Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

Davis-Bacon rates — Herkimer County, New York

Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.

Pick the construction type that matches your contract, not the highest rate. Building, Residential, Highway and Heavy are separate determinations with different rates, and using the wrong one is a common reason a certified payroll comes back rejected. Where your trade appears under several classifications the choice between them is a judgement call — the plainest match is usually right, and the contracting officer can confirm it.
BuildingHeavyHighway
NY20260031 rev 2 · 05/18/2026 · 82 classifications
ClassificationBase rateFringeTotal
HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEM)38.5025.0463.54
ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS ALSO THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT.)43.2527.2970.54
BOILERMAKER43.3427.6671.00
BRICKLAYERS & STONE MASONS, CEMENT MASONS, PLASTERERS, POINTERS, CLEANERS & CAULKERS BUILDING CONSTRUCTION (UTICA CHAPTER)39.2422.0261.26
BRICKLAYER, MARBLE, TILE & TERRAZZO FINISHERS (UTICA CHAPTER) BUILDING CONSTRUCTION28.5219.5948.11
BRICKLAYER, MARBLE, TILE & TERRAZZO WORKERS (UTICA CHAPTER) BUILDING CONSTRUCTION35.8520.3756.22
CEMENT MASON/CONCRETE FINISHER, HEAVY/HIGHWAY CONSTRUCION (UTICA CHAPTER) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, AND THANKSGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED ONE DAY BEFORE AND ONE DAY AFTER THE HOLIDAY)37.2319.5156.74
CARPENTER: PILEDRIVER (BUILDING CONSTRUCTION)30.8521.3252.17
CARPENTER: CARPENTERS, MILLWRIGHTS (BUILDING CONSTRUCTION)30.8521.3252.17
CARPENTER (HEAVY & HIGHWAY CONSTRUCTION)44.5227.1671.68
ELECTRICIAN50.5035.0385.53
CABLE SPLICER55.5535.0390.58
THE HOLIDAY42.2930.6672.95
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY52.8635.6088.46
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY47.5731.0378.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY42.2930.6672.95
THE HOLIDAY31.7229.8761.59
fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins61.5636.2197.77
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)61.5636.2197.77
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab55.4031.7887.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)55.4031.7887.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)55.4031.7887.18
fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)35.3430.1265.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)35.3430.1265.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)35.3430.1265.46
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)64.5942.92107.51
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)63.1433.8296.96
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY49.2531.1580.40
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY49.2531.1580.40
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY61.5636.2197.77
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY38.736.9345.66
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY20.536.3926.92
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY40.816.9947.80
ELEVATOR CONSTRUCTOR FOOTNOTE: A.VACATION 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY57.7338.4496.17
POWER EQUIPMENT OPERATORS:, BUILDING: GROUP C (HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS)) FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR, WELDING MACHINE, WELL POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE PUMP 4"" AND OVER, MURPHY TYPE DIESEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELCRETE POWER PACK (BELCRETE SYSTEM), SEEDING, AND MULCHING MACHINES, PUMPS FOOTNOTE: A. PAID HOLIDAYS NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY51.0133.2084.21
POWER EQUIPMENT OPERATORS:, BUILDING: GROUP B (HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS)) BACKHOE, (TRACTOR MOUNTED RUBBER TIRED EQUIVALENT TO JOHN DEERE 510 OR LESS), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOSTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER53.9133.2087.11
POWER EQUIPMENT OPERATORS:, BUILDING: GROUP A (HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS)) SHOVEL, ALL BACKHOE (EXCEPT TRACTOR MOUNTED RUBBER TIRED JOHN DEERE 510 OR SMALLER), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT AND TRACTOR ROAD PAVER54.9333.2088.13
POWER EQUIPMENT OPERATORS: BUILDING: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE. HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) GROUP A(1): CRANE PREMIUMS 1 OVER 150' :ADD $1.00 2 OVER 200' : ADD $2.0055.4233.2088.62
