Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 33.70 | 24.41 | 58.11 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS AND SOUND AND COMMUNICATION SYSTEMS) | 38.38 | 12.89 | 51.27 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | 51.24 | 38.44 | 89.68 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKKLIFT | 28.77 | 19.05 | 47.82 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE;BACKHHOE; TRACKHOE; EXCAVATOR AND BULLDOZER | 34.07 | 19.05 | 53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | 35.40 | 19.05 | 54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | 36.14 | 19.05 | 55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER | 27.25 | 19.05 | 46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | 38.09 | 19.05 | 57.14 |
| IRONWORKER, STRUCTURAL | 30.35 | 16.83 | 47.18 |
| PIPEFITTER (INCLUDING HVAC PIPE AND UNIT INSTALLATION) | 36.65 | 16.03 | 52.68 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | 35.49 | 14.60 | 50.09 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 39.95 | 0.38 | 40.33 |
| ROOFER | 15.00 | 0.29 | 15.29 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | 24.66 | 10.36 | 35.02 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 13.56 | — | 13.56 |
| LABORER: PIPELAYER | 12.93 | — | 12.93 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 13.04 | — | 13.04 |
| LABORER: MASON TENDER - BRICK | 10.25 | — | 10.25 |
| LABORER: COMMON OR GENERAL | 11.51 | — | 11.51 |
| ELECTRICIAN: ALARM INSTALLATION | 20.47 | 4.52 | 24.99 |
| ELECTRICIAN (SOUND AND COMMUNICATIONS SYSTEMS INSTALLATION) | 22.10 | 5.76 | 27.86 |
| ELECTRICIAN (LOW VOLTAGE WIRING) | 21.14 | 4.96 | 26.10 |
| CEMENT MASON/CONCRETE FINISHER | 16.91 | 0.61 | 17.52 |
| CAULKER | 20.00 | 1.61 | 21.61 |
| CARPENTER | 13.42 | — | 13.42 |
| BRICKLAYER | 20.00 | — | 20.00 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | 7.25 | — | 7.25 |
| TILE SETTER | 7.25 | — | 7.25 |
| SHEET METAL WORKER | 7.25 | — | 7.25 |
| ROOFER | 7.25 | — | 7.25 |
| POWER EQUIPMENT OPERATORS: BULLDOZERS | 7.25 | — | 7.25 |
| POWER EQUIPMENT OPERATORS: (TRENCHING MACHINE) | 7.25 | — | 7.25 |
| POWER EQUIPMENT OPERATORS: (TRACTORS (SMALL)) | 7.25 | — | 7.25 |
| POWER EQUIPMENT OPERATORS: (GRADERS) | 7.25 | — | 7.25 |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | 7.25 | — | 7.25 |
| PLUMBER/PIPEFITTER | 7.25 | — | 7.25 |
| PAINTER (TAPERS AND FINISHERS) | 7.25 | — | 7.25 |
| PAINTER (BRUSH) | 7.25 | — | 7.25 |
| LABORER (LABORERS) | 7.25 | — | 7.25 |
| IRONWORKER | 7.25 | — | 7.25 |
| INSULATION INSTALLER | 7.25 | — | 7.25 |
| FLOOR LAYER: CARPET | 7.25 | — | 7.25 |
| ELECTRICIAN | 7.25 | — | 7.25 |
| DRYWALL INSTALLER & SHEETROCKER | 7.25 | — | 7.25 |
| CEMENT MASON/CONCRETE FINISHER | 7.25 | — | 7.25 |
| CARPENTER | 7.25 | — | 7.25 |
| BRICKLAYER | 7.25 | — | 7.25 |
| AIR CONDITIONING MECHANIC | 7.25 | — | 7.25 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (REMAINING COUNTIES) | 15.75 | — | 15.75 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (MUSKOGEE COUNTY) | 16.14 | — | 16.14 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (MAYES COUNTY) | 16.93 | — | 16.93 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (DELAWARE COUNTY) | 15.15 | — | 15.15 |
