Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

Davis-Bacon rates — Cattaraugus County, New York

Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.

Pick the construction type that matches your contract, not the highest rate. Building, Residential, Highway and Heavy are separate determinations with different rates, and using the wrong one is a common reason a certified payroll comes back rejected. Where your trade appears under several classifications the choice between them is a judgement call — the plainest match is usually right, and the contracting officer can confirm it.
Building
NY20260100 rev 1 · 05/18/2026 · 28 classifications
ClassificationBase rateFringeTotal
TILE SETTER38.3420.5158.85
CEMENT MASON/CONCRETE FINISHER32.5322.1054.63
SOFT FLOOR LAYER25.6117.4043.01
CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION)30.6521.5252.17
ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING)42.5027.2369.73
IRONWORKER: ORNAMENTAL35.4932.3067.79
IRONWORKER, STRUCTURAL35.4932.3067.79
IRONWORKER, REINFORCING35.4932.3067.79
PAINTER (SPRAY)28.3525.2153.56
PAINTER: BRUSH AND ROLLER27.2525.2452.49
PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION)42.2029.8072.00
PLUMBER42.2029.8072.00
ROOFER36.7018.0054.70
PAINTER: DRYWALL FINISHING/TAPING24.8121.1345.94
OPERATOR: FORKLIFT32.7024.1256.82
OPERATOR: CRANE36.5226.9163.43
OPERATOR: BOBCAT/SKID STEER/SKID LOADER41.1019.2660.36
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE43.9724.1768.14
MILLWRIGHT27.7720.3448.11
LABORER: MASON TENDER - CEMENT/CONCRETE23.8414.1838.02
LABORER: COMMON OR GENERAL24.3516.2740.62
INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)31.5021.1152.61
INSTALLER: METAL STUDS26.7017.4044.10
GLAZIER25.0319.7044.73
CARPENTER (FORM WORK ONLY)25.8417.5643.40
CARPENTER (DRYWALL HANGING ONLY)26.9917.4044.39
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)26.0018.3544.35
BRICKLAYER31.6124.9856.59
Residential
NY20260077 rev 1 · 05/18/2026 · 16 classifications
ClassificationBase rateFringeTotal
PLUMBER (EXCLUDES HVAC UNIT INSTALLATION)27.4423.4050.84
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)17.412.4619.87
ROOFER16.64—16.64
PLUMBER (HVAC UNIT INSTALLATION ONLY)20.91—20.91
PAINTER (BRUSH AND ROLLER), EXCLUDES DRYWALL FINISHING/TAPING18.47—18.47
OPERATOR: BULLDOZER21.72—21.72
OPERATOR: BOBCAT/SKID STEER/SKID LOADER27.74—27.74
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE21.73—21.73
LABORER: MASON TENDER - CEMENT/CONCRETE16.0010.4526.45
LABORER: COMMON OR GENERAL14.73—14.73
ELECTRICIAN17.08—17.08
DRYWALL FINISHER/TAPER21.51—21.51
CEMENT MASON/CONCRETE FINISHER22.605.7528.35
CARPENTER, EXCLUDING SIDING INSTALLATION (METAL, ALUMINUM, VINYL) AND DRYWALL HANGING AND METAL STUD INSTALLATION20.89—20.89
CARPENTER (SIDING INSTALLATION ONLY - METAL, ALUMINUM, VINYL)16.35—16.35
CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY)23.14—23.14
HeavyHighway
NY20260008 rev 3 · 07/30/2026 · 106 classifications
ClassificationBase rateFringeTotal
HAZARDOUS MATERIAL HANDLER34.1526.0960.24
ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDE APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS)37.6530.6968.34
BOILERMAKER39.3533.1872.53
CEMENT MASON/CONCRETE FINISHER (CHATAUQUA COUNTY AND CATTARAUGUS COUNTY (EXCLUDING TWNSP OF PERRYSBURG))38.6325.0563.68
TILESETTER & TERRAZZO WORKER (ERIE, CATTARAUGUS (TOWNS OF PERRYSBURG & GOWANDA))31.2120.5451.75
MARBLE SETTER (ERIE, CATTARAUGUS (TOWNS OF PERRYSBURG & GOWANDA))31.7229.1860.90
CEMENT MASON (ERIE, CATTARAUGUS (TOWNS OF PERRYSBURG & GOWANDA))36.8231.3368.15
BRICKLAYER, STONEMASON (ERIE, CATTARAUGUS (TOWNS OF PERRYSBURG & GOWANDA))37.4432.7170.15
