| BOILERMAKER | 48.28 | 33.17 | 81.45 |
| TILE FINISHER | 28.76 | 17.16 | 45.92 |
| TILE SETTER | 35.64 | 21.63 | 57.27 |
| CARPENTER (SCAFFOLD BUILDING ONLY) | 34.76 | 20.64 | 55.40 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-CARPET AND VINYL, FORM WORK AND GUTTER INSTALLATION; EXCLUDES SCAFFOLD BUILDING) | 34.76 | 20.64 | 55.40 |
| MILLWRIGHT | 43.00 | 23.44 | 66.44 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEM AND LOW VOLTAGE WIRING; EXCLUDES HVAC TEMPERATURE CONTROL INSTALLATION) | 50.86 | 31.78 | 82.64 |
| POWER EQUIPMENT OPERATOR BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, BULLDOZER, CRANE*, LOADER *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 | 36.87 | 21.32 | 58.19 |
| POWER EQUIPMENT OPERATOR: OILER | 29.70 | 21.32 | 51.02 |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 36.87 | 21.32 | 58.19 |
| POWER EQUIPMENT OPERATOR: ROLLER | 32.25 | 21.32 | 53.57 |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE AND CONCRETE) | 36.87 | 21.32 | 58.19 |
| IRONWORKER: ORNAMENTAL, REINFORCING, RIGGER, AND STRUCTURAL | 32.29 | 32.41 | 64.70 |
| LABORER (CONCRETE WORKER) | 25.98 | 19.53 | 45.51 |
| PAINTER (SPRAY ONLY) | 27.95 | 16.12 | 44.07 |
| PAINTER: BRUSH AND ROLLER ONLY | 30.56 | 23.72 | 54.28 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY | 32.39 | 23.26 | 55.65 |
| GLAZIER | 25.40 | 25.47 | 50.87 |
| CEMENT MASON/CONCRETE FINISHER | 31.97 | 21.35 | 53.32 |
| PIPEFITTER (INDUSTRIAL) | 47.75 | 26.55 | 74.30 |
| PLUMBER | 40.02 | 26.55 | 66.57 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION AND HVAC UNIT INSTALLATION, EXCLUDES WORK ON INDUSTRIAL SITES) | 40.02 | 26.55 | 66.57 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 49.75 | 28.96 | 78.71 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | 46.75 | 35.93 | 82.68 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 33.62 | 18.79 | 52.41 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | 33.66 | 18.29 | 51.95 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | 18.43 | 9.74 | 28.17 |
| OPERATOR: FORKLIFT, ALL TYPES | 23.69 | 12.97 | 36.66 |
| PLASTERER | 20.97 | 10.78 | 31.75 |
| ROOFER | 27.00 | 12.19 | 39.19 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 30.58 | 24.04 | 54.62 |
| TRUCK DRIVER: DUMP TRUCK | 24.98 | 12.17 | 37.15 |
| BRICKLAYER, INCLUDING POINTING, CAULKING CLEANING AND BRICK REFRACTORY WORK | 37.17 | 22.94 | 60.11 |
| LABORER: MASON TENDER - BRICK | 23.23 | 18.53 | 41.76 |
| MASON - STONE | 34.00 | 22.63 | 56.63 |
| OPERATOR: MECHANIC | 36.53 | 22.01 | 58.54 |