Davis-Bacon rates — Ulster County, New York

Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.

Pick the construction type that matches your contract, not the highest rate. Building, Residential, Highway and Heavy are separate determinations with different rates, and using the wrong one is a common reason a certified payroll comes back rejected. Where your trade appears under several classifications the choice between them is a judgement call — the plainest match is usually right, and the contracting officer can confirm it.
BuildingHeavyHighway
NY20260007 rev 2 · 05/18/2026 · 140 classifications
ClassificationBase rateFringeTotal
INSULATOR/ASBESTOS WORKER: (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) (SULLIVAN AND ULSTER COUNTIES)41.7427.5869.32
HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS (SULLIVAN AND ULSTER COUNTIES)41.7427.5869.32
INSULATOR/ASBESTOS WORKER: (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) (DUTCHESS AND ORANGE COUNTIES)46.6249.3095.92
HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS; WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANCIAL SYSTEMS (DUTCHESS AND ORANGE COUNTIES)46.6249.3095.92
BOILERMAKER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE68.8849.83118.71
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, HIGHWAY CONSTRUCTION (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO), SULLIVAN AND ULSTER COUNTIES)46.4537.5083.95
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, HEAVY CONSTRUCTION (ORANGE COUNTY (TOWN OF TUXEDO))47.4438.0085.44
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, HEAVY CONSTRUCTION (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES).$ 46.45 37.50 BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, BUILDING CONSTRUCTION (ORANGE COUNTY (TOWN OF TUXEDO))47.4438.0085.44
CARPENTERS:: CARPENTERS, MILLWRIGHTS, PILE DRIVERS (HEAVY & HIGHWAY CONSTRUCTION)44.7231.2375.95
CARPENTERS:: CARPENTERS, MILLWRIGHTS, PILE DRIVERS (BUILDING CONSTRUCTION)44.7231.2375.95
MILLWRIGHT (DUTCHESS AND ORANGE COUNTIES)47.8343.0390.86
DOCK BUILDER & PILEDRIVERMEN (DUTCHESS AND ORANGE COUNTIES)60.5955.84116.43
DIVER TENDER (DUTCHESS AND ORANGE COUNTIES)55.0055.84110.84
DIVER (DUTCHESS AND ORANGE COUNTIES)75.4655.84131.30
ELECTRICIAN (ORANGE AND DUTCHESS (TOWNSHIPS OF FISHKILL, EAST FISHKILL AND BEACON) COUNTIES) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY51.5042.2293.72
ELECTRICIAN (DUTCHESS (REMAINING TOWNSHIPS), ULSTER AND SULLIVAN COUNTIES). FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY51.5042.2293.72
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: MECHANIC. PAID HOLIDAYS: A MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY43.3530.7374.08
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: LINEMAN AND TECHNICIAN. PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY54.1935.6989.88
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT). PAID HOLIDAYS: A MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY43.3530.7374.08
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN (TRUCK DRIVER). PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY43.3530.7374.08
AFTER THE HOLIDAY48.7731.3180.08
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: FLAGMAN. PAID HOLIDAYS: A MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY32.5129.9362.44
fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins61.5636.2197.77
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)61.5636.2197.77
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab55.4031.7887.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)55.4031.7887.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)55.4031.7887.18
fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)35.3430.1265.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)35.3430.1265.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)35.3430.1265.46
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)64.5942.92107.51
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)63.1433.8296.96
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY49.2531.1580.40
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY49.2531.1580.40
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY61.5636.2197.77
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS MECHANIC (SULLIVAN COUNTY). FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY49.2531.1580.40
