| TRUCK DRIVER: WATER TRUCK | 13.13 | 0.26 | 13.39 |
| TRUCK DRIVER: PICKUP AND PILOT CAR | 12.74 | 0.26 | 13.00 |
| TRUCK DRIVER: FLATBED TRUCK (RIO ARRIBA) | 12.95 | 0.26 | 13.21 |
| TRUCK DRIVER: FLATBED TRUCK (QUAY, SAN MIGUEL) | 13.30 | 0.26 | 13.56 |
| TRUCK DRIVER: FLATBED TRUCK (MCKINLEY) | 13.55 | 0.26 | 13.81 |
| TRUCK DRIVER: FLATBED TRUCK (COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MORA, TAOS, UNION) | 13.27 | 0.26 | 13.53 |
| TRUCK DRIVER: FLATBED TRUCK (CIBOLA) | 12.71 | 0.26 | 12.97 |
| TRUCK DRIVER: DUMP TRUCK (QUAY) | 15.20 | 0.26 | 15.46 |
| TRUCK DRIVER: DUMP TRUCK (MCKINLEY) | 13.15 | 0.26 | 13.41 |
| TRUCK DRIVER: DUMP TRUCK (COLFAX, SAN MIGUEL) | 13.24 | 0.26 | 13.50 |
| TRUCK DRIVER: DUMP TRUCK (CIBOLA, GUADALUPE, HARDING, LOS ALAMOS, MORA, RIO ARRIBA, TAOS, UNION).$ 14.75 0.26 TRUCK DRIVER: DISTRIBUTOR | 13.56 | 0.26 | 13.82 |
| TRUCK DRIVER (TRACTOR HAUL TRUCK) | 14.00 | — | 14.00 |
| TRUCK DRIVER (SEMI-TRAILER TRUCK) | 16.58 | 0.26 | 16.84 |
| POWER EQUIPMENT OPERATOR: TRACTOR | 16.84 | 0.26 | 17.10 |
| POWER EQUIPMENT OPERATOR: SCREED | 15.96 | 0.26 | 16.22 |
| POWER EQUIPMENT OPERATOR: SCRAPER | 15.91 | 0.26 | 16.17 |
| POWER EQUIPMENT OPERATOR: ROTOMILL | 15.80 | 0.26 | 16.06 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT) (QUAY) | 14.74 | 0.26 | 15.00 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT) (MCKINLEY) | 16.49 | 0.26 | 16.75 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT) (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | 14.39 | 0.98 | 15.37 |
| POWER EQUIPMENT OPERATOR: PILEDRIVER (QUAY) | 15.99 | 0.26 | 16.25 |
| POWER EQUIPMENT OPERATOR: PILEDRIVER (MCKINLEY) | 14.95 | 0.26 | 15.21 |
| POWER EQUIPMENT OPERATOR: PILEDRIVER (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | 15.87 | 0.26 | 16.13 |
| POWER EQUIPMENT OPERATOR: OILER | 14.29 | 0.26 | 14.55 |
| POWER EQUIPMENT OPERATOR: MECHANIC | 17.48 | 0.26 | 17.74 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (QUAY).$ 16.10 0.26 POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (MORA).$ 16.21 0.26 POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (MCKINLEY) | 16.13 | 0.26 | 16.39 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (HARDING) | 19.37 | 0.26 | 19.63 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (COLFAX) | 15.72 | 0.26 | 15.98 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (CIBOLA, GUADALUPE, LOS ALAMOS, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | 16.27 | 0.26 | 16.53 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (QUAY) | 19.50 | 0.26 | 19.76 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | 17.48 | 0.26 | 17.74 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | 17.16 | 0.26 | 17.42 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (QUAY) | 14.89 | 0.26 | 15.15 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | 14.97 | 0.26 | 15.23 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | 18.06 | 0.26 | 18.32 |
| POWER EQUIPMENT OPERATOR BACKHOE/EXCAVATOR/TRACKHOE (QUAY) | 16.27 | 0.26 | 16.53 |
| POWER EQUIPMENT OPERATOR BACKHOE/EXCAVATOR/TRACKHOE (MCKINLEY) | 16.70 | 0.26 | 16.96 |
| POWER EQUIPMENT OPERATOR BACKHOE/EXCAVATOR/TRACKHOE (HARDING) | 20.74 | 0.26 | 21.00 |
| POWER EQUIPMENT OPERATOR BACKHOE/EXCAVATOR/TRACKHOE (CIBOLA, COLFAX, GUADALUPE, LOS ALAMOS, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | 16.80 | 0.26 | 17.06 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | 16.26 | 0.26 | 16.52 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | 16.89 | 0.26 | 17.15 |
| POWER EQUIPMENT OPERATOR: (DISTRIBUTOR) | 14.50 | 0.26 | 14.76 |
| POWER EQUIPMENT OPERATOR: (CRUSHER) | 16.53 | 0.26 | 16.79 |
| POWER EQUIPMENT OPERATOR: (BROOM OPERATOR) | 15.72 | 0.26 | 15.98 |
