Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDING ACOUSTICAL CEIING INSTALLATION) | 33.42 | 18.66 | 52.08 |
| ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN | 36.00 | 18.99 | 54.99 |
| ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN | 35.60 | 18.94 | 54.54 |
| ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN | 35.30 | 18.91 | 54.21 |
| ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN | 35.00 | 18.88 | 53.88 |
| ELEVATOR MECHANIC FOOTNOTE: A. VACATION PAY 8% FOR PERSONS WITH 5 OR MORE YEARS OF SERVICE, 6% FOR PERSONS WITH LESS THAN 5 YEARS OF SERVICE. B PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | 55.88 | 38.44 | 94.32 |
| OPERATOR: FORKLIFT | 31.06 | 18.69 | 49.75 |
| OPERATOR: CRANE | 36.44 | 18.69 | 55.13 |
| IRONWORKER, STRUCTURAL | 39.00 | 22.30 | 61.30 |
| LABORER (MASON TENDER, BRICK & HOD) | 24.00 | 13.48 | 37.48 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | 46.25 | 21.10 | 67.35 |
| SHEET METAL WORKER (EXCLUDES INSTALLATION OF HVAC DUCT) | 39.65 | 19.87 | 59.52 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | 14.09 | 2.49 | 16.58 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 21.89 | 6.30 | 28.19 |
| ROOFER | 13.57 | 0.77 | 14.34 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | 22.89 | 6.04 | 28.93 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 14.26 | — | 14.26 |
| OPERATOR: LOADER | 19.27 | 4.00 | 23.27 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 21.72 | 2.10 | 23.82 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 20.68 | 4.93 | 25.61 |
| LABORER: COMMON OR GENERAL | 12.03 | — | 12.03 |
| FORM WORKER | 14.97 | 2.06 | 17.03 |
| ELECTRICIAN: ALARM INSTALLATION | 19.68 | 4.12 | 23.80 |
| ELECTRICIAN (LOW VOLTAGE WIRING) | 20.15 | 4.84 | 24.99 |
| CEMENT MASON/CONCRETE FINISHER | 15.73 | 2.06 | 17.79 |
| CARPENTER | 18.50 | 1.80 | 20.30 |
| BRICKLAYER | 24.44 | — | 24.44 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | 7.25 | — | 7.25 |
| SHEET METAL WORKER | 8.59 | — | 8.59 |
| ROOFER | 7.73 | — | 7.73 |
| POWER EQUIPMENT OPERATORS: SCRAPER | 10.00 | — | 10.00 |
| POWER EQUIPMENT OPERATORS: GRADER | 9.93 | — | 9.93 |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER | 9.12 | — | 9.12 |
| POWER EQUIPMENT OPERATORS: (TRACTOR OPERATOR) | 7.25 | — | 7.25 |
| POWER EQUIPMENT OPERATORS: (ROLLER) | 9.18 | — | 9.18 |
| POWER EQUIPMENT OPERATORS: (BULLDOZER OPERATOR) | 8.98 | — | 8.98 |
| POWER EQUIPMENT OPERATORS: (BACKHOE OPERATOR) | 8.17 | — | 8.17 |
| PLUMBER/PIPEFITTER | 9.00 | — | 9.00 |
| PAINTER | 7.57 | — | 7.57 |
| LABORER | 7.25 | — | 7.25 |
| INSULATOR | 7.25 | — | 7.25 |
| ELECTRICIAN | 7.93 | — | 7.93 |
| DRYWALL WORK (SHEET ROCK HANGER) | 9.00 | — | 9.00 |
| DRYWALL WORK (HAULER, SCRAPPER, STOCKER) | 7.25 | — | 7.25 |
| DRYWALL WORK (FINISHER & TAPER) | 7.57 | — | 7.57 |
| CEMENT MASON/FINISHER | 8.56 | — | 8.56 |
| CARPENTER | 8.30 | — | 8.30 |
| AIR CONDITIONING MECHANIC | 8.00 | — | 8.00 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (SAUNDERS COUNTY - EAST OF HIGHWAY 109 AND NORTH OF ALTERNATE HIGHWAY 30)) | 46.40 | 20.89 | 67.29 |
| OBJECTS ABOVE THE WORKER CAN FALL 40 FT. OR MORE TO BE PAID ONE AND ONE-HALF TIMES THE STRAIGHT- TIME RATE OF PAY | 36.00 | 18.99 | 54.99 |
