Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | 32.90 | 11.10 | 44.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | 35.50 | 14.55 | 50.05 |
| POWER EQUIPMENT OPERATOR: CRANE | 35.50 | 14.55 | 50.05 |
| IRONWORKER, REINFORCING | 31.00 | 17.77 | 48.77 |
| PLUMBER | 29.91 | 11.97 | 41.88 |
| PIPEFITTER | 30.41 | 11.47 | 41.88 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | 30.45 | 13.88 | 44.33 |
| TRUCK DRIVER: DUMP TRUCK | 14.11 | 0.27 | 14.38 |
| TILE SETTER | 18.00 | — | 18.00 |
| ROOFER | 14.50 | — | 14.50 |
| PAINTER (BRUSH AND ROLLER) | 17.00 | — | 17.00 |
| OPERATOR: BULLDOZER | 15.14 | 1.03 | 16.17 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 17.53 | — | 17.53 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 12.50 | — | 12.50 |
| LABORER: COMMON OR GENERAL | 12.53 | — | 12.53 |
| IRONWORKER, STRUCTURAL | 18.05 | — | 18.05 |
| CEMENT MASON/CONCRETE FINISHER | 18.31 | — | 18.31 |
| CARPENTER | 17.84 | 6.04 | 23.88 |
| BRICKLAYER | 20.29 | — | 20.29 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | 32.90 | 11.10 | 44.00 |
| ROOFER, INCLUDES SHAKE & SHINGLE ROOFS | 12.00 | — | 12.00 |
| PLUMBER | 14.62 | — | 14.62 |
| PAINTER | 11.00 | — | 11.00 |
| LABORER: MASON TENDER - BRICK | 10.92 | — | 10.92 |
| LABORER: COMMON OR GENERAL | 9.40 | — | 9.40 |
| CEMENT MASON/CONCRETE FINISHER | 9.87 | — | 9.87 |
| CARPENTER, INCLUDES FORM WORK | 10.35 | — | 10.35 |
| BRICKLAYER | 12.82 | — | 12.82 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | 32.90 | 11.10 | 44.00 |
| TRUCK DRIVER: SEMI/TRAILER TRUCK | 14.36 | — | 14.36 |
| TRUCK DRIVER: DUMP TRUCK (ALL TYPES) | 11.58 | — | 11.58 |
| TRUCK DRIVER: WATER TRUCK | 17.08 | — | 17.08 |
| TRUCK DRIVER: MECHANIC | 12.31 | — | 12.31 |
| TRUCK DRIVER: LOWBOY TRUCK | 14.18 | — | 14.18 |
| TRUCK DRIVER: FLATBED TRUCK | 14.72 | — | 14.72 |
| SURVEYOR (STAKING, MARKING AND BRUSH CLEARING) | 11.56 | — | 11.56 |
| OPERATOR: TRACTOR | 12.00 | — | 12.00 |
| OPERATOR: SCRAPER | 14.00 | — | 14.00 |
| OPERATOR: ROLLER (ALL TYPES) | 12.17 | — | 12.17 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 11.56 | — | 11.56 |
| OPERATOR: OILER | 12.22 | — | 12.22 |
| OPERATOR: MILLING MACHINE | 16.96 | — | 16.96 |
| OPERATOR: MECHANIC | 13.00 | — | 13.00 |
| OPERATOR: LOADER | 13.99 | — | 13.99 |
| OPERATOR: GRADER/BLADE | 16.09 | — | 16.09 |
| OPERATOR: DISTRIBUTOR | 11.46 | — | 11.46 |
| OPERATOR: CRANE | 14.80 | — | 14.80 |
| OPERATOR: CONCRETE SAW | 13.93 | — | 13.93 |
| OPERATOR: BULLDOZER | 13.99 | — | 13.99 |
| OPERATOR: BROOM/SWEEPER | 10.94 | — | 10.94 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 11.86 | — | 11.86 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 14.20 | — | 14.20 |
| OPERATOR: ASPHALT SPREADER | 14.71 | — | 14.71 |
| LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 12.17 | — | 12.17 |
| LABORER: PIPELAYER | 14.50 | — | 14.50 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 10.57 | — | 10.57 |
| LABORER: LUTEMAN | 12.88 | — | 12.88 |
| LABORER: GRADE CHECKER | 14.82 | — | 14.82 |
| LABORER: FLAGGER | 11.42 | — | 11.42 |
| LABORER: COMMON OR GENERAL, INCLUDING ASPHALT RAKING, SHOVELING, SPREADING | 10.34 | — | 10.34 |
| IRONWORKER, REINFORCING | 16.44 | — | 16.44 |
| INSTALLER: GUARDRAIL | 12.39 | — | 12.39 |
| INSTALLER - SIGN | 12.19 | — | 12.19 |
| HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER (LINE STRIPING TRUCK) | 14.55 | — | 14.55 |
| CEMENT MASON/CONCRETE FINISHER | 11.54 | 1.63 | 13.17 |
| CARPENTER (FORM WORK ONLY) | 12.00 | — | 12.00 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | 32.90 | 11.10 | 44.00 |
| TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES | 16.03 | 0.95 | 16.98 |
| OPERATOR: CRANE | 22.66 | 4.66 | 27.32 |
| OPERATOR: BULLDOZER | 18.85 | 1.18 | 20.03 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 17.39 | 0.86 | 18.25 |
| LABORER: PIPELAYER, INCLUDES WATER SEWER LINES | 14.04 | 1.92 | 15.96 |
| LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES | 12.93 | — | 12.93 |
| IRONWORKER, STRUCTURAL | 19.00 | — | 19.00 |
| IRONWORKER, REINFORCING | 20.63 | — | 20.63 |
| CEMENT MASON/CONCRETE FINISHER | 17.75 | — | 17.75 |
| CARPENTER, INCLUDES FORM WORK | 16.77 | — | 16.77 |