TERRAZZO FINISHER (ERIE, CATTARAUGUS (TOWNS OF PERRYSBURG & GOWANDA))34.7117.5452.25
TILE FINISHER (ERIE, CATTARAUGUS (TOWNS OF PERRYSBURG & GOWANDA))34.7117.5452.25
HOLIDAY FALLS38.1826.1164.29
CARPENTER, HEAVY & HIGHWAY (ERIE (GRAND ISLAND)) FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY, LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEFORE AND AFTER THE HOLIDAY AND IS ON THE PAYROLL IN THE PAYROLL WEEK IN WHICH THE HOLIDAY FALLS41.1931.5572.74
AFTER THE HOLIDAY AND IS ON THE PAYROLL IN THE PAYROLL WEEK IN WHICH THE HOLIDAY FALLS38.1826.1164.29
CABLE SPLICER (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MANSFIELD, NEW ALBION, OTTO, PERRYSBURG, PERSIA AND YORKSHIRE TOWNSHIPS))36.7323.3960.12
ELECTRICIAN (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MANSFIELD, NEW ALBION, OTTO, PERRYSBURG, PERSIA AND YORKSHIRE TOWNSHIPS))44.5036.0680.56
COMMUNICATIONS SYSTEM (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MASNFIELD, NEW ALBION, OTTO, PERRSBURG, PERSIA AND YORKSHIRE TOWNSHIPS))14.2014.0228.22
COMMUNICATIONS SYSTEM, INSTALLER (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MASNFIELD, NEW ALBION, OTTO, PERRSBURG, PERSIA AND YORKSHIRE TOWNSHIPS))22.9021.3844.28
COMMUNICATIONS SYSTEM, MASTER TECHNICIAN (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MASNFIELD, NEW ALBION, OTTO, PERRSBURG, PERSIA AND YORKSHIRE TOWNSHIPS))44.5036.0580.55
COMMUNICATIONS SYSTEM, SOUND WIREMAN (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MASNFIELD, NEW ALBION, OTTO, PERRSBURG, PERSIA AND YORKSHIRE TOWNSHIPS))44.5036.0580.55
CABLE SPLICER (CHAUTAUQUA, CATTARAUGUS (REMAINDER OF COUNTY))35.7520.6856.43
ELECTRICIAN (CHAUTAUQUA, CATTARAUGUS (REMAINDER OF COUNTY))42.5027.2369.73
THE HOLIDAY31.7229.8761.59
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY42.2930.6672.95
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY47.5731.0378.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY52.8635.6088.46
THE HOLIDAY42.2930.6672.95
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY61.5636.2197.77
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY49.2531.1580.40
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)63.1433.8296.96
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)64.5942.92107.51
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)35.3430.1265.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)35.3430.1265.46
fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)35.3430.1265.46
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)55.4031.7887.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)55.4031.7887.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab55.4031.7887.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)61.5636.2197.77
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins61.5636.2197.77
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)49.2531.1580.40
fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)49.2531.1580.40
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY40.816.9947.80
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY20.536.3926.92
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY38.736.9345.66
ELEVATOR MECHANIC FOOTNOTE: A.VACATION 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY62.3938.44100.83