| ELECTRICIANS: (ZONE 3). REMAINDER OF SAUNDERS COUNTY ZONE 3: 51 TO 75 MILES [MILEAGE FROM MAIN POST OFFICE IN LINCOLN] FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS, ETC., IN ANY AREA WHERE THE WORKER IS IN A POSITION TO FALL 40 FT. OR MORE, OR WHERE OBJECTS ABOVE THE WORKER CAN FALL 40 FT. OR MORE: TO BE PAID ONE AND ONE-HALF TIMES THE STRAIGHT- TIME RATE OF PAY | 35.60 | 18.94 | 54.54 |
| ELECTRICIANS: (ZONE 2). REMAINDER OF SAUNDERS COUNTY ZONE 1: 36 TO 50 MILES [MILEAGE FROM MAIN POST OFFICE IN LINCOLN] FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS, ETC., IN ANY AREA WHERE THE WORKER IS IN A POSITION TO FALL 40 FT. OR MORE, OR WHERE OBJECTS ABOVE THE WORKER CAN FALL 40 FT. OR MORE: TO BE PAID ONE AND ONE-HALF TIMES THE STRAIGHT- TIME RATE OF PAY | 35.30 | 18.91 | 54.21 |
| ELECTRICIANS: (ZONE 1). REMAINDER OF SAUNDERS COUNTY ZONE 1: 0 TO 35 MILES [MILEAGE FROM MAIN POST OFFICE IN LINCOLN] FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS, ETC., IN ANY AREA WHERE THE WORKER IS IN A POSITION TO FALL 40 FT. OR MORE, OR WHERE OBJECTS ABOVE THE WORKER CAN FALL 40 FT. OR MORE: TO BE PAID ONE AND ONE-HALF TIMES THE STRAIGHT- TIME RATE OF PAY | 35.00 | 18.88 | 53.88 |
| TRUCK DRIVER: WATER TRUCK | 18.00 | 6.40 | 24.40 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK (SEWARD, SAUNDERS COUNTIES) | 14.09 | — | 14.09 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK (LANCASTER COUNTY) | 13.48 | — | 13.48 |
| TRUCK DRIVER: LOWBOY TRUCK | 15.93 | — | 15.93 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK (SEWARD COUNTY) | 14.16 | — | 14.16 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK (SAUNDERS COUNTY) | 14.47 | — | 14.47 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK (LANCASTER COUNTY) | 14.51 | — | 14.51 |
| OPERATOR: GRADER/BLADE (SEWARD, SAUNDERS COUNTIES) | 16.04 | — | 16.04 |
| OPERATOR: GRADER/BLADE (LANCASTER COUNTY) | 16.09 | — | 16.09 |
| OPERATOR: TRACTOR (SEWARD, SAUNDERS COUNTIES) | 10.65 | — | 10.65 |
| OPERATOR: TRACTOR (LANCASTER COUNTY) | 9.50 | — | 9.50 |
| OPERATOR: SCRAPER (SEWARD, SAUNDERS COUNTIES) | 14.83 | — | 14.83 |
| OPERATOR: SCRAPER (LANCASTER COUNTY) | 14.80 | — | 14.80 |
| OPERATOR: ROLLER (SEWARD COUNTY) | 14.04 | — | 14.04 |
| OPERATOR: ROLLER (SAUNDERS COUNTY) | 13.45 | — | 13.45 |
| OPERATOR: ROLLER (LANCASTER COUNTY) | 13.00 | — | 13.00 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) (SEWARD, SAUNDERS COUNTIES) | 16.13 | — | 16.13 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) (LANCASTER COUNTY) | 14.79 | — | 14.79 |
| OPERATOR: OILER | 16.21 | — | 16.21 |
| OPERATOR: MILLING MACHINE | 12.80 | — | 12.80 |
| OPERATOR: MECHANIC | 19.58 | — | 19.58 |
| OPERATOR: LOADER (SEWARD COUNTY) | 16.04 | — | 16.04 |
| OPERATOR: LOADER (SAUNDERS COUNTY) | 17.19 | — | 17.19 |
| OPERATOR: LOADER (LANCASTER COUNTY) | 17.44 | — | 17.44 |
| OPERATOR: HYDROHAMMER | 17.03 | — | 17.03 |
| OPERATOR: CRANE | 22.38 | — | 22.38 |
| OPERATOR: CONCRETE SAW (LANCASTER, SEWARD COUNTIES) | 20.87 | — | 20.87 |
| OPERATOR: COMPACTOR | 13.36 | — | 13.36 |
| OPERATOR: BULLDOZER (SEWARD, SAUNDERS COUNTIES) | 16.34 | — | 16.34 |
| OPERATOR: BULLDOZER (LANCASTER COUNTY) | 16.78 | — | 16.78 |
| OPERATOR: BROOM/SWEEPER | 11.43 | — | 11.43 |
