Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 36.66 | 11.83 | 48.49 |
| CARPENTER (EXCLUDES DRYWALL HANGING) | 24.08 | 10.79 | 34.87 |
| PIPEFITTER | 43.07 | 16.60 | 59.67 |
| PLUMBER | 43.07 | 16.60 | 59.67 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | 37.50 | 18.51 | 56.01 |
| PAINTER: SPRAY | 16.51 | 2.14 | 18.65 |
| PAINTER (BRUSH AND ROLLER) | 16.60 | 3.88 | 20.48 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 25.73 | 4.51 | 30.24 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 17.60 | — | 17.60 |
| LABORER: COMMON OR GENERAL | 16.49 | 4.54 | 21.03 |
| IRONWORKER, STRUCTURAL | 28.00 | 8.21 | 36.21 |
| ELECTRICIAN | 29.26 | 8.98 | 38.24 |
| CEMENT MASON/CONCRETE FINISHER | 18.93 | 5.85 | 24.78 |
| CARPENTER (DRYWALL HANGING ONLY) | 19.64 | 6.20 | 25.84 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| PLUMBER | 22.84 | 7.33 | 30.17 |
| TRUCK DRIVER (TANDEM DUMP) | 9.00 | — | 9.00 |
| TRUCK DRIVER (DUMP-SEMI) | 10.00 | — | 10.00 |
| SHEET METAL WORKER (SETTING OF HVAC UNIT AND DUCT WORK INSTALLATION ONLY) | 10.81 | — | 10.81 |
| ROOFER | 9.83 | — | 9.83 |
| POWER EQUIPMENT OPERATOR (BACKHOE) | 12.59 | — | 12.59 |
| PAINTER (EXCLUDING DRYWALL FINISHING) | 9.03 | — | 9.03 |
| LATHER | 10.00 | — | 10.00 |
| LABORER (UNSKILLED) | 8.62 | — | 8.62 |
| LABORER (PIPE LAYER) | 8.59 | — | 8.59 |
| LABORER (LANDSCAPE WORKER) | 7.25 | — | 7.25 |
| LABORER (FENCE ERECTOR) | 8.00 | 0.28 | 8.28 |
| INSULATOR (BATT AND BLOWN) | 13.38 | — | 13.38 |
| ELECTRICIAN | 13.52 | 1.93 | 15.45 |
| DRYWALL HANGER | 12.67 | — | 12.67 |
| DRYWALL FINISHER/TAPER | 14.88 | — | 14.88 |
| CEMENT MASON/CONCRETE FINISHER | 9.79 | — | 9.79 |
| CARPENTER (FORM WORK ONLY) | 11.60 | 0.30 | 11.90 |
| CARPENTER (EXCLUDING SCAFFOLD SETTING, FORM WORK, DRYWALL HANGING, INSTALLATION OF OVERHEAD DOORS, SOFT FLOORS AND BATT INSULATION) | 11.44 | 0.30 | 11.74 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (BOOM OPERATOR) | 29.79 | 12.74 | 42.53 |
| TRUCK DRIVER: WATER TRUCK | 13.51 | 1.51 | 15.02 |
| TRUCK DRIVER: PICKUP TRUCK (SAN JUAN) | 12.95 | 0.26 | 13.21 |
| TRUCK DRIVER: PICKUP TRUCK (DONA ANA) | 12.14 | 0.26 | 12.40 |
| TRUCK DRIVER: DUMP TRUCK (DONA ANA) | 15.04 | 0.26 | 15.30 |
| TRUCK DRIVER (FLATBED TRUCK) | 13.30 | 0.26 | 13.56 |
| POWER EQUIPMENT OPERATOR: TRENCHER (SAN JUAN) | 15.93 | 0.26 | 16.19 |
| POWER EQUIPMENT OPERATOR: TRENCHER (DONA ANA) | 15.22 | 0.26 | 15.48 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT) (SAN JUAN) | 12.91 | 1.60 | 14.51 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT) (DONA ANA) | 16.27 | 1.51 | 17.78 |