| TRUCK DRIVER: DUMP TRUCK (REMAINING COUNTIES) | 13.91 | — | 13.91 |
| TRUCK DRIVER: DUMP TRUCK (MUSKOGEE COUNTY) | 13.93 | — | 13.93 |
| TRUCK DRIVER (WATER TRUCK) | 13.44 | — | 13.44 |
| TRUCK DRIVER (STRAIGHT TRUCK) | 15.92 | — | 15.92 |
| TRUCK DRIVER (SINGLE AXLE TRUCK (INCLUDES PILOT CAR)) | 13.15 | — | 13.15 |
| TRUCK DRIVER (OFF THE ROAD TRUCK) | 13.64 | — | 13.64 |
| TRUCK DRIVER (LOWBOY/FLOAT) | 15.20 | 0.69 | 15.89 |
| TRUCK DRIVER (FLATBED TRUCK) | 16.18 | — | 16.18 |
| TRUCK DRIVER (CONCRETE TRUCK) | 14.22 | — | 14.22 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT) (REMAINING COUNTIES) | 13.48 | — | 13.48 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT) (MUSKOGEE COUNTY) | 12.58 | — | 12.58 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT) (ADAIR COUNTY) | 13.12 | — | 13.12 |
| POWER EQUIPMENT OPERATOR: OILER (REMAINING COUNTIES) | 14.59 | — | 14.59 |
| POWER EQUIPMENT OPERATOR: OILER (MUSKOGEE COUNTY) | 13.38 | — | 13.38 |
| POWER EQUIPMENT OPERATOR: MECHANIC (REMAINING COUNTIES) | 18.77 | — | 18.77 |
| POWER EQUIPMENT OPERATOR: MECHANIC (MUSKOGEE COUNTY) | 18.96 | — | 18.96 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (REMAINING COUNTIES) | 13.66 | — | 13.66 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (MUSKOGEE COUNTY) | 13.83 | — | 13.83 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (REMAINING COUNTIES) | 14.61 | — | 14.61 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (MUSKOGEE COUNTY) | 14.33 | — | 14.33 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (REMAINING COUNTIES) | 16.13 | — | 16.13 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (MUSKOGEE COUNTY) | 14.99 | — | 14.99 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | 14.66 | — | 14.66 |
| POWER EQUIPMENT OPERATOR: (TRANSFER MATERIAL MACHINE) | 12.38 | 0.75 | 13.13 |
| POWER EQUIPMENT OPERATOR: (TRACTOR/BOX BLADE) | 12.83 | — | 12.83 |
| POWER EQUIPMENT OPERATOR: (STRIPING MACHINE) | 11.54 | — | 11.54 |
| POWER EQUIPMENT OPERATOR: (SCRAPER) | 14.13 | — | 14.13 |
| POWER EQUIPMENT OPERATOR: (ROTOMILL) | 17.33 | — | 17.33 |
| POWER EQUIPMENT OPERATOR: (ROLLER (DIRT COMPACTION)) | 12.44 | — | 12.44 |
| POWER EQUIPMENT OPERATOR: (MIXER) | 14.56 | — | 14.56 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | 14.87 | — | 14.87 |
| POWER EQUIPMENT OPERATOR: (GRADER/BLADE) | 16.47 | — | 16.47 |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR) | 14.75 | — | 14.75 |
| POWER EQUIPMENT OPERATOR: (DISTRIBUTOR TRUCK) | 13.34 | — | 13.34 |
| POWER EQUIPMENT OPERATOR: (CRANE) | 18.63 | — | 18.63 |
| POWER EQUIPMENT OPERATOR: (CONCRETE SAW) | 14.65 | — | 14.65 |
| POWER EQUIPMENT OPERATOR: (CONCRETE PAVING MACHINE).$ 14.42 0.00 POWER EQUIPMENT OPERATOR: (BROOM) | 11.02 | — | 11.02 |
| POWER EQUIPMENT OPERATOR: (BOBCAT/SKID LOADER) | 12.56 | — | 12.56 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PLANT) | 14.70 | — | 14.70 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE) | 14.84 | — | 14.84 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVER SCREED) | 14.77 | — | 14.77 |