| OPERATOR: BACKHOE/EXCAVATOR, (SEWARD COUNTY) | 16.15 | — | 16.15 |
| OPERATOR: BACKHOE/EXCAVATOR, (SAUNDERS COUNTY) | 19.47 | 6.07 | 25.54 |
| OPERATOR: BACKHOE/EXCAVATOR, (LANCASTER COUNTY) | 19.91 | 6.07 | 25.98 |
| OPERATOR: BACKHOE LOADER COMBO | 15.94 | — | 15.94 |
| OPERATOR: ASPHALT SPREADER | 18.74 | — | 18.74 |
| OPERATING ENGINEERS:, SKID LOADER (SEWARD COUNTY) | 14.85 | — | 14.85 |
| OPERATING ENGINEERS:, SKID LOADER (SAUNDERS COUNTY).$ 12.51 0.00 OPERATING ENGINEERS:, SKID LOADER (LANCASTER COUNTY) | 10.56 | — | 10.56 |
| LABORER: TRAFFIC CONTROL - FLAGGER AND CONE/BARREL SETTER (SEWARD COUNTY) | 9.00 | — | 9.00 |
| LABORER: TRAFFIC CONTROL - FLAGGER AND CONE/BARREL SETTER (LANCASTER COUNTY) | 11.87 | — | 11.87 |
| LABORER: MASON TENDER (CEMENT/CONCRETE) | 10.44 | — | 10.44 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | 16.07 | 6.55 | 22.62 |
| LABORER, COMMON OR GENERAL (SEWARD COUNTY) | 12.20 | — | 12.20 |
| LABORER, COMMON OR GENERAL (SAUNDERS COUNTY) | 12.55 | — | 12.55 |
| LABORER, COMMON OR GENERAL (LANCASTER COUNTY) | 12.58 | — | 12.58 |
| IRONWORKER, REINFORCING | 19.35 | — | 19.35 |
| HIGHWAY/PARKING LOT STRIPING: LABORER (SEWARD COUNTY) | 11.27 | — | 11.27 |
| HIGHWAY/PARKING LOT STRIPING: LABORER (SAUNDERS COUNTY) | 12.37 | — | 12.37 |
| HIGHWAY/PARKING LOT STRIPING: LABORER (LANCASTER COUNTY) | 11.82 | — | 11.82 |
| ELECTRICIAN, INCLUDES INSTALLATION OF TRAFFIC SIGNALS, (LANCASTER, SEWARD COUNTIES) | 28.83 | — | 28.83 |
| CEMENT MASON/CONCRETE FINISHER (SEWARD, SAUNDERS COUNTIES) | 18.17 | 5.86 | 24.03 |
| CEMENT MASON/CONCRETE FINISHER (LANCASTER COUNTY) | 18.48 | 5.86 | 24.34 |
| CARPENTER (INCLUDES FORM WORK) | 18.51 | — | 18.51 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS, ETC., IN ANY AREA WHERE THE WORKER IS IN A POSITION TO FALL 40 FT. OR MORE, OR WHERE OBJECTS ABOVE THE WORKER CAN FALL 40 FT. OR MORE: TO BE PAID ONE AND ONE-HALF TIMES THE STRAIGHT- TIME RATE OF PAY | 36.00 | 18.99 | 54.99 |
| ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS, ETC., IN ANY AREA WHERE THE WORKER IS IN A POSITION TO FALL 40 FT. OR MORE, OR WHERE OBJECTS ABOVE THE WORKER CAN FALL 40 FT. OR MORE: TO BE PAID ONE AND ONE-HALF TIMES THE STRAIGHT- TIME RATE OF PAY | 35.60 | 18.94 | 54.54 |
| ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS, ETC., IN ANY AREA WHERE THE WORKER IS IN A POSITION TO FALL 40 FT. OR MORE, OR WHERE OBJECTS ABOVE THE WORKER CAN FALL 40 FT. OR MORE: TO BE PAID ONE AND ONE-HALF TIMES THE STRAIGHT- TIME RATE OF PAY | 35.30 | 18.91 | 54.21 |
| ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS, ETC., IN ANY AREA WHERE THE WORKER IS IN A POSITION TO FALL 40 FT. OR MORE, OR WHERE OBJECTS ABOVE THE WORKER CAN FALL 40 FT. OR MORE: TO BE PAID ONE AND ONE-HALF TIMES THE STRAIGHT- TIME RATE OF PAY | 35.00 | 18.88 | 53.88 |
| TRUCK DRIVER: LOWBOY TRUCK | 21.49 | 7.40 | 28.89 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | 13.62 | 2.60 | 16.22 |
| OPERATOR: LOADER | 17.67 | 2.98 | 20.65 |
| OPERATOR: CRANE | 24.00 | 5.56 | 29.56 |
| OPERATOR: BACKHOE/EXCAVATOR | 19.43 | 3.59 | 23.02 |
| LABORER: PIPELAYER | 16.33 | 5.60 | 21.93 |
| LABORER: COMMON OR GENERAL | 13.11 | 3.23 | 16.34 |
| FORM WORKER | 17.48 | 5.74 | 23.22 |
| CEMENT MASON/CONCRETE FINISHER | 16.72 | — | 16.72 |