| ASBESTOS WORKER/HEAT & FROST INSULATOR | 43.88 | 26.93 | 70.81 |
| BRICKLAYER | 36.53 | 24.03 | 60.56 |
| BRICK POINTER/CAULKER/CLEANER | 36.53 | 24.03 | 60.56 |
| TILE SETTER | 36.53 | 24.03 | 60.56 |
| TILE FINISHER | 30.78 | 23.04 | 53.82 |
| CARPENTER (EXCLUDING DRYWALL HANGING AND METAL STUD INSTALLATION, SOFT FLOOR LAYING, AND FORM WORK) | 34.42 | 26.53 | 60.95 |
| SOFT FLOOR LAYER | 37.52 | 23.50 | 61.02 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | 37.52 | 23.50 | 61.02 |
| PILEDRIVERMAN | 36.34 | 27.50 | 63.84 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) FOOTNOTES; A. 6 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; JULY 4TH; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY B. 1 WEEK'S PAID VACATION FOR 1 YEAR'S SERVICE; 2 WEEKS' PAID VACATION FOR 2 OR MORE YEARS' SERVICE | 33.05 | 14.91 | 47.96 |
| ELECTRICIAN: INCLUDING HVAC/TEMPERATURE CONTROLS AND ALARM INSTALLATION FOOTNOTES; A. 6 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; JULY 4TH; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY B 1 WEEK'S PAID VACATION FOR 1 YEAR'S SERVICE; 2 WEEKS' PAID VACATION FOR 2 OR MORE YEARS' SERVICE | 46.63 | 24.92 | 71.55 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS/HVAC TEMPERATURE CONTROLS) | 42.95 | 18.81 | 61.76 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | 63.79 | 38.44 | 102.23 |
| POWER EQUIPMENT OPERATOR: CRANE | 46.71 | 16.41 | 63.12 |
| POWER EQUIPMENT OPERATOR (OILER) | 36.93 | 16.41 | 53.34 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | 32.42 | 19.66 | 52.08 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | 28.87 | 19.66 | 48.53 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | 32.92 | 19.66 | 52.58 |
| IRONWORKER (ORNAMENTAL, REINFORCING, & STRUCTURAL) | 36.83 | 29.01 | 65.84 |
| LABORER (MASON TENDER - BRICK & CEMENT/CONCRETE) | 31.89 | 22.66 | 54.55 |
| LABORER: COMMON OR GENERAL | 32.35 | 16.42 | 48.77 |
| LABORER: PIPELAYER | 31.27 | 10.90 | 42.17 |
| GLAZIER | 34.82 | 20.80 | 55.62 |
| PAINTER: BRUSH AND ROLLER | 32.35 | 19.45 | 51.80 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | 35.45 | 20.20 | 55.65 |
| PLASTERER (INCLUDING FLOOR LAYER: FLOOR COATING/EPOXY) | 29.51 | 15.67 | 45.18 |
| CEMENT MASON/CONCRETE FINISHER | 35.73 | 24.65 | 60.38 |
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | 44.86 | 30.03 | 74.89 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 49.17 | 28.55 | 77.72 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | 49.17 | 28.55 | 77.72 |
| ROOFER | 29.07 | 19.84 | 48.91 |
| SHEET METAL WORKER (HVAC DUCT AND UNIT INSTALLATION ONLY) | 43.06 | 30.11 | 73.17 |
| TRUCK DRIVER: DUMP (ALL TYPES) | 24.32 | 11.73 | 36.05 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | 26.88 | 15.95 | 42.83 |
| PAINTER: SPRAY | 22.78 | 12.40 | 35.18 |
| OPERATOR: ROLLER | 31.48 | 12.80 | 44.28 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 31.48 | 12.80 | 44.28 |
| OPERATOR: LOADER | 29.66 | 12.61 | 42.27 |
| OPERATOR: BULLDOZER | 21.15 | 8.72 | 29.87 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 32.88 | 12.26 | 45.14 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 30.95 | 10.20 | 41.15 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 24.53 | 14.55 | 39.08 |
| CARPENTER (FORM WORK ONLY) | 31.87 | 12.74 | 44.61 |