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN (SULLIVAN COUNTY). FOOTNOTE A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY61.5636.2197.77
THE HOLIDAY49.2531.1580.40
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY49.2531.1580.40
THE HOLIDAY55.4031.7887.18
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS FLAGMAN (SULLIVAN COUNTY). FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY35.3430.1265.46
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY38.736.9345.66
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY20.536.3926.92
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY40.816.9947.80
ELEVATOR MECHANIC FOOTNOTE: A.VACATION 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY76.1238.98115.10
POWER EQUIPMENT OPERATOR GROUP 6 (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION)49.2631.3280.58
POWER EQUIPMENT OPERATOR GROUP 5B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION)47.0031.3278.32
POWER EQUIPMENT OPERATOR GROUP 5A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION)61.9531.3293.27
POWER EQUIPMENT OPERATOR GROUP 5 (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION)49.5331.3280.85
POWER EQUIPMENT OPERATOR GROUP 4B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION)45.9431.3277.26
POWER EQUIPMENT OPERATOR GROUP 4A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION)54.3331.3285.65
POWER EQUIPMENT OPERATOR GROUP 3B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION)52.2531.3283.57
POWER EQUIPMENT OPERATOR GROUP 3A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION)54.8831.3286.20
POWER EQUIPMENT OPERATOR GROUP 2A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION)56.9731.3288.29
POWER EQUIPMENT OPERATOR GROUP 1B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION)54.4131.3285.73
POWER EQUIPMENT OPERATOR GROUP 1A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION)59.0431.3290.36
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5OILER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY64.0235.2599.27
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY59.1935.2594.44
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE (POUGHKEEPSIE AND SOUTH THEREOF) NOTES LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY70.4135.25105.66
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-3 ENGINEER-- PILE DRIVER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY75.1335.25110.38
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MANUFACTURER AND REGARDLESS OF HOW THE SAME IS RIGGED (EXCEPT FOR PILE RIGS). (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY77.8235.25113.07
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-1 MASTER MECHANIC (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY64.0235.2599.27
4-B OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMPS - PUMP STATION-WATER-SEWER- GYPSUM- PLASTER, ETC.; ROLLER-MOTORIZED (WALK-BEHIND); WELDING MACHINE (STEEL ERECTION EXCAVATION); WELL POINT SYSTEM; BENDING MACHINE; DUST COLLECTOR; MIXER - CONCRETE UNDER 21-E; HEATER ALL TYPES; STEAM JENNY; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; VIBRATOR (1 TO 5); COMPRESSOR TRUCK MOUNTED (2-6) (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY44.1935.2579.44
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4-A SERVICE MEN (FUEL OR GREASE TRUCK) (POUGHKEEPSIE AND SOUTH THEREOF) NOTES LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY51.5735.2586.82
MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES), MAINTENANCE ENGINEER; MACHINE PULLING SHEEPS FOOT ROLLER; MATERIAL HOPPER; MIXER CONCRETE - 21-E AND OVER; MULCHING GRASS SPREADER; PORTABLE ASPHALT PLANT, PORTABLE BATCH PLANT, PORTABLE CRUSHER; POWERHOUSE PLANT; QUARRY MASTER; ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; STEEL CUTTING MACHINE; STONE CRUSHER; SWEEPER; TURBOJET BURNER OR SIMILAR; WELL DRILLING MACHINE ; WINCH TRUCK ""A"" FRAME. JOHN HENRY DRILL OR SIMILAR (POUGHKEEPSIE AND SOUTH THEREOF) NOTES LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY56.8135.2592.06
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2-B MECHANIC (OUTSIDE) ALL TYPES (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY59.6735.2594.92
