Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | 26.92 | 13.09 | 40.01 |
| MILLWRIGHT | 29.15 | 11.81 | 40.96 |
| CARPENTER (FORM WORK ONLY) | 27.79 | 10.05 | 37.84 |
| ELECTRICIAN | 41.40 | 13.14 | 54.54 |
| ELECTRICIAN (LOW VOLTAGE WIRING AND ALARM INSTALLATION ONLY) | 24.26 | 9.76 | 34.02 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | 51.11 | 38.44 | 89.55 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT | 28.77 | 19.05 | 47.82 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | 34.07 | 19.05 | 53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | 35.40 | 19.05 | 54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | 36.14 | 19.05 | 55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER | 27.25 | 19.05 | 46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | 38.09 | 19.05 | 57.14 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | 32.10 | 17.38 | 49.48 |
| PLUMBER (EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | 41.00 | 16.03 | 57.03 |
| PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION, EXCLUDING HVAC UNIT INSTALLATION) | 41.00 | 16.03 | 57.03 |
| ROOFER | 26.30 | 10.34 | 36.64 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 39.05 | 25.77 | 64.82 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 33.38 | 16.36 | 49.74 |
| TRUCK DRIVER: DUMP AND FLATBED TRUCK | 11.60 | — | 11.60 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 19.45 6.38 PLASTERER | 17.50 | — | 17.50 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | 12.17 | — | 12.17 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 13.38 | 1.54 | 14.92 |
| OPERATOR: LOADER (FRONT END) | 16.18 | — | 16.18 |
| OPERATOR: GRADER/BLADE | 14.28 | 1.70 | 15.98 |
| OPERATOR: BULLDOZER | 20.64 | 2.35 | 22.99 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 21.25 | 4.35 | 25.60 |
| LABORER: PLASTER TENDER | 12.00 | — | 12.00 |
| LABORER: PIPELAYER | 12.39 | — | 12.39 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 13.00 | 1.91 | 14.91 |
| LABORER: MASON TENDER - BRICK | 12.00 | — | 12.00 |
| LABORER: LANDSCAPE | 13.75 | — | 13.75 |
| LABORER: COMMON OR GENERAL | 11.40 | — | 11.40 |
| IRONWORKER, REINFORCING | 17.11 | — | 17.11 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | 21.64 | 6.46 | 28.10 |
| GLAZIER | 12.02 | 2.42 | 14.44 |
| FENCE ERECTOR | 16.00 | — | 16.00 |
| DRYWALL HANGER, INCLUDES METAL STUD INSTALLATION | 14.08 | — | 14.08 |
| DRYWALL FINISHER/TAPER | 14.25 | — | 14.25 |
| CEMENT MASON/CONCRETE FINISHER | 16.72 | — | 16.72 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | 16.31 | 2.96 | 19.27 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | 14.45 | — | 14.45 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | 25.92 | 11.89 | 37.81 |
| PLUMBER | 33.14 | — | 33.14 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 17.02 | 10.00 | 27.02 |
| LABORER: COMMON OR GENERAL | 13.00 | — | 13.00 |
| IRONWORKER, STRUCTURAL | 17.10 | 4.22 | 21.32 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY) | 30.08 | 12.42 | 42.50 |
| HVAC MECHANIC (HVAC DUCT INSTALLATION ONLY) | 27.20 | 14.32 | 41.52 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | 19.62 | — | 19.62 |
| CEMENT MASON/CONCRETE FINISHER | 18.57 | — | 18.57 |
| CARPENTER | 14.18 | — | 14.18 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (REMAINING COUNTIES) | 13.72 | — | 13.72 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (CLEVELAND COUNTY) | 12.37 | — | 12.37 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (CANADIAN COUNTY) | 12.00 | — | 12.00 |
| TRUCK DRIVER: DUMP TRUCK (REMAINING COUNTIES) | 12.88 | — | 12.88 |
| TRUCK DRIVER: DUMP TRUCK (CLEVELAND COUNTY) | 12.32 | — | 12.32 |
| TRUCK DRIVER (WATER TRUCK) | 12.00 | — | 12.00 |
| TRUCK DRIVER (PICKUP TRUCK) | 12.48 | — | 12.48 |
| TRUCK DRIVER (OFF THE ROAD TRUCK) | 13.75 | — | 13.75 |
| TRUCK DRIVER (LOWBOY/FLOAT) | 13.90 | — | 13.90 |
| TRUCK DRIVER (FLATBED TRUCK) | 14.69 | — | 14.69 |
| TRAFFIC SIGNAL INSTALLER | 17.37 | — | 17.37 |
| POWER EQUIPMENT OPERATOR: SCRAPER (REMAINING COUNTIES) | 13.19 | — | 13.19 |
| POWER EQUIPMENT OPERATOR: SCRAPER (CLEVELAND COUNTY) | 13.06 | — | 13.06 |
| POWER EQUIPMENT OPERATOR: SCRAPER (CANADIAN COUNTY).$ 12.00 0.00 POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT) (REMAINING COUNTIES) | 12.73 | — | 12.73 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT) (MCCLAIN COUNTY) | 12.94 | — | 12.94 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT) (CLEVELAND COUNTY) | 12.86 | — | 12.86 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT) (CANADIAN COUNTY) | 11.67 | — | 11.67 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (REMAINING COUNTIES) | 12.85 | — | 12.85 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (CLEVELAND COUNTY) | 12.76 | — | 12.76 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (REMAINING COUNTIES) | 14.98 | — | 14.98 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (CLEVELAND COUNTY) | 14.46 | — | 14.46 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (CANADIAN COUNTY) | 12.00 | — | 12.00 |