| POWER EQUIPMENT OPERATOR: OILER | 22.08 | 8.72 | 30.80 |
| POWER EQUIPMENT OPERATOR: MECHANIC | 23.24 | 1.51 | 24.75 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | 17.64 | 1.51 | 19.15 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | 14.56 | 0.26 | 14.82 |
| POWER EQUIPMENT OPERATOR BACKHOE/EXCAVATOR/TRACKHOE (SAN JUAN) | 16.27 | 1.51 | 17.78 |
| POWER EQUIPMENT OPERATOR BACKHOE/EXCAVATOR/TRACKHOE (DONA ANA) | 17.74 | 0.26 | 18.00 |
| POWER EQUIPMENT OPERATOR: (PILEDRIVER) | 16.26 | 0.26 | 16.52 |
| POWER EQUIPMENT OPERATOR: (LOADER(FRONT END)) | 16.53 | 0.26 | 16.79 |
| POWER EQUIPMENT OPERATOR: (BROOM SWEEPER) | 16.67 | 1.57 | 18.24 |
| LABORER: PIPELAYER | 17.13 | 5.04 | 22.17 |
| LABORER: MASON TENDER-CEMENT/CONCRETE | 10.25 | 0.35 | 10.60 |
| LABORER: COMMON OR GENERAL (SAN JUAN) | 11.48 | 0.35 | 11.83 |
| LABORER, COMMON OR GENERAL (DONA ANA) | 11.95 | 0.35 | 12.30 |
| LABORER (FLAGGER/CONE SETTER) | 14.27 | 0.35 | 14.62 |
| IRONWORKER, REINFORCING (SAN JUAN) | 16.41 | 5.85 | 22.26 |
| IRONWORKER, REINFORCING (DONA ANA) | 22.61 | 6.03 | 28.64 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (SAN JUAN) | 14.39 | 0.35 | 14.74 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (DONA ANA) | 15.44 | 0.35 | 15.79 |
| ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION AND INSTALLATION (SAN JUAN) | 24.46 | 8.56 | 33.02 |
| ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION AND INSTALLATION (DONA ANA) | 25.91 | 9.45 | 35.36 |
| CEMENT MASON/CONCRETE FINISHER | 13.65 | 0.26 | 13.91 |
| CARPENTER, INCLUDES FORM WORK (SAN JUAN) | 13.42 | 0.44 | 13.86 |
| CARPENTER, INCLUDES FORM WORK (DONA ANA) | 14.15 | 0.44 | 14.59 |
| TRUCK DRIVER: DUMP (SAN JUAN) | 21.70 | 9.65 | 31.35 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | 27.31 | 13.18 | 40.49 |
| ELECTRICIAN | 34.50 | 10.81 | 45.31 |
| TRUCK DRIVER: DUMP TRUCK | 15.53 | — | 15.53 |
| OPERATOR: ROLLER | 18.83 | — | 18.83 |
| OPERATOR: OILER | 18.23 | — | 18.23 |
| OPERATOR: LOADER | 18.30 | — | 18.30 |
| OPERATOR: GRADER/BLADE | 19.02 | — | 19.02 |
| OPERATOR: BULLDOZER | 21.00 | — | 21.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 21.06 | — | 21.06 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 20.85 | 4.19 | 25.04 |
| LABORER: PIPELAYER | 16.67 | 3.04 | 19.71 |
| LABORER: COMMON OR GENERAL | 15.68 | 0.35 | 16.03 |
| IRONWORKER, REINFORCING | 27.80 | — | 27.80 |
| CEMENT MASON/CONCRETE FINISHER | 19.44 | 8.08 | 27.52 |
| CARPENTER, EXCLUDES FORM WORK | 16.43 | — | 16.43 |