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2-A BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRUCK; SWITCH TAMPERS; VIBRATORY ROLLER, ETC (POUGHKEEPSIE AND SOUTH THEREOF) NOTES LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY57.8435.2593.09
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1-B ROAD PAVER, ASPHALT (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY63.7035.2598.95
SKIDDER; MOVABLE CONCRETE BARRIER TRANSFER & TRANSPORT VEHICLE; MUCKING MACHINES; OVERHEAD CRANE; PAVER (CONCCRETE); PULSEMETER; PUSH BUTTON (BUZZ BOX) ELEVATOR; ROAD MIX MACHINES; ROBOT HAMMER (BROCK OR SIMILAR), ROSS CARRIER AND SIMILAR MACHINES; SHOVELS (TUNNELS); SIDE BOOM; SLIP FORM MACHINE; SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YARDS; TRENCHING MACHINES; TELEPHIES- VERMEER CONCRETE SAW TRENCHER AND/OR SIMILAR; TRACTOR-TYPE DEMOLITION EQUIPMENT, WHIRLY (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) 50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY60.4235.2595.67
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1 BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE (POUGHKEEPSIE AND SOUTH THEREOF) NOTES LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY68.6335.25103.88
HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE. FOOTNOTE: A. PAID HOLIDAY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY51.0133.2084.21
TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOSTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER. (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) BUILDING CONSTRUCTION) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE. FOOTNOTE: A. PAID HOLIDAY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY53.9133.2087.11
POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) GROUP A(1): CRANE PREMIUMS 1 OVER 150' :ADD $1.00 2 OVER 200': ADD $2.00 BUILDING CONSTRUCTION NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)55.4233.2088.62
POWER EQUIPMENT OPERATORS: GROUP A SHOVEL, ALL EXCAVATOR (EXCEPT TRACTOR MOUNTED RUBBER TIRED JOHN DEERE 510 OR SMALLER), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND UNDER). (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) BUILDING CONSTRUCTION) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE. FOOTNOTE: A. PAID HOLIDAY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY54.9333.2088.13
POWER EQUIPMENT OPERATOR GROUP 7 (HEAVY & HIGHWAY) MASTER MECHANIC (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY58.9133.5592.46
POWER EQUIPMENT OPERATOR GROUP 6 (HEAVY & HIGHWAY) CRANES 49 TONS AND BELOW (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY60.3033.5593.85
POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY & HIGHWAY) CRANES 50 TONS AND OVER (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY61.8033.5595.35
POWER EQUIPMENT OPERATOR GROUP 4 (HEAVY & HIGHWAY) TOWER CRANES (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY63.3033.5596.85
RIDE-ON BOILER (USED IN CONJUNCTION WITH PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, BOAT (POWERED), CEMENT AND BIN OPERATOR, COMPRESSORS, DUST COLLECTORS, FORK LIFT, GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF EQUIPMENT), CONCRETE PAVEMENT SPREADER AND FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER), CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND, DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE), DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR, RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER, RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL POINT (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY53.8233.5587.37
POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY56.3933.5589.94
POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY & HIGHWAY)57.3033.5590.85
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 161.7237.5099.22
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 6 HELICOPTER PILOT (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM .50 A PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS63.5437.50101.04
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 5 OILER (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM .50 A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS61.7237.5099.22
