Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

Davis-Bacon rates — Holmes County, Mississippi

Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.

Pick the construction type that matches your contract, not the highest rate. Building, Residential, Highway and Heavy are separate determinations with different rates, and using the wrong one is a common reason a certified payroll comes back rejected. Where your trade appears under several classifications the choice between them is a judgement call — the plainest match is usually right, and the contracting officer can confirm it.
Building
MS20260046 rev 1 · 05/18/2026 · 12 classifications
ClassificationBase rateFringeTotal
IRONWORKER, STRUCTURAL30.0019.5849.58
PLUMBER30.4111.4741.88
TRUCK DRIVER: DUMP TRUCK13.921.9115.83
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 21.86 11.18 PIPEFITTER22.776.9629.73
PAINTER (BRUSH AND ROLLER)15.17—15.17
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE18.00—18.00
LABORER: PIPELAYER12.520.7513.27
LABORER: MASON TENDER - CEMENT/CONCRETE12.98—12.98
LABORER: COMMON OR GENERAL10.00—10.00
ELECTRICIAN17.039.1026.13
CEMENT MASON/CONCRETE FINISHER20.00—20.00
CARPENTER18.111.6919.80
Residential
MS20260009 rev 1 · 05/18/2026 · 15 classifications
ClassificationBase rateFringeTotal
TRUCK DRIVER10.00—10.00
TILE SETTER8.50—8.50
ROOFER11.16—11.16
PLUMBER12.13—12.13
PAINTER, EXCLUDES DRYWALL FINISHING/TAPING11.44—11.44
OPERATOR: BULLDOZER13.13—13.13
OPERATOR: BACKHOE13.63—13.63
LABORER: PIPELAYER8.31—8.31
LABORER: MASON TENDER - CEMENT/CONCRETE8.03—8.03
LABORER: COMMON OR GENERAL8.07—8.07
ELECTRICIAN14.13—14.13
DRYWALL FINISHER/TAPER15.00—15.00
CEMENT MASON/CONCRETE FINISHER11.57—11.57
CARPENTER, INCLUDES FORM WORK11.32—11.32
BRICKLAYER19.20—19.20
Highway
MS20260090 rev 1 · 05/18/2026 · 44 classifications
ClassificationBase rateFringeTotal
TRUCK DRIVER: SEMI/TRAILER TRUCK15.29—15.29
TRUCK DRIVER: DUMP TRUCK (ALL TYPES)11.99—11.99
TRUCK DRIVER: WATER TRUCK10.89—10.89
TRUCK DRIVER: OFF THE ROAD TRUCK12.29—12.29
TRUCK DRIVER: MECHANIC14.08—14.08
TRUCK DRIVER: LOWBOY TRUCK13.80—13.80
TRUCK DRIVER: FLATBED TRUCK12.64—12.64
OPERATOR: TRENCHER15.00—15.00
OPERATOR: TRACTOR12.56—12.56
OPERATOR: SCRAPER12.96—12.96
OPERATOR: ROLLER (ALL TYPES)11.88—11.88
OPERATOR: PILEDRIVER15.13—15.13
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)12.05—12.05
OPERATOR: OILER12.330.4812.81
OPERATOR: MILLING MACHINE18.16—18.16
OPERATOR: MECHANIC17.07—17.07
OPERATOR: LOADER12.21—12.21
OPERATOR: GRINDING/GROOVING MACHINE15.94—15.94
OPERATOR: GRADER/BLADE14.44—14.44
OPERATOR: DRILL19.22—19.22
OPERATOR: DISTRIBUTOR11.83—11.83
OPERATOR: CRANE21.25—21.25
OPERATOR: CONCRETE SAW10.25—10.25
OPERATOR: BULLDOZER14.15—14.15
OPERATOR: BROOM/SWEEPER10.77—10.77
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE15.25—15.25
OPERATOR: ASPHALT SPREADER16.03—16.03
LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER12.93—12.93
LABORER: PIPELAYER11.34—11.34
LABORER: MASON TENDER - CEMENT/CONCRETE11.08—11.08
LABORER: LANDSCAPE9.77—9.77
LABORER: GRADE CHECKER11.32—11.32
LABORER: FLAGGER10.06—10.06
LABORER: CONCRETE WORKER10.91—10.91
LABORER: COMMON OR GENERAL10.37—10.37
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR10.61—10.61
IRONWORKER, REINFORCING16.29—16.29
INSTALLER - SIGN11.65—11.65
INSTALLER - GUARDRAIL11.42—11.42
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER (LINE STRIPING TRUCK)14.11—14.11
ELECTRICIAN21.807.9329.73
CEMENT MASON/CONCRETE FINISHER15.69—15.69
CARPENTER, EXCLUDES FORM WORK14.03—14.03
CARPENTER (FORM WORK ONLY)13.99—13.99
Heavy
MS20260073 rev 1 · 05/18/2026 · 10 classifications
ClassificationBase rateFringeTotal
IRONWORKER: STRUCTURAL21.008.8129.81
TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES11.66—11.66
OPERATOR: BULLDOZER, INCLUDES WATER SEWER LINES16.31—16.31
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES16.291.7118.00
LABORER: PIPELAYER, INCLUDES WATER SEWER LINES13.291.8815.17
LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES11.271.7112.98
IRONWORKER, REINFORCING18.50—18.50
ELECTRICIAN21.097.6128.70
CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES14.95—14.95
CARPENTER, INCLUDES FORM WORK16.78—16.78
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.