PNEUMATIC MIXER, POST HOLE DIGGER, POWER BOOM, PUMP CRETE, PUSH OR SNATCH CAT, QUARRY MASTER OR EQUIVALENT ROAD WIDENER, ROCK BIT SHARPENER (ALL TYPES), ROLLER (ALL), ROLLING MACHIN (PIPE), ROTOMILL, SCOOPMOBILE, SHOVEL, SIDE BOOM, SKIMMER, SLIP FORM PAVER (CMI AND SIMILAR TYPE, FIRST AND SECOND OPERATOR), SNORKEL, STRATO-TOWER, STUMP CHIPPING MACHINE, TIRE TRUCK AND REPAIR, TOWED ROLLER, TRACTOR DRAWN BELT TYPE GRADER/LOADER, TRACTOR SHOVEL, TRACTOR WITH TOWED ACCESSORIES, TRACTORS (WHEN USING WINCH POWER), TRACTORS, TRENCHER, TRUCK CRANE, TUNNEL SHOVEL, TUBE FINISHER (CMI AND SIMILAR TYPE), VIBRATORY COMPACTOR, VIBRO TAMP, WELL DRILLING MACHINE, WELL POINT, WINCH, WINCH TRUCK WITH ""A"" FRAME. NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY47.3936.8984.28
TUNNEL WORK $1.00 FOOTNOTES A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY42.8936.8979.78
POWER EQUIPMENT OPERATORS: GROUP 3 CRANES 5 - 60 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY50.6436.8987.53
POWER EQUIPMENT OPERATORS: GROUP 4 CRANES 61 - 199 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY51.6436.8988.53
POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 200 - 399 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY52.1436.8989.03
POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 400 TONS & OVER NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY52.6436.8989.53
TUNNEL WORK $1.00 FOOTNOTES A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY48.4636.8985.35
IRONWORKER (FENCE ERECTORS)34.0630.8064.86
IRONWORKER (STRUCTURAL, ORNAMENTAL, REINFORCING STEEL, WELDERS, RIGGERS AND RODMAN)35.4932.3067.79
IRONWORKER (WINDOW ERECTORS)33.1432.3065.44
IRONWORKER35.4932.3067.79
IRONWORKER: SHEETER35.4932.3067.79
LABORER GROUP 1 LABORERS; FLAGMEN; OUTBOARD AND HAND BOATS; DEMOLITION WORKER; IBC BARRIERS (EXCEPT ON STRUCTURES); GUARD RAILS;ROAD MARKERS (ERIE COUNTY HEAVY & HIGHWAY) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK34.6628.6563.31
LABORER GROUP 2 BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; JACKHAMMER; MASON TENDER MORTAR MIXER; PAVEMENT BREAKER; HANDLERS OF ALL STEEL MESH; SMALL GENERATORS FOR LABORERS' TOOLS; INSTALLATION OF BRIDGE DRAINAGE PIPE; PIPELAYERS; VIBRATOR TYPE ROLLERS; TAMPER; DRILL DOCTOR; TAIL OR SCREW OPERATOR ON ASPHALT PAVER; WATER PUMP (2"" AND SINGLE DIAPHRAM); NOZZLE (ASPHALT, GUNNITE, SEEDING AND SANDBLASTING); LABORERS ON CHAIN LINK FENCE ERECTION; ROCK SPLITTER AND POWER UNIT; PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL AND AIR TOOL OPERATORS; WRECKING LABORERS; LASER MAN (ERIE COUNTY HEAVY & HIGHWAY) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK34.8628.6563.51
LABORER GROUP 3 ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE); ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN; WELDER (ERIE COUNTY HEAVY & HIGHWAY) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK35.0628.6563.71
LABORER GROUP 4 BLASTERS; CURB & FLAT WORK FORM SETTERS (EXCEPT ON STRUCTURES); STONE OR GRANITE CURB SETTERS (ERIE COUNTY HEAVY & HIGHWAY) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK35.2628.6563.91
LABORER GROUP 1: GENERAL; FLAGMAN; TOP MAN; WRECKERS (ERIE COUNTY SEWER/WATER)34.6628.6563.31
LABORER GROUP 1: MOLE NIPPER; POWDER HANDLER; TOP LABORER (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK36.1628.6564.81
LABORER GROUP 2: AIR SPADE; JACKHAMMER; PAVEMENT BREAKER (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK36.3128.6564.96
LABORER GROUP 2: FOUNDATION; ROD CARRIERS; PLASTER TENDER; SCAFFOLD BOOTMAN; PNEUMATIC, GAS, ELECTRIC TOOL OPERATOR; JACKHAMMER; CHIPPING GUNS (ERIE COUNTY SEWER/WATER)34.7628.6563.41
LABORER GROUP 3: MORTAR MIXER OVER 8 FEET IN DEPTH (ERIE COUNTY SEWER/WATER)34.8128.6563.46
LABORER GROUP 3: TOP BELL (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK36.4128.6565.06
LABORER GROUP 4: PAVEMENT FORMSETTER; STEELBURNER; CAISSON; WAGON DRILL OPERATOR; PIPELAYER; SWING SCAFFOLD (ERIE COUNTY SEWER/WATER)34.9128.6563.56