AND MAINTENCE OF); SPRINKLER AND WATER PUMP TRUCKS (USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); STEAM JENNIES AND BOILERS, IRRESPECTIVE OF USE; STONE SPREADER; TAMPING MACHINES, VIBRATING RIDE ON; TEMPORARY HEATING PLANT (NELSON OR OTHER TYPE, INCLUDING PROPANE, NATURAL GAS OR FLOW TYPE UNITS); WATER AND SPRINKLER TRUCKS (USED ON JOB SITE IN CONDUCTION WITH JOB SITE); WELDING MACHINES-WITHIN 100 FT (GAS, AND /OR ELECTRIC CONVERTERS OF ANY TYPE, SINGLE, TOW OR THREE IN A BATTERY). WELDING SYSTEM, MULTIPLE (RECTIFIER TRANSFORMER TYPE) WELL POINT SYSTEMS (INCLUDING INSTALLATION BY BULL GANG AND MAINTENANCE OF); OFF ROAD BACK DUMPS. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM 50 A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS56.5937.5094.09
PUMP (REGARDLESS OF SIZE); POST HOLE DIGGER (POST POUNDER AND AUGER); ROD BENDING MACHINES (POWER); ROLLER, BLACK TOP; SCALES, (POWER); SEAMAN PULVERIZING MIXER; SHOULDER WIDENER; SILOS; SKIMMER MACHINES (BOOM TYPE); STEEL CUTTING MACHINE, SERVICES AND MAINTAINS; TAMROCK DRILL; TRACTORS; TUG CAPTAIN; VIBRATING PLANTS (USED IN CONDUCTION WITH UNLOADING); WELDER AND REPAIR MACHINES CONCRETE CLEANING/DECONTAMINATION MACHINE OPERATOR; DIRECTIONAL BORING MACHINE; HEAVY EQUIPMENT ROBOTICS OPERATOR; MASTER ENVIRONMENTAL MAINTENANCE OPERATOR; ULTRA HIGH PRESSURE WATERJET CUTTING TOOL SYSTEM OPERATOR; MAINTENANCE OPERATOR; VACUUM BLASTING MACHINE OPERATOR (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM .50 A PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS58.2237.5095.72
CONCRETE, BRICK SHAFT, CAISSON, SNORKEL ROOF, AND OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE) LONG BOOM RATE TO BE APPLIED IF HOIST IS ""OUTSIDE MATERIAL LOWER HOIST""; HYDRAULIC CRANES-10TONS AND UNDER; HYDRO-AXE; HYDRO-BLASTER; JACKET (SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE: NOT HAND JACK OR PILE LOAD TEST TYPE), LOG SKIDDER; PANS, PAVERS (ALL) CONCRETE; PLATE AND FRAME FILTER PRESS; PUMPCRETE MACHINES; SQUEEZE CRETE AND CONCRETE PUMPING (REGARDLESS OF SIZE); SCRAPERS; SIDEBOOMS; STRADDLE CARRIER, ROSS AND SIMILAR TYPES; VACUUM TRUCK; WHIP HAMMER; WINCH TRUCKS (HOISTING). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM .50 A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS60.1337.5097.63
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUPGROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR AND MAINTENANCE (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM 75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS53.3437.5090.84
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 6: HELICOPTER PILOT (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS64.2837.50101.78
AND MAINTENANCE); FRAM TRACTORS. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM 75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS57.0637.5094.56
(UNDER 2 YDS); GENERATORS; GIRAFFE GRINDERS; GRADERS AND MOTOR PATROLS; MACHNIC; PIPE BENDING MACHINE (POWER);TRACTORS; WATER AND SPRINKLER TRUCKS USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); WELDER AND REPAIR MECHANIC; CAPTAIN (POWER BOATS); TUG MASTER (POWER BOATS). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS58.5637.5096.06
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 2: ""A"" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, VERMEER OR SIMILAR TYPE; FORKLIFTS; FRONT END LOADERS 92 YDS. AND OVER BUT LESS THAN 5 YDS.); GRADERS, FINISH (FINE); HYDRAULIC CRANES 10 TONS AND UNDER (OVER 10 TONS) CRANES RATE APPLIES); SIDE BOOMS: WINCH TRUCKS (HOISTING). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS60.7037.5098.20
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), HELICOPTERS (COMMUNICATION ENGINEER); SCOOPER (LOADER AND SHOVEL) KOEHRING; TRENCH MACHINES (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS62.3537.5099.85
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 5: OILER (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Tunnel Premium 75 Hazmat Premium 20% Hydrographic Premium .50 FOOTNOTE A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS54.0737.5091.57
TANK ERECTION GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPMENT AND SOURCES OF POWER FROM A PERMANENT PLANT: IE STAEM, COMGRESSED AIR, HYDRAULIC OR OTHER POWER, FOR THE OPERATING OF ANY MACHINE OR AUTOMATIC TOOLS, USED IN THE ERECTION, ALTERATION, REPAIR AND DISMANTLING OF TANKS AND ANY AND ALL ""DUAL PURPOSE"" TRUCKS USED ON THE CONSTRUCTION JOB SITE, OR IN THE LOADING AND UNLOADING OF MATERIALS, AT THE CONSTRUCTION JOB SITED OR IN CONJUCTION WITH THE JOB SITE. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Tunnel Premium .75 Hazmat Premium 20% Hydrographic Premium .50 FOOTNOTE A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS61.2837.5098.78
