Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 36.66 | 11.83 | 48.49 |
| CARPENTER (INCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND METAL STUD INSTALLATION (EXCLUDES FORM WORK)) | 24.08 | 10.79 | 34.87 |
| ELECTRICIAN | 40.30 | 13.41 | 53.71 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | 53.35 | 38.44 | 91.79 |
| IRONWORKER, STRUCTURAL | 28.05 | 18.11 | 46.16 |
| PLUMBER (INCLUDES HVAC PIPE INSTALLATION) | 43.07 | 16.60 | 59.67 |
| PIPEFITTER | 43.07 | 16.60 | 59.67 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 39.94 | 25.48 | 65.42 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT AND UNIT INSTALLATION) | 37.50 | 18.51 | 56.01 |
| PAINTER: SPRAY | 16.51 | 2.14 | 18.65 |
| PAINTER (BRUSH AND ROLLER) | 16.60 | 3.88 | 20.48 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 27.97 | 5.16 | 33.13 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 14.72 | 5.61 | 20.33 |
| LABORER: COMMON OR GENERAL | 15.99 | 4.72 | 20.71 |
| GLAZIER | 20.15 | 3.48 | 23.63 |
| CEMENT MASON/CONCRETE FINISHER | 18.40 | 7.45 | 25.85 |
| CARPENTER (FORM WORK ONLY) | 21.38 | 9.12 | 30.50 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (SETTING OF HVAC UNIT AND DUCT WORK INSTALLATION ONLY) | 14.43 | 0.58 | 15.01 |
| ROOFER | 9.87 | — | 9.87 |
| PLUMBER (INCLUDING HVAC WORK) | 16.07 | 0.65 | 16.72 |
| PAINTER (EXCLUDING DRYWALL FINISHING) | 9.00 | — | 9.00 |
| LABORER, UNSKILLED | 8.13 | — | 8.13 |
| FLOOR LAYER: CARPET | 10.00 | — | 10.00 |
| ELECTRICIAN | 12.00 | 0.23 | 12.23 |
| DRYWALL FINISHER/TAPER | 8.00 | — | 8.00 |
| CEMENT MASON/CONCRETE FINISHER | 10.91 | — | 10.91 |
| CARPENTER (EXCLUDING INSTALLATION OF SOFT FLOORS AND BATT AND BLOWN INSULATION) | 10.85 | 0.30 | 11.15 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: WATER TRUCK | 13.51 | 1.51 | 15.02 |
| TRUCK DRIVER: DUMP TRUCK (SANDOVAL, TORRANCE, VALENCIA) | 14.51 | 0.26 | 14.77 |
| TRUCK DRIVER: DUMP TRUCK (BERNALLILO) | 14.46 | 0.26 | 14.72 |
| POWER EQUIPMENT OPERATOR: OILER (BERNALILO, SANDOVAL, TORRANCE, & VALENCIA) | 22.08 | 8.72 | 30.80 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (SANDOVAL, TORRANCE, VALENCIA) | 16.59 | 0.26 | 16.85 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (BERNALLILO) | 16.78 | 0.26 | 17.04 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (SANDOVAL, TORRANCE, VALENCIA) | 14.91 | 0.26 | 15.17 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (BERNALLILO) | 14.73 | 0.26 | 14.99 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | 15.22 | 0.26 | 15.48 |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR/TRACKHOE) | 20.10 | 0.26 | 20.36 |
| POWER EQUIPMENT OPERATOR: (BROOM SWEEPER) | 16.67 | 1.57 | 18.24 |
| POWER EQUIPMENT OPERATOR: (BACKHOE) | 20.92 | 3.62 | 24.54 |
| LABORER, COMMON OR GENERAL (SANDOVAL) | 11.85 | 0.35 | 12.20 |
| LABORER, COMMON OR GENERAL (BERNALLILO, TORRANCE, AND VALENCIA) | 11.82 | 0.35 | 12.17 |
| LABORER (TRAFFIC CONTROL (INCLUDES FLAGGER AND CONE SETTER)) | 14.27 | 0.35 | 14.62 |
| IRONWORKER, REINFORCING | 22.61 | 6.03 | 28.64 |
| ELECTRICIAN (INCLUDING TRAFFIC SIGNALIZATION & INSTALLATION) | 25.91 | 9.45 | 35.36 |
| CEMENT MASON/CONCRETE FINISHER (SANDOVAL, TORRANCE, AND VALENCIA) | 15.58 | 0.26 | 15.84 |
| CEMENT MASON/CONCRETE FINISHER (BERNALLILO) | 15.35 | 0.26 | 15.61 |
| CARPENTER, INCLUDING FORM WORK (SANDOVAL, TORRANCE, AND VALENCIA) | 13.70 | 0.44 | 14.14 |
| CARPENTER, INCLUDING FORM WORK (BERNALLLILO) | 13.73 | 0.44 | 14.17 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | 27.31 | 13.18 | 40.49 |
| ELECTRICIAN | 34.50 | 10.81 | 45.31 |
| TRUCK DRIVER: DUMP TRUCK | 14.72 | — | 14.72 |
| OPERATOR: ROLLER | 18.83 | — | 18.83 |
| OPERATOR: OILER | 18.23 | — | 18.23 |
| OPERATOR: LOADER | 18.56 | — | 18.56 |
| OPERATOR: GRADER/BLADE | 19.02 | — | 19.02 |
| OPERATOR: BULLDOZER | 21.00 | — | 21.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 21.06 | — | 21.06 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 21.07 | — | 21.07 |
| LABORER: PIPELAYER | 17.18 | 4.53 | 21.71 |
| LABORER: COMMON OR GENERAL | 14.68 | 1.58 | 16.26 |
| IRONWORKER, REINFORCING | 27.80 | — | 27.80 |
| CEMENT MASON/CONCRETE FINISHER | 19.42 | 8.43 | 27.85 |
| CARPENTER, EXCLUDES FORM WORK | 16.43 | — | 16.43 |