Davis-Bacon rates — Oklahoma County, Oklahoma

Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.

Pick the construction type that matches your contract, not the highest rate. Building, Residential, Highway and Heavy are separate determinations with different rates, and using the wrong one is a common reason a certified payroll comes back rejected. Where your trade appears under several classifications the choice between them is a judgement call — the plainest match is usually right, and the contracting officer can confirm it.
Building
OK20260049 rev 2 · 05/18/2026 · 42 classifications
ClassificationBase rateFringeTotal
BRICKLAYER26.9213.0940.01
MILLWRIGHT29.1511.8140.96
CARPENTER (FORM WORK ONLY)27.7910.0537.84
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS)41.4013.1454.54
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)24.269.7634.02
ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE51.1138.4489.55
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH LESS THAN 50 TON CAPACITY AND CRANES (AS RATED BY MFG.) LESS THAN 3CU. YD., INCLUDING ALL OVERHEAD CRANS TYPES, GOLDHOFER/MODULAR POWERED TRAILER, MOBILE GANTRY SYSTEM, HEAVY DUTY MECHANIC, WELDER OVERHEAD MONORAIL TYPES CRANE, PANEL BOARD BATCH, PLANT OPERATOR, PILEDRIVER ENGINEER, DRAGLINE, CLAMSHELL SIDEBOOM OR SIMILAR TYPE EQUIPMENT, GRADALL, CHERRY PICKER, HOSIT (WHILE OPERATING 2 OR MORE DUMS); ALL HOIST (WHILE DOING STACK AND CHIMNEY WORK) POWER DRIVEN HOLE DIGGER WITH LESS THAN 30' MAST VACUUMTRUCK, DOZER, LOADER OR HIGH LIFT (TRACK LOADER-NOT SKIDSTEER TYPE) AND BULLDOZER34.0719.0553.12
POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY, INCLUDING ALL OVERHEAD CRANES TYPES. CRANES EQUIPMENT (AS RATED BY MFG.) 3 CU.YD. AND OVER GUY DERRICK, WHIRLEY, POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) EXCAVATOR, BACKHOE, MOTOR PATROL (BLADE)35.4019.0554.45
POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY, INCLUDING ALL OVERHEAD CRANES TYPES36.1419.0555.19
POWER EQUIPMENT OPERATOR: GROUP 10 TRCUK CRANE OILER AND DRIVER, CRANE OILER, PERMANENT BUILDING TYPE ELEVATOR OPERATOR, OILER/ ASSISTNAT ENGINEERS NO CERTIFICATION OR LESS CERTIFICATION THAN ANY ABOVE GROUP27.2519.0546.30
POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. INCLUDUNG ALL OVERHEAD CRANE TYPES. #CRANCES OVER 400 TONS UP TO AND INCLUDING 500 TONS ADD ADDITIONAL $.75 PER HOUR. CRANES OVER 500 TONS AND UP TO AND INCLUDING 700 TONS ASS AN ADDITIONAL $1.50 PER HOUR. CRANES OVER 700 TONS SHALL ADD ADDITIONAL $3.00 PER HOUR. ALL TOWER CRANES38.0919.0557.14
IRONWORKER: ORNAMENTAL AND STRUCTURAL32.1017.3849.48
PLUMBER (EXCLUDES HVAC PIPE INSTALLATION)41.0016.0357.03
HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT)38.2515.5453.79
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION41.0016.0357.03
ROOFER26.3010.3436.64
SPRINKLER FITTER (FIRE SPRINKLERS)39.0525.7764.82
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)33.3816.3649.74
TRUCK DRIVER: DUMP AND FLATBED TRUCK11.60—11.60
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 17.57 4.64 PLASTERER16.10—16.10
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING12.42—12.42
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)13.381.5414.92
OPERATOR: LOADER (FRONT END)16.18—16.18
OPERATOR: GRADER/BLADE14.281.7015.98
OPERATOR: FORKLIFT20.55—20.55
OPERATOR: BULLDOZER20.642.3522.99
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE21.254.3525.60
LABORER: PLASTER TENDER11.00—11.00
LABORER: PIPELAYER12.39—12.39
LABORER: MASON TENDER - CEMENT/CONCRETE13.001.9114.91
LABORER: MASON TENDER - BRICK12.00—12.00
LABORER: LANDSCAPE13.75—13.75
LABORER: COMMON OR GENERAL11.70—11.70
IRONWORKER, REINFORCING17.11—17.11
GLAZIER12.022.4214.44
FENCE ERECTOR14.00—14.00
ELECTRICIAN: ALARM INSTALLATION20.975.2226.19
DRYWALL HANGER, INCLUDES METAL STUD INSTALLATION14.38—14.38
DRYWALL FINISHER/TAPER13.74—13.74
CEMENT MASON/CONCRETE FINISHER16.75—16.75