| LABORER, COMMON OR GENERAL (REMAINING COUNTIES) | 10.64 | — | 10.64 |
| LABORER, COMMON OR GENERAL (OKFUSKEE COUNTY) | 10.55 | — | 10.55 |
| LABORER, COMMON OR GENERAL (MUSKOGEE COUNTY) | 10.68 | — | 10.68 |
| LABORER, COMMON OR GENERAL (MAYES COUNTY) | 10.07 | — | 10.07 |
| LABORER, COMMON OR GENERAL (DELAWARE COUNTY) | 11.16 | — | 11.16 |
| LABORER, COMMON OR GENERAL (CHEROKEE COUNTY) | 11.12 | — | 11.12 |
| LABORER, COMMON OR GENERAL (ADAIR COUNTY) | 11.96 | — | 11.96 |
| LABORER (VIBRATING PLATE) | 12.70 | — | 12.70 |
| LABORER (TRAFFIC CONTROL (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS)) | 10.28 | — | 10.28 |
| LABORER (PIPELAYER) | 11.13 | — | 11.13 |
| LABORER (ASPHALT RAKER AND SHOVELER) | 12.41 | — | 12.41 |
| LABORER (AIR/POWER TOOL OPERATOR (INCLUDES HANDHELD CONCRETE SAWS AND CHIPPING GUNS)) | 12.79 | — | 12.79 |
| IRONWORKER: REINFORCING | 13.63 | — | 13.63 |
| GUARDRAIL INSTALLER (INCLUDES GUARDRAIL/POST DRIVER WORK) | 9.70 | — | 9.70 |
| FORM WORKER/FORM SETTER (INCLUDING CURB LINE SETTING) | 12.30 | — | 12.30 |
| CEMENT MASON/CONCRETE FINISHER (REMAINING COUNTIES).$ 13.70 0.00 CEMENT MASON/CONCRETE FINISHER (OTTAWA COUNTY) | 14.72 | 1.35 | 16.07 |
| CEMENT MASON/CONCRETE FINISHER (MUSKOGEE COUNTY) | 14.24 | — | 14.24 |
| CEMENT MASON/CONCRETE FINISHER (DELAWARE COUNTY) | 13.27 | — | 13.27 |
| CARPENTER, EXCLUDES FORM WORK AND FORM SETTING (REMAINING COUNTIES) | 13.94 | — | 13.94 |
| CARPENTER, EXCLUDES FORM WORK AND FORM SETTING (MUSKOGEE COUNTY) | 13.48 | — | 13.48 |
| CARPENTER, EXCLUDES FORM WORK AND FORM SETTING (DELAWARE COUNTY) | 13.69 | — | 13.69 |
| CARPENTER, EXCLUDES FORM WORK AND FORM SETTING (CHEROKEE COUNTY) | 14.00 | — | 14.00 |
| CARPENTER, EXCLUDES FORM WORK AND FORM SETTING (ADAIR COUNTY) | 13.70 | — | 13.70 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | 51.00 | 23.80 | 74.80 |
| POWER EQUIPMENT OPERATOR: GROUP 9 PUMPS | 28.25 | 19.05 | 47.30 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT;TRACTOR | 28.77 | 19.05 | 47.82 |
| POWER EQUIPMENT OPERATOR: GROUP 6 ROTARY DRILLING MACHINE WHEN OPERATED FROM CONSOLE | 30.87 | 19.05 | 49.92 |
| POWER EQUIPMENT OPERATOR: GROUP 5 BOBCAT/SKID STEER/SKID LOADER | 32.71 | 19.05 | 51.76 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE; MECHANIC; BACKHOE; TRACKHOE; GRADER/BLADE; POWER DRIVEN HOLE DIGGER WITH LESS THAN 30' MAST AND BULLDOZER | 34.07 | 19.05 | 53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | 35.40 | 19.05 | 54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | 36.14 | 19.05 | 55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER | 27.25 | 19.05 | 46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | 38.09 | 19.05 | 57.14 |
| IRONWORKER, STRUCTURAL | 30.35 | 16.83 | 47.18 |
| OPERATOR: SCRAPER | 14.00 | — | 14.00 |
| LABORER: PIPELAYER | 13.29 | — | 13.29 |
| LABORER: COMMON OR GENERAL | 12.41 | — | 12.41 |
| CARPENTER (FORM WORK ONLY) | 14.00 | — | 14.00 |
| TRUCK DRIVER ((3) FLATBED TRUCK) | 30.85 | 16.65 | 47.50 |