.61 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 36.13 | 30.32 | 66.45 |
| TRUCK DRIVER: DUMP TRUCK | 23.36 | 7.60 | 30.96 |
| ROOFER: WATERPROOFING ONLY | 28.60 | 18.02 | 46.62 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 33.01 | 18.37 | 51.38 |
| OPERATOR: GRADER/BLADE | 32.51 | 17.98 | 50.49 |
| OPERATOR: GRADALL | 32.70 | 18.43 | 51.13 |
| OPERATOR: DRILL | 28.55 | 15.78 | 44.33 |
| LABORER: COMMON OR GENERAL | 23.55 | 8.67 | 32.22 |
| IRONWORKER, STRUCTURAL | 33.55 | 21.92 | 55.47 |
| IRONWORKER, REINFORCING | 26.24 | 14.49 | 40.73 |
| GLAZIER | 29.22 | 15.73 | 44.95 |
| CEMENT MASON/CONCRETE FINISHER | 24.55 | 16.19 | 40.74 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 27.89 | 19.81 | 47.70 |