LABORER GROUP 4: BOTTOM BELL; SIDE OR ROOFBELT DRILLER; BURNERS; TRACKMEN; NIPPERS; DERAILMEN; HOSEMEN; GROUTMEN; GRAVELMEN; FORM WORKERS; MOVERS & SHAFTMEN; CONVEYORMEN (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK36.9128.6565.56
LABORER GROUP 5: UTILITY PAVE DRIVER; LASER OPERATOR (ERIE COUNTY SEWER/WATER)35.2628.6563.91
LABORER GROUP 5: POWDER MONKEY (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK37.0128.6565.66
LABORER GROUP 6: BLASTER (ERIE COUNTY SEWER/WATER)35.6628.6564.31
LABORER GROUP 6: BLASTERS; IRONMEN; WELDER; HEADING DRILLER (ERIE COUNTY TUNNEL FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK37.4128.6566.06
LABORER GROUP 7: PILEDRIVER; RIGGER (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK37.6628.6566.31
LABORERS: HEAVY AND HIGHWAY (ZONE I) GROUP 133.9328.6962.62
LABORERS: HEAVY AND HIGHWAY (ZONE I) GROUP 234.3328.6963.02
LABORERS: HEAVY AND HIGHWAY GROUP 2: BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS; DESIGNATED ASPHALT RAKERS (NOT TO INCLUDE COLD PATCH), TAIL OR SCREW OPERATOR ON ASPHALT PAVER ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS, POWDERMAN. (CATTARAUGUS COUNTY AND CHAUTAUQUA COUNTY (REMAINING TOWNSHIPS))34.3328.6963.02
LABORERS: HEAVY AND HIGHWAYGROUP 1: FLAGMAN, OUTBOARD AND HAND BOATS, BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOT, GIN BUGGY, HAND OR MACHINE VIBRATOR JACK HAMMER, MASON TENDER, MORTAR MIXER, PAVEMENT BREAKER, HANDLER OF ALL STEEL MESH, SMALL GENERATOR FOR LABORERS' TOOLS, INSTALLATION OF BRIDGE DRAINAGE PIPE; PIPE LAYERS, VIBRATOR TYPE ROLLERS, TAMPER DRILL DOCTOR, WATER PUMP OPERATOR (1 1/2"" AND SINGLE DIAPHRAGM), NOZZLE (ASPHALT, GUNITE, SEEDING AND SANDBLASTING) LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL AND AIR TOOL OPERATORS, WRECKING LABORERS. (CATTARAUGUS COUNTY AND CHAUTAUQUA COUNTY (REMAINING TOWNSHIPS))33.9328.6962.62
PAINTERS: CATTARAUGUS, CHAUTAUQUA & ERIE COUNTIES38.5028.4066.90
PAINTERS:, BUILDING CONSTRUCTION: BRUSH AND ROLLER (ERIE COUNTY)33.0028.2161.21
PAINTERS:, BUILDING CONSTRUCTION: DRYWALL/TAPING (ERIE COUNTY)34.0028.5162.51
PAINTERS:, BUILDING CONSTRUCTION: WALLCOVERING (ERIE COUNTY)33.0028.2161.21
PAINTERS: BRIDGE PAINTER (HEAVY & HIGHWAY CONSTRUCTION)42.0630.5972.65
GLAZIER34.6827.6462.32
PAINTERS: BRIDGES (CATTARAUGUS COUNTY - Townships of Leon, Conewango, Randolph, South Valley, Napoli and New Albion; CHAUTAUQUA COUNTY - Townships of French Creek, Mina, Ripley, Westfield, Sherman, Clymer, Chautauqua, North Harmony, Harmony, Busti, Ellery, Stockton, Charlotte, Gerry, Ellicott, Jamestown, Kiantone, Carroll, Poland, Ellington and Cherry Creek.)42.0630.5972.65
PAINTERS: BRIDGES (CATTARAUGUS COUNTY (Townships of Cold Spring, Elko, Mansfield, Little Valley, Salamanca Indian Reservation, Red House, Ellicottville, Great Valley, Carrolton, Franklinville, Humphrey, Allegany, Freedom, Farmersville, Lyndon, Ishua, Hinsdale, Olean and Portville))42.0630.5972.65
PLASTERER33.0525.0958.14
CEMENT FINISHER33.6531.4765.12
PLUMBER/PIPEFITTER: (ZONE 1)42.2029.8072.00
STEAMFITTER: (ZONE 1)42.2029.8072.00
PLUMBER/PIPEFITTER: (ZONE 2)42.2029.8072.00
ROOFERS: COMPOSITION (ERIE COUNTY)34.9626.0360.99
ROOFERS: SLATE & TILE (ERIE COUNTY)35.1126.0361.14
ROOFER23.6511.9935.64
SPRINKLER FITTER47.8528.9476.79
SHEET METAL WORKER (ERIE COUNTY)39.5029.1868.68
SHEET METAL WORKER (CATTARAUGUS AND CHAUTAUQUA COUNTIES:)31.0024.5655.56
