Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | 26.92 | 13.09 | 40.01 |
| ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS AND SOUND AND COMMUNICATION SYSTEMS (PAWNEE COUNTY (THAT PORTION WEST OF HIGHWAY #18)) | 41.25 | 13.30 | 54.55 |
| ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS AND SOUND AND COMMUNICATION SYSTEMS (PAWNEE COUNTY (THAT PORTION EAST OF STATE HIGHWAY #18)) | 38.38 | 12.89 | 51.27 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | 51.24 | 38.44 | 89.68 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT | 28.77 | 19.05 | 47.82 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | 34.07 | 19.05 | 53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | 35.40 | 19.05 | 54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | 36.14 | 19.05 | 55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER | 27.25 | 19.05 | 46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | 38.09 | 19.05 | 57.14 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | 30.35 | 16.83 | 47.18 |
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | 36.65 | 16.03 | 52.68 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | 36.65 | 16.03 | 52.68 |
| PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION, EXCLUDING HVAC UNIT INSTALLATION) | 36.65 | 16.03 | 52.68 |
| ROOFER | 26.30 | 10.34 | 36.64 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 35.49 | 14.60 | 50.09 |
| TRUCK DRIVER: DUMP AND FLATBED TRUCK | 11.00 | — | 11.00 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 21.86 | 1.19 | 23.05 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 22.18 5.06 PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | 12.22 | — | 12.22 |
| OPERATOR: LOADER (FRONT END) | 16.18 | — | 16.18 |
| OPERATOR: GRADER/BLADE | 14.28 | 1.70 | 15.98 |
| OPERATOR: BULLDOZER | 20.64 | 2.35 | 22.99 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 17.23 | 4.08 | 21.31 |
| OPERATOR: ASPHALT PAVER | 16.88 | — | 16.88 |
| LABORER: PIPELAYER | 12.39 | — | 12.39 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 13.00 | 1.91 | 14.91 |
| LABORER: MASON TENDER - BRICK | 12.52 | — | 12.52 |
| LABORER: COMMON OR GENERAL | 12.45 | 2.79 | 15.24 |
| FORM WORKER | 13.77 | 0.38 | 14.15 |
| ELECTRICIAN: ALARM INSTALLATION | 19.00 | 3.20 | 22.20 |
| ELECTRICIAN (SOUND AND COMMUNICATIONS SYSTEMS INSTALLATION) | 20.66 | 2.64 | 23.30 |
| ELECTRICIAN (LOW VOLTAGE WIRING) | 20.79 | 3.85 | 24.64 |
| DRYWALL FINISHER/TAPER | 13.00 | — | 13.00 |
| CEMENT MASON/CONCRETE FINISHER | 14.26 | 1.27 | 15.53 |
| CAULKER | 20.00 | 1.61 | 21.61 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | 14.58 | 1.57 | 16.15 |
| CARPENTER (DRYWALL HANGING ONLY) | 15.07 | 1.22 | 16.29 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | 25.92 | 11.89 | 37.81 |
| PLUMBER | 33.14 | — | 33.14 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 17.02 | 10.00 | 27.02 |
| LABORER: COMMON OR GENERAL | 12.50 | — | 12.50 |
| IRONWORKER, STRUCTURAL | 17.10 | 4.22 | 21.32 |
| ELECTRICIAN | 19.08 | — | 19.08 |
| CEMENT MASON/CONCRETE FINISHER | 18.57 | — | 18.57 |
| CARPENTER | 14.98 | — | 14.98 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (TULSA COUNTY) | 18.01 | — | 18.01 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (ROGERS COUNTY) | 14.01 | 0.31 | 14.32 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (REMAINING COUNTIES) | 16.36 | — | 16.36 |
| TRUCK DRIVER (WATER TRUCK) | 12.00 | — | 12.00 |
| TRUCK DRIVER (PICKUP TRUCK) | 12.32 | — | 12.32 |
| TRUCK DRIVER (OFF THE ROAD TRUCK) | 13.40 | — | 13.40 |
| TRUCK DRIVER (LOWBOY/FLOAT) | 13.80 | — | 13.80 |
| TRUCK DRIVER (FLATBED TRUCK) | 14.69 | — | 14.69 |
| TRUCK DRIVER (DUMP TRUCK) | 13.97 | — | 13.97 |
| TRAFFIC SIGNAL INSTALLER | 18.04 | — | 18.04 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (TULSA COUNTY) | 15.19 | — | 15.19 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (ROGERS COUNTY) | 15.11 | — | 15.11 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (REMAINING COUNTIES) | 15.16 | — | 15.16 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | 13.87 | — | 13.87 |