POWER EQUIPMENT OPERATORS: BUILDING GROUP 4 MASTER MECHANIC HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) PREMIUMS: HAZMAT WORK 2.50 QUAD 9 BULLDOZER OR MULTIBOWL SCRAPER .50 FOOTNOTE: A PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED FIVE CONSECUTIVE WORKING DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY57.0132.4589.46
ELECTRIC SUBMERSIBLE PUMP (4"" AND OVER), FARM TRACTOR WITH OR WITHOUT ACCESSORIES, FINE GRADE MACHINE (NOT AUTOMATED), FIREMAN, FORM TAMPER, GENERATOR (2,500 WATTS AND OVER), HYDRAULIC PUMP, MECHANICAL HEATERS (MORE THAN 2 WHOSW COMBINED OUTPUT EXCEEDS 640,000 BTU PER HOUR (MANUFACTURER'S RATING) PLUS ONE SELF CONTAINED HEATING UNIT (SUNDOG, AIR HEAT TYPE, NEW HOLLAND HAY DRYER TYPE EXCLUDED), POWER HEATERMAN (HAY DRYER), PUMPS (WATER AND TRASH), REVINUS WIDENER (ROAD WIDENER), SINGLE LIGHT PLANT, STEAM CLEANER OR JENNY, TRACTOR WITH OR WITHOUT TOWED ACCESSORIES HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) PREMIUMS: HAZMAT WORK 2.50 QUAD 9 BULLDOZER OR MULTIBOWL SCRAPER 50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED FIVE CONSECUTIVE WORKING DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY51.4232.4583.87
FOR STABILIZED BASE (SELF PROPELLED SEAMAN MIXER), MONRAIL MACHINE, PARAPET CONCRETE OR PAVEMENT GRINDER, PARTS MAN, POST HOLE DIGGER (TRUCK OR TRACTOR MOUNTED), POWER SWEEPER (WAYNE OR SIMILAR), GROUT PUMP, PUMP- CRETE OR SQEEZE-CRETE, ROAD WIDENER (FRONT END OF GRADER OR SELF PROP.), ROLLER, SELF CONTAINED HYDRAULIC BENCH DRILL, SHELL WINDER (MOTORIZED), SNORKEL (OVERHEAD ARMS), SNOWBLOWER CONTROL MAN, TRENCHING MACHINE (DIGGING CAPACITY OF 4 FT OR LESS), TUGGER HOIST, VIBROTAMP, WELL DRILL, WELL POINT SYSTEM, WINCH (MOTOR DRIVEN), WINCH CAT, WINCH TRUCK HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) PREMIUMS: HAZMAT WORK 2.50 QUAD 9 BULLDOZER OR MULTIBOWL SCRAPER 50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED FIVE CONSECUTIVE WORKING DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY53.9932.4586.44
LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) PREMIUMS: HAZMAT WORK 2.50 QUAD 9 BULLDOZER OR MULTIBOWL SCRAPER .50 CRANE PREMIUMS (ADD TO GROUP 1 RATE): ALL LATTIC BOOM CRANES (65 TON CAPACITY AND OVER) GROUP 1 RATE PLUS 1.25 ALL HYDRAULIC CRANES (100 TON CAPACITY AND OVER) GROUP 1 RATE PLUS 1.75 ALL HYDRAULIC CRANES (80 TON CAPACITY TO 99 TON CAPACITY) GROUP 1 RATE PLUS 1.25 ALL HYDRAULIC CRANES (65 TON CAPACITY TO 79 TON CAPACITY) GROUP 1 RATE PLUS 1.10 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED FIVE CONSECUTIVE WORKING DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY54.9032.4587.35
POWER EQUIPMENT OPERATORS: GROUP 7 (HEAVY & HIGHWAY) MASTER MECHANIC HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOTNOTE: A PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY58.9133.5592.46
POWER EQUIPMENT OPERATORS: GROUP 6 (HEAVY & HIGHWAY) CRANES 49 TONS AND BELOW HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY60.3033.5593.85
POWER EQUIPMENT OPERATORS: GROUP 5 (HEAVY & HIGHWAY) CRANES 50 TONS AND OVER HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY61.8033.5595.35
POWER EQUIPMENT OPERATORS: GROUP 4 (HEAVY & HIGHWAY) TOWER CRANES HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOTNOTE: A PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY63.3033.5596.85
RIDE-ON BOILER (USED IN CONJUNCTION WITH PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, BOAT (POWERED), CEMENT AND BIN OPERATOR, COMPRESSORS, DUST COLLECTORS, FORK LIFT, GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF EQUIPMENT), CONCRETE PAVEMENT SPREADER AND FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER), CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND, DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE), DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR, RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER, RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL POINT HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY53.8233.5587.37
TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY56.3933.5589.94
OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY57.3033.5590.85
POWER EQUIPMENT OPERATORS: GROUP 7 (HEAVY AND HIGHWAY) MASTER MECHANIC HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOTNOTE: A PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY57.0132.4589.46