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 3: HELICOPTER PILOT ENGINEER (ORANGE, ULSTER AND SULLIVAN COUNTIES NOTES Tunnel Premium .75 Hazmat Premium 20% Hydrographic Premium 50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS64.8537.50102.35
OCCURS68.3737.50105.87
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Tunnel Premium 75 Hazmat Premium 20% Hydrographic Premium .50 FOOTNOTE A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS69.9637.50107.46
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 7 HELICOPTER PILOT (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium 75 FOOTNOTE: a. PAID HOLIDAYS New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the calendar week during which the holiday occurs65.7437.50103.24
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 6 OILER (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium 75 FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the calendar week during which the holiday occurs53.3437.5090.84
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFIER TRANSFORMER TYPE); GENERATOR, SINGLE (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium 75 FOOTNOTE: a. PAID HOLIDAYS New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the calendar week during which the holiday occurs57.1037.5094.60
BOATS: TUG MASTER: POWER BOATS. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium 75 FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the calendar week during which the holiday occurs58.6337.5096.13
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 3 ""A"" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE; JACKS: SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE (NOT HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOMS (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium .75 FOOTNOTE: a PAID HOLIDAYS: New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the calendar week during which the holiday occurs61.2937.5098.79
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium .75 FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the calendar week during which the holiday occurs68.5837.50106.08
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 1 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium .75 FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the calendar week during which the holiday occurs70.2437.50107.74
IRONWORKER A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY42.6353.7096.33
LABORER: DUTCHESS COUNTY (Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work): (BUILDING CONSTRUCTION) GROUP 2 LABORERS BUILDING CLASSIFICATIONS GROUP 1: Custodial work, flag person, portable generator tender, portable pump tender, pitman and dumpman, firewatch, temporary heat tender, temporary light tender, traffic control, tool room tender; Artificial turf, air chipping hammer acoustic pump and mixer, carpenter tender, concrete, concrete curb and side46.2029.7575.95
LABORER: DUTCHESS COUNTY (Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work): (BUILDING CONSTRUCTION) GROUP 1 LABORERS BUILDING CLASSIFICATIONS GROUP 1: Custodial work, flag person, portable generator tender, portable pump tender, pitman and dumpman, firewatch, temporary heat tender, temporary light tender, traffic control, tool room tender; Artificial turf, air chipping hammer acoustic pump and mixer, carpenter tender, concrete, concrete curb and side45.4029.7575.15
LABORERS: GROUP 3 (BUILDING CONSTRUCTION) BLASTERS, LASER BEAM OPERATOR. (DUTCHESS COUNTY)43.4532.9076.35
LABORERS: GROUP 2 (BUILDING CONSTRUCTION)42.2232.9075.12
LABORERS: GROUP 1 (BUILDING CONSTRUCTION) MASON TENDERS, CARPENTER TENDERS, LABORER STRIPPING AND CLEANING FORMS, LABORER GRADING AND DIGGING DITCHES, SWEEPERS, CLEANERS. (DUTCHESS COUNTY)41.1032.9074.00
LABORERS: HEAVY & HIGHWAY GROUP 3 ASPHALT RAKER, ASPHLAT SCREEMAN, DRILLERS (ALL), LASER BEAM OPERATOR, FORM SETTER/ALIGNERS, BLASTERS (DUTCHESS COUNTY) FOOTNOTE: A. PAID HOLIDAYS NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, GOOD FRIDAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, THANKSGIVING DAY AND CHRISTMAS DAY AND VETERAN'S DAY43.9027.8071.70