TRUCK DRIVERS: GROUP 1 PICKUPS, PANEL TRUCKS, FLATBOY MATERIAL TRUCKS (STRAIGHT JOBS), SINGLE-AXLE DUMP TRUCKS, DUMPSTERS, TANDEMS, BATCH TRUCKS, MECHANICS SEMI TRAILERS, LOW-BOY TRUCKS, ASPHALT DISTRIBUTOR TRUCKS, AGITATOR, MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES, TRUCK MECHANICS, FUEL TRUCKS. (CATTARAUGUS AND CHAUTAUQUA COUNTIES) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. TRUCK DRIVER CLASSIFICATIONS49.6616.8266.48
TRUCK DRIVERS: GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT-EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED, STRADDLE (ROSS) CARRIER, SELF-CONTAINED CONCRETE UNIT, OFF-HIGHWAY TANDEM BACK-DUMP, TWIN ENGINE EQUIPENT AND DOUBLE-HITCHED EQUIPMENT WHERE NOT SELF-LOADED (CATTARAUGUS AND CHAUTAUQUA COUNTIES) FOOTNOTE A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. TRUCK DRIVER CLASSIFICATIONS49.6616.8266.48
TRUCK DRIVERS: INCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS WORK ON A HAZARDOUS WASTE SITE THEN ADDITIONAL $2.00 PER HOUR. FOOTNOTE: A PENSION $56.20 PER DAY B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND AFTER THE HOLIDAY49.238.7557.98
TRUCK DRIVERS:: DUMP TRUCK ONLY, EXCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS FOOTNOTE: A PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND AFTER THE HOLIDAY32.00—32.00
Heavy
NY20260048 rev 1 · 05/18/2026 · 54 classifications
ClassificationBase rateFringeTotal
ATTICA, BENNINGTON, EAGLE, JAVA, ORANGEVILLE, SHELDON AND WETHERFIELD) WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX FIBER OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS); LAN (LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK). ALSO, INSTALLATION OF SOUND SYSTEMS, NURSES CALL SYSTEMS, INTERCOM SYSTEMS, STAFF REGISTRY/LOCATING/SIGNALING SYSTEMS, ANTENNA SYSTEMS AND ASSOCIATED DEVICES; INSTALLATION OF SECURITY SYSTEMS AND APPARATUS, AND CABLING FROM VDT'S TO COMPUTERS. THIS WORK DOES NOT APPLY TO NEW CONSTRUCTION, OR TO THE INSTALLATION OF RACEWAY SYSTEMS AND BOXES FOR THE ABOVE WORK. FOOTNOTE A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING, CHRISTMAS DAY44.5036.0580.55
ORANGEVILLE, SHELDON AND WETHERFIELD) WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX FIBER OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS); LAN (LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK). ALSO, INSTALLATION OF SOUND SYSTEMS, NURSES CALL SYSTEMS, INTERCOM SYSTEMS, STAFF REGISTRY/LOCATING/SIGNALING SYSTEMS, ANTENNA SYSTEMS AND ASSOCIATED DEVICES; INSTALLATION OF SECURITY SYSTEMS AND APPARATUS, AND CABLING FROM VDT'S TO COMPUTERS. THIS WORK DOES NOT APPLY TO NEW CONSTRUCTION, OR TO THE INSTALLATION OF RACEWAY SYSTEMS AND BOXES FOR THE ABOVE WORK. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING, CHRISTMAS DAY44.5036.0580.55
ATTICA, BENNINGTON, EAGLE, JAVA, ORANGEVILLE, SHELDON AND WETHERFIELD) WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX FIBER OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS); LAN (LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK). ALSO, INSTALLATION OF SOUND SYSTEMS, NURSES CALL SYSTEMS, INTERCOM SYSTEMS, STAFF REGISTRY/LOCATING/SIGNALING SYSTEMS, ANTENNA SYSTEMS AND ASSOCIATED DEVICES; INSTALLATION OF SECURITY SYSTEMS AND APPARATUS, AND CABLING FROM VDT'S TO COMPUTERS. THIS WORK DOES NOT APPLY TO NEW CONSTRUCTION, OR TO THE INSTALLATION OF RACEWAY SYSTEMS AND BOXES FOR THE ABOVE WORK. FOOTNOTE A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING, CHRISTMAS DAY22.9021.3844.28