| POWER EQUIPMENT OPERATOR: (ASPHALT/CONCRETE PAVER, LAYDOWN MACHINE, AND PLANT) | 16.43 | 1.51 | 17.94 |
| PAINTER, BRUSH, ROLLER AND SPRAY (MCKINLEY) | 14.15 | 0.44 | 14.59 |
| PAINTER, BRUSH, ROLLER AND SPRAY (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, QUAY, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | 15.06 | 0.44 | 15.50 |
| LABORER: PIPELAYER | 16.99 | 0.35 | 17.34 |
| LABORER: ASPHALT RAKER | 14.39 | 0.35 | 14.74 |
| LABORER, MASONTENDER-BRICK/CEMENT/CONCRETE (RIO ARRIBA) | 13.33 | 1.97 | 15.30 |
| LABORER, MASONTENDER-BRICK/CEMENT/CONCRETE (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, QUAY, SAN MIGUEL, TAOS, UNION) | 13.04 | 1.78 | 14.82 |
| LABORER, FLAGGER/CONE SETTER (QUAY) | 12.21 | 0.26 | 12.47 |
| LABORER, FLAGGER/CONE SETTER (MCKINLEY) | 11.66 | 0.35 | 12.01 |
| LABORER, FLAGGER/CONE SETTER (COLFX, GUADALUPE, HARDING, LOS ALAMOS, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | 12.15 | 0.99 | 13.14 |
| LABORER, FLAGGER/CONE SETTER (CIBOLA) | 13.14 | 0.35 | 13.49 |
| LABORER, COMMON OR GENERAL (UNION) | 10.89 | 0.35 | 11.24 |
| LABORER, COMMON OR GENERAL (TAOS) | 12.61 | 0.35 | 12.96 |
| LABORER, COMMON OR GENERAL (SAN MIGUEL) | 12.56 | 0.35 | 12.91 |
| LABORER, COMMON OR GENERAL (RIO ARRIBA) | 12.28 | 0.35 | 12.63 |
| LABORER, COMMON OR GENERAL (QUAY) | 12.15 | 0.35 | 12.50 |
| LABORER, COMMON OR GENERAL (MORA) | 11.34 | 0.35 | 11.69 |
| LABORER, COMMON OR GENERAL (MCKINLEY) | 11.22 | 0.35 | 11.57 |
| LABORER, COMMON OR GENERAL (HARDING) | 11.57 | 0.35 | 11.92 |
| LABORER, COMMON OR GENERAL (GUADALUPE, LOS ALAMOS) | 11.83 | 0.35 | 12.18 |
| LABORER, COMMON OR GENERAL (COLFAX) | 9.60 | 0.35 | 9.95 |
| LABORER, COMMON OR GENERAL (CIBOLA) | 12.27 | 0.35 | 12.62 |
| LABORER (GRADE CHECKER) | 14.67 | 1.60 | 16.27 |
| IRONWORKER, STRUCTURAL | 21.77 | 6.03 | 27.80 |
| IRONWORKER, REINFORCING (RIO ARRIBA) | 21.98 | 6.03 | 28.01 |
| IRONWORKER, REINFORCING (MCKINLEY) | 22.44 | 5.85 | 28.29 |
| IRONWORKER, REINFORCING (COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MORA, QUAY, SAN MIGUEL, TAOS, UNION) | 21.57 | 4.80 | 26.37 |
| IRONWORKER, REINFORCING (CIBOLA) | 23.05 | 1.54 | 24.59 |
| INSTALLER: (GUARDRAILS, HANDRAILS AND SIGNS) (QUAY) | 12.00 | 0.35 | 12.35 |
| INSTALLER: (GUARDRAILS, HANDRAILS AND SIGNS) (GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | 12.37 | 0.35 | 12.72 |
| INSTALLER: (GUARDRAILS, HANDRAILS AND SIGNS) (COLFAX) | 11.68 | 0.35 | 12.03 |
| INSTALLER: (GUARDRAILS, HANDRAILS AND SIGNS) (CIBOLA) | 12.35 | 0.35 | 12.70 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (SAN MIGUEL) | 15.31 | 0.35 | 15.66 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (QUAY) | 16.37 | 0.26 | 16.63 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (MCKINLEY) | 14.55 | 0.35 | 14.90 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MORA, RIO ARRIBA, TAOS, UNION) | 15.16 | 0.35 | 15.51 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (CIBOLA) | 13.66 | 0.35 | 14.01 |
| ELECTRICIAN (INCLUDING TRAFFIC SIGNAL INSTALLATION).$ 24.66 8.56 CEMENT MASON/CONCRETE FINISHER (TAOS) | 14.98 | 0.26 | 15.24 |
| CEMENT MASON/CONCRETE FINISHER (RIO ARRIBA, SAN MIGUEL) | 15.58 | 1.54 | 17.12 |
| CEMENT MASON/CONCRETE FINISHER (COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, QUAY, UNION) | 15.07 | 0.26 | 15.33 |
| CEMENT MASON/CONCRETE FINISHER (CIBOLA) | 15.58 | 0.26 | 15.84 |
| CARPENTER, INCLUDES FORM WORK (SAN MIGUEL) | 13.93 | 0.44 | 14.37 |
| CARPENTER, INCLUDES FORM WORK (MORA) | 14.44 | 0.44 | 14.88 |
| CARPENTER, INCLUDES FORM WORK (MCKINLEY) | 13.51 | 0.44 | 13.95 |
| CARPENTER, INCLUDES FORM WORK (GUADALUPE, LOS ALAMOS, COLFAX, HARDING, GUAY, TAOS, UNION) | 13.84 | 0.44 | 14.28 |
| CARPENTER, INCLUDES FORM WORK (CIBOLA, RIA ARRIBA) | 14.27 | 0.44 | 14.71 |