LABORERS: HEAVY & HIGHWAY GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN, SIGNAL MAN, PIPELAYER, RIP RAP, DRY STONE LAYER, JACKHAMMER, POWDERMAN, HIGHSCALERS, POWER BUGGY OPERATOR, STEEL ROD CARRIER, VIBRATORY OPERATOR, OTHER MACHINE OPERATOR, WRECKING, VIBRATOR OPERATOR-COMPACTOR, GUNITE AND SAND BLASTING, WATER PUMP 2"" OR UNDER, NIPPER, CHUCKER, ASPHALT WORKERS. (DUTCHESS COUNTY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, GOOD FRIDAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, THANKSGIVING DAY AND CHRISTMAS DAY AND VETERAN'S DAY42.8027.8070.60
LABORERS: HEAVY & HIGHWAY GROUP 1 FLAGPERSON, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHT, SIGNS, BARRICADES, TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS, TOOL ROOMS. (DUTCHESS COUNTY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, GOOD FRIDAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, THANKSGIVING DAY AND CHRISTMAS DAY AND VETERAN'S DAY36.4527.8064.25
GLAZIER (DUTCHESS, ORANGE, SULLIVAN AND ULSTER COUNTIES)49.2057.20106.40
PAINTERS: (SPRAY RATE)36.9424.6661.60
PAINTERS: (PAINTER/PAPERHANGER)35.9424.6660.60
PAINTERS: (LEAD ABATEMENT WORK)35.9424.6660.60
PAINTERS: (DRYWALL FINISHERS)35.9424.6660.60
PAINTER: STRUCTURAL STEEL AND BRIDGE (DUTCHESS, ORANGE, SULLIVAN AND ULSTER COUNTIES)56.2555.14111.39
PLUMBER/PIPEFITTER (ZONE 2 DUTCHESS COUNTY AND THE REMAINDER OF ULSTER COUNTY)60.6645.35106.01
REFRIGERATION MECHANIC (ORANGE COUNTY TOWNS OF LAKEVILLE, FOUR CORNERS, STERLING FOREST, TUXEDO PARK, SOUTHFIELDS, ARDEN, NEWBURGH JUNCTION, GREENWOOD LAKE, MONROE, HARRIMAN, WOODBURY FALLS, WOODBURY, WOODBURY STATION, CENTRAL VALLEY, AND THE PALISADES INTERSTATE PARK AND BEAR MOUNTAIN PARK)41.9937.3879.37
PLUMBER; STEAMFITTER (ORANGE COUNTY TOWNS OF LAKEVILLE, FOUR CORNERS, STERLING FOREST, TUXEDO PARK, SOUTHFIELDS, ARDEN, NEWBURGH JUNCTION, GREENWOOD LAKE, MONROE, HARRIMAN, WOODBURY FALLS, WOODBURY, WOODBURY STATION, CENTRAL VALLEY, AND THE PALISADES INTERSTATE PARK AND BEAR MOUNTAIN PARK)53.2046.5799.77
PLUMBER; STEAMFITTER (SULLIVAN COUNTY (TOWNSHIPS OF LUMBERLAND, FORESTBURGH, HIGHLAND, TUSTEN, MAMAKATING, FALLSBURGH, THOMPSON, BETHEL, COCHECTON, DELAWARE, FREEMONT, CALLICOON, LIBERTY, MONTICELLO, NEVERSINK AND ROCKLAND); ORANGE COUNTY (REMAINING TOWNSHIPS) AND ULSTER COUNTY (TOWNS OF SHAWANGURK, WAWARSING, PLATTEKILL, MARLBORO AND ELLENVILLE UP TO NAPANOCH PRISON))53.2046.5799.77
ROOFER50.2532.6282.87
SPRINKLER FITTER57.2032.6689.86
SHEET METAL WORKER55.2947.43102.72
DURING WHICH THE HOLIDAYS OCCURS36.9046.3783.27
DURING WHICH THE HOLIDAYS OCCURS37.0246.3783.39
OCCURS37.1346.3783.50
TRUCK DRIVERS: GROUP 2 DRIVERS ON ALL EQUIPMENT 25 YARDS AND OVER, UP TO AND INCLUDING 30 YARD BODIES AND CABLE DUMP TRAILERS AND POWDER AND DYNAMITE TRUCKS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS37.3546.3783.72
DURING WHICH THE HOLIDAYS OCCURS39.0346.3785.40
TRUCK DRIVERS: GROUP 1 DRIVERS ON LETOURNEAU TRACTORS, DOUBLE BARREL EUCLIDS, ATHEY WAGONS AND SIMILAR EQUIPMENT (EXCEPT WHEN HOOKED TO SCRAPERS), I-BEAM AND POLE TRAILERS, DRIVERS OF ROAD OIL DISTRIBUTORS, TIRE TRUCKS AND TRACTORS AND TRAILERS WITH 5 AXLES AND OVER, ARTICULATED BACK DUMPS AND ARTICULATED WATER TRUCKS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS37.9146.3784.28
Residential
NY20260094 rev 1 · 05/18/2026 · 15 classifications
ClassificationBase rateFringeTotal
BRICKLAYER25.3812.0237.40
CARPENTER29.1020.3649.46
IRONWORKER, STRUCTURAL35.7530.8066.55
IRONWORKER, ORNAMENTAL A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY42.6353.7096.33
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)37.4924.6762.16
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 23.50 7.30 ROOFER16.66—16.66
PLUMBER25.4411.2036.64
PAINTER (BRUSH AND ROLLER)23.0916.3939.48
OPERATOR: LOADER27.8821.4049.28
OPERATOR: BULLDOZER21.20—21.20
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE29.7615.8945.65
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON TENDING AND CEMENT MASON TENDING22.3010.3932.69
IRONWORKER, REINFORCING27.0623.0250.08
ELECTRICIAN24.4211.0635.48
CEMENT MASON/CONCRETE FINISHER27.5911.4539.04
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.