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION16.613.0019.61
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)14.98—14.98
Residential
OK20260074 rev 1 · 05/18/2026 · 10 classifications
ClassificationBase rateFringeTotal
BRICKLAYER25.9211.8937.81
PLUMBER33.14—33.14
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE16.1210.0026.12
LABORER: COMMON OR GENERAL13.00—13.00
IRONWORKER, STRUCTURAL17.104.2221.32
HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY)30.9112.4243.33
HVAC MECHANIC (HVAC DUCT INSTALLATION ONLY)27.2014.3241.52
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING23.14—23.14
CEMENT MASON/CONCRETE FINISHER18.57—18.57
CARPENTER14.18—14.18
Highway
OK20260015 rev 1 · 05/18/2026 · 40 classifications
ClassificationBase rateFringeTotal
TRUCK DRIVER (WATER TRUCK)12.00—12.00
TRUCK DRIVER (TANDEM AXLE/SEMI TRAILER)14.64—14.64
TRUCK DRIVER (PICKUP TRUCK)12.48—12.48
TRUCK DRIVER (OFF THE ROAD TRUCK)14.39—14.39
TRUCK DRIVER (LOWBOY/FLOAT)13.90—13.90
TRUCK DRIVER (FLATBED TRUCK)14.69—14.69
TRUCK DRIVER (DUMP TRUCK)13.08—13.08
TRAFFIC SIGNAL INSTALLER17.37—17.37
POWER EQUIPMENT OPERATOR: (TRENCHER)13.66—13.66
POWER EQUIPMENT OPERATOR: (TRACTOR/BOX BLADE)16.50—16.50
POWER EQUIPMENT OPERATOR: (STRIPING MACHINE)12.56—12.56
POWER EQUIPMENT OPERATOR: (SCRAPER)13.55—13.55
POWER EQUIPMENT OPERATOR: (ROLLER (DIRT COMPACTION))12.36—12.36
POWER EQUIPMENT OPERATOR: (ROLLER (ASPHALT))13.02—13.02
POWER EQUIPMENT OPERATOR: (OILER)14.06—14.06
POWER EQUIPMENT OPERATOR: (MIXER)14.43—14.43
POWER EQUIPMENT OPERATOR: (MILLING MACHINE)14.62—14.62
POWER EQUIPMENT OPERATOR: (MECHANIC)15.61—15.61
POWER EQUIPMENT OPERATOR: (LOADER (FRONT END))12.95—12.95
POWER EQUIPMENT OPERATOR: (GRADER/BLADE)16.36—16.36
POWER EQUIPMENT OPERATOR: (EXCAVATOR)15.85—15.85
POWER EQUIPMENT OPERATOR: (DISTRIBUTOR TRUCK)13.81—13.81
POWER EQUIPMENT OPERATOR: (CRANE)17.03—17.03
POWER EQUIPMENT OPERATOR: (CONCRETE SAW)11.69—11.69
POWER EQUIPMENT OPERATOR: (CONCRETE PAVING MACHINE).$ 13.61 0.00 POWER EQUIPMENT OPERATOR: (BULLDOZER)15.09—15.09
POWER EQUIPMENT OPERATOR: (BROOM)11.97—11.97
POWER EQUIPMENT OPERATOR: (BOBCAT/SKID LOADER)12.79—12.79
POWER EQUIPMENT OPERATOR: (BACKHOE/TRACKHOE)13.78—13.78
POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE)14.34—14.34
POWER EQUIPMENT OPERATOR: (ASPHALT PAVER SCREED)12.44—12.44
LABORER (TRAFFIC CONTROL (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS))11.69—11.69
LABORER (POWER TOOL OPERATOR (INCLUDES CHIPPING GUNS AND HANDHELD CONCRETE SAWS))12.89—12.89
LABORER (PIPELAYER)12.84—12.84
LABORER (LANDSCAPE)9.63—9.63
LABORER (COMMON OR GENERAL)10.64—10.64
LABORER (ASPHALT RAKER AND SHOVELER)11.31—11.31
IRONWORKER: REINFORCING13.00—13.00
IRONWORKER, STRUCTURAL14.21—14.21
CEMENT MASON/CONCRETE FINISHER12.50—12.50
CARPENTER (INCLUDES FORM WORK)12.78—12.78
Heavy
OK20260026 rev 1 · 05/18/2026 · 20 classifications
ClassificationBase rateFringeTotal
POWER EQUIPMENT OPERATOR: GROUP 6 ROLLER (ASPHALT AND DIRT)30.8719.0549.92
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER34.0719.0553.12
POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST)35.4019.0554.45
POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY36.1419.0555.19
POWER EQUIPMENT OPERATOR: GROUP 10 OILER27.2519.0546.30
POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES38.0919.0557.14
IRONWORKER (STRUCTURAL, REINFORCING, AND ORNAMENTAL)32.1017.3849.48
TRUCK DRIVER: DUMP TRUCK16.500.7417.24
OPERATOR: TRACKHOE17.502.7820.28
OPERATOR: SCRAPER16.001.5517.55
OPERATOR: MECHANIC19.619.3929.00
OPERATOR: LOADER (FRONT END)13.51—13.51
OPERATOR: GRADER/BLADE17.763.8721.63
OPERATOR: DRILL17.150.7817.93
OPERATOR: BACKHOE/EXCAVATOR18.176.2824.45
LABORER: PIPELAYER11.13—11.13
LABORER: COMMON OR GENERAL11.02—11.02
FORM WORKER11.77—11.77
ELECTRICIAN22.865.6128.47
CEMENT MASON/CONCRETE FINISHER12.491.2313.72
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.