POWER EQUIPMENT OPERATORS: GROUP 6 (HEAVY AND HIGHWAY) CRANES 49 TONS AND BELOW HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY57.9032.4590.35
POWER EQUIPMENT OPERATORS: GROUP 5 (HEAVY AND HIGHWAY) CRANES 50 TONS AND OVER HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY59.4032.4591.85
POWER EQUIPMENT OPERATORS: GROUP 4 (HEAVY AND HIGHWAY) TOWER CRANES HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOTNOTE: A PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY60.9032.4593.35
THE WORKING DAY AFTER THE HOLIDAY51.4232.4583.87
MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY53.9932.4586.44
EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORK LIFT, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL (HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY54.9032.4587.35
IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCEMENT, AND STONE DERRICKMAN (REMANINDER OF COUNTY)35.5031.3966.89
LABORERS: GROUP 4: (HEAVY & HIGHWAY CONSTRUCTION:) BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY28.6523.7452.39
LABORERS: GROUP 3: (HEAVY & HIGHWAY CONSTRUCTION:) ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AMD SIMILAR TYPE), ACETYLENE TORCH OPERATORS, AND ASPHALT PAVER, POWERMAN FOOTNOTE A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY28.4523.7452.19
LABORERS: GROUP 2: (HEAVY & HIGHWAY CONSTRUCTION:) BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTOR MIXER, PAVEMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL GENERATORS FOR LABORERS'S TOOLS, INSTALLATION OF BRIDGE DRAINAGE, PIPELAYERS, VIBRATOR TYPE ROLLERS, TAMPER, DRILL DOCTOR, TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2"" AND SINGLE DIAPHRAM), NOZZLE (APHLAT, GUNNITE, SEEDING AND SAND BLASTING), LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL, AND AIR TOOL OPERATORS, WRECKING LABORERS FOOTNOTE A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY28.2523.7451.99
LABORERS: GROUP 1: (HEAVY & HIGHWAY CONSTRUCTION:) COMMON LABORERS, FLAGMAN, OUTBOARD AND HAND BOATS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY28.0523.7451.79
LABORERS: BUILDING CONSTRUCTION: WAGON DRILL OPERATOR FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY22.9020.6443.54
LABORERS: BUILDING CONSTRUCTION: PIPELAYERS, MOTOR MIXERS, MOTOR BUGGY OPERATOR (WALK BEHIND) POWER LIFT (WALK BEHIND) FOOTNOTE: A. PAID HOLIDAYS MEMORIAL DAY, JULY THE 4TH, LABOR DAY, AND THANKSGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED ONE DAY BEFORE AND ONE DAY AFTER THE HOLIDAY)22.6520.6443.29
LABORERS: BUILDING CONSTRUCTION: LABORERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY22.5020.6443.14
LABORERS: BUILDING CONSTRUCTION: HAZARDOUS WASTE REMOVAL (HAZARDOUS WASTE REMOVAL INCLUDES, WETTING,STRIPPING, REMOVAL, SCRAPPING, VACCUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHEATHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY24.0020.6444.64
AFTER THE HOLIDAY)23.0020.6443.64
LABORERS: BUILDING CONSTRUCTION: ASBESTOS REMOVAL FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY24.0020.6444.64
PAINTERS: SPRAY, SANDBLASTING, STRUCTURAL STEEL (BUILDING CONSTRUCTION)27.7726.2354.00
PAINTERS: BRUSH & ROLL, DRYWALL TAPING/FINISHING (BUILDING CONSTRUCTION)27.2726.2353.50
GLAZIER30.0027.5957.59
PLUMBER, INCLUDING STEAMFITTING (NORTHERN ZONE)45.9333.7779.70
ROOFER35.8025.9961.79
SPRINKLER FITTER47.8528.9476.79
SHEET METAL WORKER (PROJECTS OVER $10 MILLION)46.2923.3169.60
SHEET METAL WORKER (PROJECTS 10 MILLION OR LESS)36.2923.3159.60
Residential
NY20260095 rev 1 · 05/18/2026 · 18 classifications
ClassificationBase rateFringeTotal
BRICKLAYER25.3812.0237.40
IRONWORKER, STRUCTURAL35.7530.8066.55
IRONWORKER, ORNAMENTAL A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY42.6353.7096.33
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 17.55 1.21 ROOFER14.96—14.96
PLUMBER22.71—22.71
PAINTER (BRUSH AND ROLLER)16.53—16.53
OPERATOR: LOADER27.8821.4049.28
OPERATOR: BULLDOZER20.80—20.80
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE18.493.8922.38
LABORER: MASON TENDER - CEMENT/CONCRETE19.69—19.69
LABORER: MASON TENDER - BRICK18.03—18.03
LABORER: LANDSCAPE12.641.8514.49
LABORER: COMMON OR GENERAL15.35—15.35
LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS)19.73—19.73
IRONWORKER, REINFORCING27.0623.0250.08
ELECTRICIAN17.634.9622.59
CEMENT MASON/CONCRETE FINISHER21.3013.2734.57
CARPENTER14.70—14.70
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.