| POWER EQUIPMENT OPERATOR: CONCRETE SAW (REMAINING COUNTIES) | 11.70 | — | 11.70 |
| POWER EQUIPMENT OPERATOR: CONCRETE SAW (CLEVELAND COUNTY) | 11.64 | — | 11.64 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (REMAINING COUNTIES) | 14.24 | — | 14.24 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (MCCLAIN COUNTY) | 13.36 | — | 13.36 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (REMAINING COUNTIES) | 13.64 | — | 13.64 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (CLEVELAND COUNTY) | 12.91 | — | 12.91 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVING MACHINE (REMAINING COUNTIES) | 14.08 | — | 14.08 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVING MACHINE (MCCLAIN COUNTY) | 14.04 | — | 14.04 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVING MACHINE (CLEVELAND COUNTY) | 14.57 | — | 14.57 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVING MACHINE (CANADIAN COUNTY) | 13.32 | — | 13.32 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | 13.63 | — | 13.63 |
| POWER EQUIPMENT OPERATOR: (TRACTOR/BOX BLADE) | 16.50 | — | 16.50 |
| POWER EQUIPMENT OPERATOR: (STRIPING MACHINE) | 12.56 | — | 12.56 |
| POWER EQUIPMENT OPERATOR: (ROLLER (DIRT COMPACTION)) | 12.27 | — | 12.27 |
| POWER EQUIPMENT OPERATOR: (OILER) | 14.06 | — | 14.06 |
| POWER EQUIPMENT OPERATOR: (MIXER) | 14.43 | — | 14.43 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | 14.93 | — | 14.93 |
| POWER EQUIPMENT OPERATOR: (MECHANIC) | 15.60 | — | 15.60 |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR) | 15.10 | — | 15.10 |
| POWER EQUIPMENT OPERATOR: (DISTRIBUTOR TRUCK) | 13.81 | — | 13.81 |
| POWER EQUIPMENT OPERATOR: (CRANE) | 16.99 | — | 16.99 |
| POWER EQUIPMENT OPERATOR: (CONCRETE PAVING MACHINE).$ 13.61 0.00 POWER EQUIPMENT OPERATOR: (BROOM) | 11.97 | — | 11.97 |
| POWER EQUIPMENT OPERATOR: (BOBCAT/SKID LOADER) | 12.71 | — | 12.71 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PLANT) | 14.70 | — | 14.70 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVER SCREED) | 12.44 | — | 12.44 |
| LABORER, COMMON OR GENERAL (MCCLAIN COUNTY) | 10.37 | — | 10.37 |
| LABORER, COMMON OR GENERAL (LINCOLN COUNTY) | 10.17 | — | 10.17 |
| LABORER, COMMON OR GENERAL (GRADY AND LOGAN COUNTIES) | 10.55 | — | 10.55 |
| LABORER, COMMON OR GENERAL (CLEVELAND COUNTY) | 10.62 | — | 10.62 |
| LABORER, COMMON OR GENERAL (CANADIAN COUNTY) | 10.05 | — | 10.05 |
| LABORER (TRAFFIC CONTROL (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS)) | 11.12 | — | 11.12 |
| LABORER (POWER TOOL OPERATOR (INCLUDES CHIPPING GUNS AND HANDHELD CONCRETE SAWS)) | 12.89 | — | 12.89 |
| LABORER (PIPELAYER) | 12.50 | — | 12.50 |
| LABORER (LANDSCAPE) | 9.63 | — | 9.63 |
| LABORER (ASPHALT RAKER AND SHOVELER) | 11.31 | — | 11.31 |
| IRONWORKER: REINFORCING | 13.63 | — | 13.63 |
| IRONWORKER, STRUCTURAL | 14.21 | — | 14.21 |
| CEMENT MASON/CONCRETE FINISHER (MCCLAIN) | 11.93 | — | 11.93 |
| CEMENT MASON/CONCRETE FINISHER (GRADY, LINCOLN, LOGAN) | 12.47 | — | 12.47 |
| CEMENT MASON/CONCRETE FINISHER (CLEVELAND) | 12.55 | — | 12.55 |
| CEMENT MASON/CONCRETE FINISHER (CANADIAN) | 12.44 | — | 12.44 |
| CARPENTER (INCLUDES FORM WORK) | 13.32 | — | 13.32 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 6 ROLLER (ASPHALT AND DIRT) | 30.87 | 19.05 | 49.92 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | 34.07 | 19.05 | 53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | 35.40 | 19.05 | 54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | 36.14 | 19.05 | 55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER | 27.25 | 19.05 | 46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | 38.09 | 19.05 | 57.14 |
| IRONWORKER (STRUCTURAL, REINFORCING, AND ORNAMENTAL) | 32.10 | 17.38 | 49.48 |
| TRUCK DRIVER: DUMP TRUCK | 16.50 | 0.74 | 17.24 |
| OPERATOR: TRACKHOE | 17.50 | 2.78 | 20.28 |
| OPERATOR: SCRAPER | 16.00 | 1.55 | 17.55 |
| OPERATOR: MECHANIC | 19.61 | 9.39 | 29.00 |
| OPERATOR: LOADER (FRONT END) | 13.51 | — | 13.51 |
| OPERATOR: GRADER/BLADE | 17.76 | 3.87 | 21.63 |
| OPERATOR: DRILL | 17.15 | 0.78 | 17.93 |
| OPERATOR: BACKHOE/EXCAVATOR | 18.17 | 6.28 | 24.45 |
| LABORER: PIPELAYER | 11.13 | — | 11.13 |
| LABORER: COMMON OR GENERAL | 11.81 | 1.09 | 12.90 |
| FORM WORKER | 11.77 | — | 11.77 |
| ELECTRICIAN | 22.00 | 4.76 | 26.76 |
| CEMENT MASON/CONCRETE FINISHER | 12.49 | 1.23 | 13.72 |