EAGLE, JAVA, ORANGEVILLE, SHELDON AND WETHERFIELD) WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX FIBER OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS); LAN (LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK). ALSO, INSTALLATION OF SOUND SYSTEMS, NURSES CALL SYSTEMS, INTERCOM SYSTEMS, STAFF REGISTRY/LOCATING/SIGNALING SYSTEMS, ANTENNA SYSTEMS AND ASSOCIATED DEVICES; INSTALLATION OF SECURITY SYSTEMS AND APPARATUS, AND CABLING FROM VDT'S TO COMPUTERS. THIS WORK DOES NOT APPLY TO NEW CONSTRUCTION, OR TO THE INSTALLATION OF RACEWAY SYSTEMS AND BOXES FOR THE ABOVE WORK. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING, CHRISTMAS DAY14.2014.0228.22
ELECTRICIAN (CORTLAND AND TOMPKINS COUNTIES)50.5035.0385.53
ELECTRICIAN (WYOMING (REMAINDER OF COUNTY))44.3030.2074.50
CABLE SPLICER (ALLEGANY (TOWNSHIPS OF ALMA, BELFAST, BELMONT, BOLIVAR, CONEADEA, CENTERVILLE, CLARKSVILLE, CUBA, FRIENDSHIP, GENESEE, NEW HUDSON, RUSHFORD, SCIO AND WIRT CATTARAUGUS (REMAINDER OF COUNTY))35.7520.6856.43
ELECTRICIAN (ALLEGANY (TOWNSHIPS OF ALMA, BELFAST, BELMONT, BOLIVAR, CONEADEA, CENTERVILLE, CLARKSVILLE, CUBA, FRIENDSHIP, GENESEE, NEW HUDSON, RUSHFORD, SCIO AND WIRT CATTARAUGUS (REMAINDER OF COUNTY))42.5027.2369.73
ELECTRICIAN (ALLEGANY (REMAINDER OF COUNTY), SCHUYLER (REMAINDER OF COUNTY) AND STEUBEN COUNTIES)43.4031.7275.12
ELECTRICIAN (SENECA (TOWNSHIPS OF COVERT AND LODI) AND SCHUYLER (TOWNSHIPS OF CATHARINE, CAYUTA, HECTOR))44.5031.8976.39
ELECTRICIAN (SENECA (REMAINDER OF COUNTY) AND YATES COUNTY)45.0031.1276.12
THE HOLIDAY42.2930.6672.95
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY52.8635.6088.46
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY47.5731.0378.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY42.2930.6672.95
THE HOLIDAY31.7229.8761.59
fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins61.5636.2197.77
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)61.5636.2197.77
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)49.2531.1580.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab55.4031.7887.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)55.4031.7887.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)55.4031.7887.18
fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)35.3430.1265.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)35.3430.1265.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)35.3430.1265.46
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)64.5942.92107.51
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)63.1433.8296.96
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY49.2531.1580.40
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY49.2531.1580.40
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY61.5636.2197.77
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY38.736.9345.66
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY20.536.3926.92
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY40.816.9947.80
POWER EQUIPMENT OPERATORS:: PAVERS (CATTARAUGUS AND WYOMING COUNTIES) A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY47.3936.8984.28
POWER EQUIPMENT OPERATORS: PAVER (ALLEGANY, SCHUYLER, STEUBEN AND YATES COUNTIES) FOOTNOTE A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY40.8028.2569.05
AFTER THE HOLIDAY40.8025.1565.95
TRUCK DRIVER: DUMP16.947.1124.05
POWER EQUIPMENT OPERATORS: BULLDOZERS22.2811.7934.07
POWER EQUIPMENT OPERATORS: BACKHOES22.0811.3133.39
POWER EQUIPMENT OPERATORS: (TRACTORS)20.5710.9531.52
POWER EQUIPMENT OPERATORS: (ROLLERS)21.0811.7332.81
POWER EQUIPMENT OPERATORS: (LOADERS)22.1011.4433.54
POWER EQUIPMENT OPERATORS: (EXCAVATORS)22.6312.1434.77
LABORERS: UNSKILLED17.206.6323.83
LABORERS: PIPELAYERS17.796.7024.49
LABORERS: (RAKERS)17.046.3023.34
CEMENT MASON/CONCRETE FINISHER17.457.9025.35
CARPENTER20.617.4928.10
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.