| POWER EQUIPMENT OPERATOR: (TRACTOR/BOX BLADE) | 13.67 | — | 13.67 |
| POWER EQUIPMENT OPERATOR: (STRIPING MACHINE) | 11.94 | — | 11.94 |
| POWER EQUIPMENT OPERATOR: (SCRAPER) | 13.34 | — | 13.34 |
| POWER EQUIPMENT OPERATOR: (ROLLER (DIRT COMPACTION)) | 11.71 | — | 11.71 |
| POWER EQUIPMENT OPERATOR: (ROLLER (ASPHALT)) | 12.79 | — | 12.79 |
| POWER EQUIPMENT OPERATOR: (OILER) | 15.28 | — | 15.28 |
| POWER EQUIPMENT OPERATOR: (MIXER) | 14.43 | — | 14.43 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | 14.56 | — | 14.56 |
| POWER EQUIPMENT OPERATOR: (MECHANIC) | 17.46 | — | 17.46 |
| POWER EQUIPMENT OPERATOR: (LOADER (FRONT END)) | 13.81 | — | 13.81 |
| POWER EQUIPMENT OPERATOR: (GRADER/BLADE) | 16.68 | — | 16.68 |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR) | 14.99 | — | 14.99 |
| POWER EQUIPMENT OPERATOR: (DISTRIBUTOR TRUCK) | 13.34 | — | 13.34 |
| POWER EQUIPMENT OPERATOR: (CRANE) | 17.45 | — | 17.45 |
| POWER EQUIPMENT OPERATOR: (CONCRETE SAW) | 11.94 | — | 11.94 |
| POWER EQUIPMENT OPERATOR: (CONCRETE PAVING MACHINE).$ 14.11 0.00 POWER EQUIPMENT OPERATOR: (BULLDOZER) | 14.28 | — | 14.28 |
| POWER EQUIPMENT OPERATOR: (BROOM) | 11.97 | — | 11.97 |
| POWER EQUIPMENT OPERATOR: (BOBCAT/SKID LOADER) | 12.24 | — | 12.24 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE) | 13.95 | 2.75 | 16.70 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVER SCREED) | 12.96 | — | 12.96 |
| LABORER, TRAFFIC CONTROL (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS) (TULSA COUNTY) | 10.94 | — | 10.94 |
| LABORER, TRAFFIC CONTROL (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS) (REMAINING COUNTIES) | 11.05 | — | 11.05 |
| LABORER, COMMON OR GENERAL (WAGONER) | 10.32 | — | 10.32 |
| LABORER, COMMON OR GENERAL (TULSA COUNTY) | 10.84 | — | 10.84 |
| LABORER, COMMON OR GENERAL (ROGERS COUNTY) | 10.14 | — | 10.14 |
| LABORER, COMMON OR GENERAL (REMAINING COUNTIES) | 10.70 | — | 10.70 |
| LABORER, COMMON OR GENERAL (CREEK COUNTY) | 10.95 | — | 10.95 |
| LABORER, ASPHALT RAKER AND SHOVELER (ROGERS COUNTY).$ 11.76 1.57 LABORER, ASPHALT RAKER AND SHOVELER (REMAINING COUNTIES) | 12.40 | 1.57 | 13.97 |
| LABORER (POWER TOOL OPERATOR (INCLUDES CHIPPING GUNS AND HANDHELD CONCRETE SAWS)) | 12.89 | — | 12.89 |
| LABORER (PIPELAYER) | 12.35 | — | 12.35 |
| LABORER (LANDSCAPE) | 8.67 | — | 8.67 |
| IRONWORKER: REINFORCING | 15.38 | — | 15.38 |
| IRONWORKER, STRUCTURAL | 14.21 | — | 14.21 |
| CEMENT MASON/CONCRETE FINISHER (TULSA COUNTY) | 13.44 | — | 13.44 |
| CEMENT MASON/CONCRETE FINISHER (REMAINING COUNTIES).$ 13.36 0.00 CARPENTER, INCLUDES FORM WORK, AND CURB LINE FORMSETTING (TULSA COUNTY) | 12.80 | — | 12.80 |
| CARPENTER, INCLUDES FORM WORK, AND CURB LINE FORMSETTING (ROGERS COUNTY) | 14.82 | — | 14.82 |
| CARPENTER, INCLUDES FORM WORK, AND CURB LINE FORMSETTING (REMAINING COUNTIES) | 13.24 | — | 13.24 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | 51.00 | 23.80 | 74.80 |
| POWER EQUIPMENT OPERATOR: GROUP 6 ROLLER (ASPHALT AND DIRT) | 30.87 | 19.05 | 49.92 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE | 34.07 | 19.05 | 53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | 35.40 | 19.05 | 54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | 36.14 | 19.05 | 55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER | 27.25 | 19.05 | 46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | 38.09 | 19.05 | 57.14 |
| IRONWORKER (STRUCTURAL, REINFORCING, AND ORNAMENTAL) | 30.35 | 16.83 | 47.18 |
| TRUCK DRIVER: DUMP TRUCK | 14.64 | 1.71 | 16.35 |
| OPERATOR: TRACKHOE | 18.54 | 2.78 | 21.32 |
| OPERATOR: SCRAPER | 16.00 | 1.55 | 17.55 |
| OPERATOR: MECHANIC | 19.61 | 9.39 | 29.00 |
| OPERATOR: LOADER (FRONT END) | 14.01 | — | 14.01 |
| OPERATOR: GRADER/BLADE | 17.76 | 3.87 | 21.63 |
| OPERATOR: DRILL | 17.15 | 0.78 | 17.93 |
| OPERATOR: BULLDOZER | 17.98 | 1.75 | 19.73 |
| OPERATOR: BACKHOE/EXCAVATOR | 16.62 | 3.10 | 19.72 |
| LABORER: PIPELAYER | 12.94 | 2.42 | 15.36 |
| LABORER: COMMON OR GENERAL | 11.78 | 2.76 | 14.54 |
| FORM WORKER | 11.77 | — | 11.77 |
| CEMENT MASON/CONCRETE FINISHER | 14.00 | 3.95 | 17.95 |